TrainWeb.org Facebook Page
we&h

STRUCTURES
    MT interlocking tower guards the entrance to the main yard on the new WE&H.  It is seen here in July 2008 shortly after placement.  Eventually the road will be placed across the tracks, near the photographer.  Both MT and the switch shanty behind it were salvaged from the original WE&H layout.  The second shot is it in Dec 2008 with the gravel road added and the rest of the ground cover around it placed..



Below is a shot of the Maintenance of Way (MofW) buildings at the main yard when placed in July 2008.  They too were also salvaged from the original WE&H layout.  The next shot is in Dec 2008 with the ground cover in place and the yard tracks ballasted.


Below is a shot of the new engine service facility and grain elevator.  Both are structures that were salvaged from the original WE&H layout.

Corporate History Actual Layout Track Plan
Theoretical Track Plan
Locomotives
Freight Cars
Cabooses
Structures
Misc Features
Layout Construction Pictures
Original WE&H
WE&H Roster


 Chessie Website Links

My Model
Roster
Locomotives Cabeese Freight
Cars
Structures Vehicles People
My
Gallery
Others
Gallery
Layout
Stats
Layout
Design
Layout
Tips
Other
Railroads

Model Kit
Reviews
Modeling
Skills
Modeling
Tips
Reference
Books
Paints and
Decals
Chessie
Roster 
Chessie
History
Prototype
Pics

WE&H FAQs About the
Author
Editorial Links Home