Visit the TrainWeb.org Fan Page on Facebook!
Your Ad Here
ACSG Georgia Division - Members
Atlantic Coast S Gaugers - ACSG

Georgia Division
"Promoting S Gauge along the East Coast"
Carolinas Division Tidewater Division
East Tennessee Division Virginia Central Division
Georgia Division Washington & Old Dominion Division
Show Schedule | About the Georgia Division | Recent Shows | Member's Pages
Tom Robinson's 2-8-8-2
Tom Robinson's engines: U33C | Challenger | Big Boy | The Tennessee Central 2012 | More of the Tennessee Central

Tom's new Lionel American Flyer Union Pacific 2-8-8-2 steam engine.

At Rockwood with Challenger in background

Close up of fireman's side

I received my 2-8-8-2 the week of December 15, 2012. I have broken mine in running on the blocks for 30 minutes in each direction and have about 3 hours run time on the layout.

Rear quarter view

The engine did not come with a programming module so I had to enter its data manually. I run Legacy version 5.1. The engine also did not include the front boiler number board as shown in the pictures. It also did not include the nice conversion pieces for installing Kadee scale couplers as on the Challenger and U33C. Lionel has promised to reply to my inquiry about these issues as soon as their replacement parts list is available (probably within two weeks).

2-8-8-2 in foreground, Challenger in background

My only issue in running the engine was the front pilot shorting through two of my American S Gauge turnouts. It was very slightly out of gauge. I had to unsolder the wire to the headlight, remove the pilot, and remove the axle wheel set. I then ground off one of the keepers on the axle and widened the gauge approx. 1/64 of an inch. This may be necessary for any turnouts which require exact wheel gauge. After re-soldering and re-assembling the pilot everything is fine.

Head on view of 2-8-8-2 at Emory Gap, Lionel/American Flyer Pacific on siding

This engine is the best performing model I have. It is smaller than the Challenger and the conventional tender with two swiveling trucks operates much better.

2-8-8-2 on coal train at Harriman. Note new structures in Harriman Industrial area.
2-8-8-2 at Crossville, Challenger on siding in foreground

Return to ACSG Home
Visit the TrainWeb.org Fan Page on Facebook!
Create your own free Rail Blog or Website!

Advertise | About Us | Contact Us | Sign up for our Newsletter | TrainWeb.com

Your Ad Here
Your Ad Here