page five

IMG_0320
New Steel for the tender side panels arrived August 13

IMG_0359
A chain and pulley system was rigged over a ceiling beam to help lift the
panel into place. The rivet holes had been drilled along the bottom.


IMG_0362

IMG_0367

IMG_0368
Steve Young places temporary bolts to hold the assembly in place. Next step
will be to mark and drill the rest of the rivet holes in the panel.