Ballast
tamper at work at the beginning of the line by OSF911. (7/00)
East &
North
View
looking west along the north part of the line (5/99)
Right
of way construction continues. Ties have been laid out along the curve to
start the right of away heading west along the north edge of WAPI. (5/99)
Here
is the NE curve looking west in 8/2000 during Steamup 2000.
The
north part of the line looking east, wire was just installed (7/00)
Westside
Work
crew spiking the rails along the western leg of the right-of-way (1/01)
Poles
and wire up for the westside. (7/01
End
of the line as of 7/01
Further
extension
1187
at current end of track on the westside
Parade
Grounds
Looking
south, mainline being cut by the Brooks depot (2/02)
Concrete
poured and rails in place (3/02)
Looking
north at the Depot and the mainline. (3/02)
A
little further north looking towards the sawmill which will be moved to
accommodate the trolley line.
Looking
west from OSF911 at the line being cut towards the sawmill. (2/02)
Forms
are in place
Eastbound
view of the curve. (3/02)
MUNI1213
is waiting for track to be extended!
New
Wig-Wags protecting the road crossing.
1187
negotiating the parade ground extension.
1187
at current end by Brooks Depot with temporary ticket shelter.