Black Mesa & Lake Powell (BLKM) was built in 1973 for the sole
purpose of transporting coal from the Peabody Coal Company's Black Mesa
Mine near Kayenta, AZ, to the Navajo Generating Station power plant at
Page, AZ. Coal is mined at the top of the mesa, takes an 8-10 mile conveyor
belt trip to the loading silo's, then 78 rail miles to Page. Their sole
trainset usually makes 3 round trips a day from the mine to Page and is
electrified via the 50,000 volt overhead catenary. BLKM ceased operations
in 2019 with the closing of the Navajo Generation Station.