JLS Railroad Hanging Yard Construction: Installation of the Track
JLS Railroad
Hanging Yard Construction
Installation of the Track
The following photos illustrate the installation of all track
in the Hanging Yard. Again, for detailed construction schematics,
please refer to the JLS
Railroad Construction Plans Archive...
click any smaller picture to
view a larger picture
The lead of the Hanging Yard, the point at which the
yard interchanges with the Helix.
At this stage, all switches in the front section of
the Hanging Yard have been measured for and installed.
The switches and beginning sections of the sidings.
The second board has been installed in this photo and
the sidings themselves are being installed and screwed down.
JLS
Railroad Hanging Yard Construction Plans Archive
Back
to the JLS Railroad Picture Archive