| 2 of the 3 Wisconsin Rapids switch engines are done for the day. |
.
I rushed and took shortcuts and blurred an early morning picture
of the switch engines in Plover.
The SW 1500 CN/WC 1570 and EJE 660 probably came to Plover together,
and shortly they will separate and do two different switch jobs..
.
|
The next morning, the 1570 is separate, and the EJE 660 (not shown) is working the west end of Plover. It's below zero F for a few days. The weather curtain over the radiator might be handy. |
.
Link back to my index page, Bruce's RailRoad Pictures
my best index page is on the TrainWeb site, as of January 2011.
|
|
|