Your Ad Here
Valley Model Railroad Association

 

Valley Model Railroad Association
Established 1949

 

Home Page

News & Events

History

Contact Info

Photos

Layout Operating Rules

Links













































Photo Page 5

.

Photo 41
Joe Waldeck seals the new bench work at Walt Main in preparation for track installation.
Photo 42
Overhead photo shows bench work and bridge construction at Walt. The rail under the bridge is the trolley line which is also under construction.
Photo 43
Steve Foglio power sands the homabed roadbed to facilitate the installation of the new diamonds.
Rail Superintendent Larry Fries is adjusting scenery using a state of the art power shovel. This will allow the proper spacing for the placement of the mainline and siding at Walt.
Photo 45
Illinois Central 's City of New Orleans is the first train to occupy the new mainline trackage and bridge work at Walt.
Photo 46
Valley Model Railroaders hit the road for Wheaton, IL. The occasion is the May 2009 Great Midwest Train Show.
Photo 47
A young visitor operates a local freight at the Great Midwest Train Show using a wireless DCC controller.
Photo 48
.
Photo 49

.

Photo 50
These are some of the control circuit boards for running the signals and switch motors on the layout. The layout will have full CTC control in future. The installed signals are presently running in APB (Automatic Permissive Block) mode and the present switch motors can be thrown from a computer or from the DCC system. To see more about the layout operations visit the Operating Rule Page.

 









  Free Web Hosting Since 1996. Join & Become Part of the TrainWeb's Railroad Community.
The following uses RAILsearch.com to search just rail related websites: Google Custom Search
About Us  |  Advertise | Contact Us Tell a friend about this page  |  Sign up for the TrainWeb Email Newsletter