AUGUST 2004
The mainline is completed and we get trains running again

08/13/04:  By this time I had the main line finished around the back of the upper curve and had started heading back and crossing over the main line.  I propped the track up with some blocks and pieces of concrete to get an idea where I would need fill.  I ordered 3 1/2 yards of top soil  and carted it from the drive way to the back yard one wheelbarrow full at a time.  After dumping the fill I got the track installed by the coal mine and installed the sidings for the mine.

8/20/04:  Once I got up the curve by the mine I had to cross the large valley where the main line below entered the tunnel and the stream from the waterfall.  I tried a number of configurations before deciding on a combination of a LGB truss bridge and a series of Garden Metal Models steel deck bridges.  I ordered and received the LGB bridge but it was going to take longer to get the GMM bridges so I made some temporary bridge out of 2/4's and painted them black.

8/23/04:  Today we got the last section of the mainline reconnected and ran our first train all the way around the layout.  After working on some track adjustments and a little leveling our main line was officially back in operation.  I ordered another 3 yards of dirt to fill in the hills (ugh!)  Next I started working on the sidings and the rebuilding of the yard at Spruce.  We got the yard back together and started working on the wye.



  Free Web Hosting Since 1996. Join & Become Part of the TrainWeb's Railroad Community.