TrainWeb.org Facebook Page
Hi-line Turntable Construction

Hi-line turntable construction - 01/11/03

Elizabeth grinds the welds on the table while Frank adjusts the level with a sledge.

Jim drilling the holes in the steaming bay adjustment plates.

The structure takes shape...

All the posts are in place. Jim grinds off the leftovers from the fourth rail.

An overhead view of the turntable structure.

This is what we envision as the final look for the turntable bridge.

Grinding welds on the two assembly plates. The base had to be shipped in two halves and these plates and
welded bolts allow reassembly at our club.

After a very long day...

Photos of the arrival at MLS...

Home