Hanging Yard Construction Plans: Phase 5

Hanging Yard Construction Plans:
Phase 5
February 1, 2001

Back to the JLS Railroad Plans Archive

The final rendition of the Hanging Yard's track arrangement. The lead switch, which is continuous with the first tier of the Helix is still unknown. Surprisingly enough we were able to squeeze 7 long sidings in this very small area (thanks in part to the genius of Skip Densing). The lengths of the sidings have yet to be calculated as well, but should be on the order of 10 to 12 feet each.

 