Springfield Railway
By Colin J. Churcher
The southern part of Nova Scotia was well served by railways in the early part of the
20th century. The Dominion Atlantic Railway (DAR), later Canadian Pacific, had been
built along the western shore as far as Yarmouth where it met the Halifax and South
Western (H&SW), later Canadian National, which was built along the eastern
shore. In addition, the H&SW built a line across the interior from Bridgewater
as far as Middleton where it connected with the DAR. The Davison Lumber Company
built a mill at Bridgewater with the intention of utilizing the hardwood, white spruce,
hemlock and white pine that grew in the area to make lath boxes, box shooks and Union
Brand hardwood flooring. The mill was opened in September 1905.
In order to harvest the lumber, Davison Lumber commenced building a railway line from
Hastings Junction on the H&SW between Bridgewater and Middleton. This was known
as the Davison Tramway which was incorporated under Nova Scotia law (S.N.S. 1903-4, c.
146) to:
... build a railway or tramway from Alpena to a point south of Cherryfield, both on
the Halifax and South Western Ry., and from a point on the latter's Caledonia branch to
the Davison Lumber Company's timber limits; power to generate , use and sell electricity.
In 1905, under a second Nova Scotia charter, (S.N.S. 1905, c. 135) the name was changed
to Springfield Railway and the contract for the first ten miles was let in the same year
to Cavicchi and Pagano, a well known firm of railway contractors. Construction commenced
in October 1905 and the first nine miles were in operation by November 1906. A
roundhouse and machine shop were constructed at Crossburn which became, initially,
the headquarters of the railway. Fourteen houses were also constructed for the
senior, permanent, members of the staff. A second mill was built on the railway a
mile from Hastings Junction.
The first locomotive was a small Porter saddle tank which was equipped with a small
coach which included a cab. It would seat about 16 people. This locomotive was
first run by Edward Braine with Lorne McNair as his fireman.
Two other locomotives were acquired in 1905. #2 arrived in July from the
Pittsburgh and Lake Erie Railroad and #3, a 45 ton shay, came new from Lima Locomotive
Works in August. George Dorman and Reg McGill were the regular engineer and fireman
respectively of #2. In was not in very good shape and needed repairs in the winter
of 1905-6. In its place the H&SW leased their #44 with engineer Phillip Devew
and fireman Bob Copeland. #44 was returned to the H&SW in May 1906.
The company decided to build the line themselves in the spring of 1906. As the name
suggests, Cavicchi and Pagano employed a number of Italians. Some 200 Italian
labourers stayed on to work on the line. They had an Italian foreman who could speak
English. The Steelman was George Murray while the Walking Boss, Daniel Wier, had the
reputation of being a hard driver.
Another shay, #4, arrived new in March 1906 and this was the regular engine for George
Beatty and Fred Dorey. #5 came on the property in July of the same year. This
came from Lima and may have been new. It was an 0-6-0 with a sloping tender.
It was never a success because it tended to spread the rails. It was converted to a
2-6-0 in 1908 but this didnt make very much difference. This engine was known,
for obvious reasons, as the cow.
Crossburn was a very busy place at this time. The railway was hauling logs both
day and night. A school house was built as was a club house. The latter was
the social centre of the little community where one could find wrestling, boxing and
dancing. The pie sales were well known, one being sold for $26, an enormous amount
for a pie in 1906. The main line was completed to South River Lake, 28.9 miles in
1908 and ballasting was completed in 1909. The company then completed to build the
following lines off the main line:
Ell Lake spur
Torment branch
Nimchin branch
Cloud Lake branch
Twin Lake branch
Moose Lake branch
Tomahawk spur
This was a much cheaper method of transport than bringing the logs to the main line
because logs could be loaded on to flatcars more cheaply from water than from land.
The logs were loaded on to the ice in the winter and moved by water to the loading point
in the summer. Another advantage is that the logs did not become worm eaten when
loaded from the water. The last branch to be built was the Cloud Lake branch in
1913. This 11 mile line was never ballasted. It suffered a forest fire just
after completion which destroyed some wooden trestles. Two shays and some flatcars
were marooned until the trestles could be rebuilt.
The Davison Lumber Company had running rights over the H&SW to Bridgewater to gain
access to their mill. These were exercised regularly by Davison Lumber Company
trains using their own crews. Only those men who had written the standard rules
could run on the main line, the others were restricted to the Springfield Railway.
These running rights also extended to the H&SW branch between New Germany and
Caledonia. In 1914 running rights were also obtained over the H&SW between
Hastings Junction and Middleton. The reason for this was to obtain access to
additional spurs which were built by the Davison Lumber Company off the H&SW. A
number were built and at least the following are known:
Mud Lake (from Springfield Station, H&SW, 7 miles)
Joe Simeon Lake
Waterloo Lake
Shannon Lake
Another new shay, #6, arrived from Lima at Hastings Junction on Christmas Day,
1915. This was a 70 ton model and W.B. Sherrard was the first engineer. This
was the last locomotive to be purchased - indeed it was the only one to survive the
carnage which was to follow shortly.
The war years were generally very busy for the Davison Lumber Company. Crews made three
trips per day from several different points and fifteen hour days were frequently worked.
The centre of operations was moved from Crossburn to Hastings Junction around 1916. The
locomotive and machinery shop was moved out and new houses were built for the permanent
staff. Locomotive #1 was broken up in 1915 and #2 in 1919.
Disaster struck in November 1920 when the Davison Lumber Company went into
liquidation. The once busy railway went deathly quiet and remained that way until
April 1921 when the mill started up but only to cut up the left over logs. Royal
Trust, which now owned everything, was intent on getting its pound of flesh. The
mill finished its work on July 21, 1921 and the Springfield Railway closed down for
good. There was 34 million board feet of sawn lumber in the mill yard when the
operation closed. Work started on lifting the rails in 1921 and was finished in
1922. In all, some 60 miles of rail were lifted, inspected and shipped to Halifax
where they were loaded on to tramp steamers and shipped via Panama to British
Columbia. Of the locomotives, #4 was cut up straight away and so was #3 with the
exception of the boiler which was used in a local mill. The boiler of #5 was removed
from the frame and stored in the mill at Bridgewater for some time before it, too, was
scrapped. #6, less than six years old at closure, was shipped back to Lima which
later sold it to a lumber company in North Carolina. When the scrapper had finished
there was very little left. Four Clyde cranes, a steam shovel and sixty flatcars
were also cut up on the spot.
The Springfield Railway had a relatively short life although one must not forget that
such railways were not regarded with the permanence with which we tend to look at railways
today. It was built to obtain access to timber. When the timber was exhausted,
or when the demand dropped, the line was quickly torn up.
It remains to finish these notes with a locomotive roster for the Springfield Railway.
| # |
Builder |
Builder# |
Acquired |
Type |
Notes |
| 1 |
Porter |
1612 |
Sep 1895 |
0-4-4ST |
(n) Munising
Railway #1, Hallston, MI;
[2] Davison Lumber #1, 1905; scrapped 8/15. |
| 2 |
Pittsburgh |
1598 |
Jan
1898 |
4-6-0 |
(n) P&LE #88;
[2] Davison Lumber #2, 7/05; o/s 1919, scrapped 1919. |
| 3 |
Lima |
990 |
Apr 1905 |
Shay 2 |
[n] Davison
Lumber #3; scrapped 1922. |
| 4 |
Lima |
1647 |
Mar
1906 |
Shay
2 |
[n]
Davison Lumber #4; scrapped 1922. |
| 5 |
Lima |
1017 |
Aug 1906 |
0-6-0 |
[n] Davison
Lumber #5; r/b to 2-6-0 1908; scrapped 1922. |
| 6 |
Lima |
2778 |
Dec
1915 |
Shay
2 |
[n] Davison Lumber #6;
(2) Lima 1921-2;
(3) Moltz Lumber, Lake Toxway, NC;
(4) Murphy Lumber & Mill, Murphy NC. |
[ ARTICLES
]
©1998 Colin J. Churcher, Ottawa, Ontario,
Canada. Please visit my railway pages at: http://infoweb.magi.com/~churcher/
, all rights reserved. |