Search Railroad Sites For:
Camas Prairie RailNet

Camas Prairie RailNet - CSP

Route:
Riparia, WA - Lewiston, ID (70.5 miles)
Lewiston - Spalding - Orofino - Kooskia - Stites, ID (74.5 miles)
Spalding - Grangeville, ID (66.5 miles)
Orofino - Revling - Headquarters, ID (31.0 miles)
Headquarters:
Lewiston, ID
Junctions with other railroads:
UP: Riparia, WA
Radio frequencies:
161.250 Road Lewiston east
161.100 Yard switching
160.740 Third Sub to Ayer
History:
CSP created in 1909 to operate line owned jointly by NP (BNSF) and Oregon-Washington Railroad & Navigation Co. (UP).
Track between Kooskia and Stites (1.9 miles) abandoned in 1985.
Track between Revling and Headquarters (9 miles) abandoned c.1988.
Joint BNSF/UP overations taken over Apr 18, 1998 by Camas Prairie RailNet.
Permission to abandon Grangeville Line received from STB on September 12, 2000.
Grangeville Line sold to BG&CM Railroad in December 2002.
Railroad sold to Watco, which began operations as the Great Northwest Railroad effective March 4, 2004.
Ownership:
North American RailNet
Roster:
Unit Bldr. Model B/D B/N F/N History Acq. Ret. Notes
1 GE B23-7 2/1981 43115 nee NS 3995 1998 2004 to IR 1, 2004
2 GE B23-7 3/1981 43122 nee NS 4002 1998 2004 to IR 2, 2004
3 GE B23-7 4/1981 43379 nee NS 4020 1998 2004 to IR, 2004; to GFRR 3 (possibly)
4 GE B23-7 9/1978 41980 nee NS 3971 1998 2004 to IR, 2004; to GFRR 4 (possibly)
5 GE B23-7 2/1981 43111 nee NS 3991 1998 2001 to GFRR 5, 2001
6 GE B23-7 4/1981 43371 nee NS 4012 1998 2001 to GFRR 6, 2001
7 GE B23-7 3/1981 43128 nee NS 4008 1999 1999 to MT 7, 1999
143 EMD SW1000 10/1966 32178 4501-4 nee DRGW 143 1998 2004 to IR, 2004; to GFRR 143 (possibly)

Explanations:

B/D
Builder's Date
B/N
Builder's Number
F/N
Frame Number
Acq.
Year unit acquired
Ret.
Year unit retired
Reporting Marks


Return to Western Shortline Rosters

Last updated: October 9, 2004



  Free Web Hosting Since 1996. Join & Become Part of the TrainWeb's Railroad Community.