TrainWeb.org Facebook Page
South Brooklyn Railway

.
I
NDUSTRIAL & TERMINAL RAILROADS & RAIL-MARINE OPERATIONS OF BROOKLYN, QUEENS, STATEN ISLAND, BRONX & MANHATTAN:

South Brooklyn Railway So Bk Rwy SoB SBRR Railroad SBK

SUNSET PARK, BOROUGH PARK, GREENWOOD, KENSINGTON, PARKVILLE, GRAVESEND, CONEY ISLAND, BEDFORD and BATH BEACH; BROOKLYN

South Brooklyn Railway New York Municipal Railroad Prospect Park Coney Island Long Island Nassau Street Rapid Transit Manhattan Heights

.

updated:
Tuesday, 22 September 2026 - 15:00


update summary:

date: chapter:
Dave Klepper images ca. 1930 - 1948 added 22 September 2026 multiple locations, multiple locomotives
NYTM archives images added: street survey, 37th Street right of way, Robers Foods, Tenth Avenue Yard; McDonald Avenue & Avenue P, Avenue S, Avenue X, Avenue Y, Avenue Z; Culver Yard, Team Tracks & freight house
21 September 2026 Location List
Index tabulated, chapters reorganized
19 September 2026
1978  - Beginning of the End of the Old Era chapter added, documents added
17 September 2026
1978: The beginning of the end for the old era of operations
1968 / 1976 / 1981 / 1994 South Brooklyn Railway Operations Manual added
11 September 2026 Crew & Train Operation & Operations Manual
New diagrams, redrawn maps and expanded chapter on car clearances and tags
09 September 2026 Car Clearances
October 1946 B. Hirsch photo of #9006 in use
27 August 2026 Locomotive & Equipment Photos
J. McCluskey R32's on pedestal cars images added
02 August 2026 Update 2026: outbound R32's, R44's and R46's
Great oblique aerial images of First, Second & Third Avenue Yards!
25 July 2026 39th Street & First / Second Avenue Yard
Update 2026: new incoming equipment, Railcar Acceptance Facility, et al;
#5 at 37th Street Team Track images added
#8 and #9 (first) images added
09 July 2026 Update 2026
9) Greenwood Ind'l Sidings & 37th Street and 13th Avenue Freight Sta.
Locomotive Photos

.

..


.

.

As this particular webpage deals with an active railroad and company,
viewers should be aware that this webpage, the author(s) or its contributors are not affiliated with:
.
the South Brooklyn Railway, New York City Transit Authority, Metropolitan Transit Authority,
the City of New York, New York City Economic Development Corporation; South Brooklyn Marine Terminal,
Axis Group, Davidson Pipe Supply Company, or Costco Wholesale Corporation;

or any of their subsidiaries, holding companies or parent organizations, employees or otherwise;
and no affiliation or connection with those companies or municipalities is suggested or implied.

This website and the information contained within has been compiled for the use of reference only, and any inaccuracies are purely accidental.
This webpage sees revision for the purpose of the addition of information, or correction of inaccurate data.

Also, this website does not condone or authorize anyone not employed or affiliated with the above companies or agencies
to enter the properties thereof, or the taking of photographs (digital or otherwise) from other than public property and access points.


..
Page 1


Index

Overview
Historical Operations:

Private Ownership
Route Segment - Mileage
New York City Ownership
An In Depth Look Into SBK Delivery

The Trolley / Streetcar Delivery System
Car Load & Less Than Car Load
Customers & Freight Station Locations

Pier Stations
Ash & Cinders
Liquid Asphalt
Newspapers
US Mail
Subway Tunnel excavation spoils
Paramount Station
Customer List / Siding List
The Decline

Crew & Train Operation

Operations Manual (with revisions to 1968 / 1976 / 1981 / 1994)
The Crew
Freight Car / Train Movements
Trackage, Right Of Way & Facilities

Trolley Motor Era:  1900 - ca. 1940
Fixed Route Era:   ca. 1940 - 1978
Car Clearance Tags & Routing
An alternative not used
Signaling


Rerouting Through the Years - A Synopsis


Location List

1)    First / Second Avenue Yard - 39th Street
2)    Second Avenue / Bush Terminal Interchange "Bush Junction"
3)    Third Avenue Freight House, Yard & Davidson's Pipe
4)    Third / Fourth Avenue & 38th Street "Public Yard" "Unloading Yard"
5)    BMT Fourth Avenue Line - West End Line Interchange - "Freight Tower"
6)    36th Street - 38th Street BMT Yard
7)    SBK / BMT "Materials" Yard - 37th Street "10th Avenue Yard"
8)    37th Street & Ninth Avenue Freight Station
9A- 9M)   Greenwood Industrial Sidings (Prospect, Kleins, Phoenix, et al)
10)  Kensington Junction
11)  20th Street and Ninth Avenue Depot (car barn)
12)  Parkville Junction (Penn Central / Conrail / LIRR Bay Ridge Branch)
13)  Avenue S & Gravesend (McDonald) Avenue - Flatbush Coal
14)  Avenue U Station - Brooklyn Jockey Club
15)  Culver Depot and Coney Island Yard
16)  Bedford Freight Station
17)  Motor Truck Delivery
1978: The beginning of the end of the old era
The Last Customers:   1978 - 1994
Dual Couplers, Compromise Couplers & Transition Cars Original Right Of Way Remnants
Escort Vehicles Memorabilia Memoirs
.
Current Era Operations:
Update 2026:   Inbound R211T's and outbound R32's, R44's and R46's
NYCTA R252 flatcars - June 2019 NYCTA R156 locomotives - May 1, 2012 LIRR Caboose C-60 - April 4, 2009
Bernard Linder /  Paul Eppler ERA South Brooklyn Railway Article Series
(reprinted with permission of Electric Railroaders Association)
Special Thanks
.

.
Page 2:
Locomotive & Equipment Overview

Locomotive & Equipment Photos
electric & diesel including videos!

Locomotive & Equipment Roster
builders data, previous owners & disposition info

.

.



Overview

   The South Brooklyn Railway, was but a fifth common carrier railroad located in Brooklyn, and it is often overlooked as it did not have a freight terminal or float bridges of its own, as did Bush Terminal, Brooklyn Eastern District Terminal, Jay Street Terminal and New York Dock. 

   But the South Brooklyn Railway did have its own freight station (actually several) along its route - the largest being their main station located between Second and Third Avenues, between 37th and 39th Streets.

   But the South Brooklyn Railway's history is richer than that, and it rightfully deserves it own place in the annals of Brooklyn railroading history.

   Having first been operational since 1892; the South Brooklyn Railway predates that of all the other terminal railroads, except for the Brooklyn Eastern District Terminal, having started as Palmer's Docks in 1870, and was different in many ways; from the typical freight terminal operations.

   First, it was organized around and utilized the vast trolley network of Brooklyn. Anywhere a trolley went, a freight box motor (basically an electrically powered boxcar) could go. These freight box motors were self powered (through the trolley wire) and compact. They only needed one person to operate: a motor man; and so simple to operates, that some businesses were allowed to have their employees operated the car between internal sidings (with brief training of course.)  Freight box motors were nimble, and a siding could be installed in most small driveways and alleys and even unimproved lots and yards.

   Another notable fact about the South Brooklyn Railway: they were the first to offer freight car door to customers door trucking service "door to store" via their Paramount Station at Third Avenue. All the other terminal railroads were conventional in where  "you come and get it" or you hired someone to come and get it for you. The South Brooklyn Railway delivered it to you, which was a very novel approach before wide spread teamsters and motor trucking outfits became prolific.

   Another fact that made the South Brooklyn Railway unique among the other four Brooklyn freight railroads: it would come to be owned by a quasi-governmental agency of the City of New York. First, is was acquired by the City of New York Board of Transportation, when the Brooklyn Manhattan Transit "BMT" was absorbed in 1940; and then the Board of Transportation's successor: the New York City Transit Authority in 1953; whereas the other four Brooklyn freight railroads remained held by private corporations.

   

.



Historical Operations


South Brooklyn Railroad & Terminal Co. Freight House - September 7, 1938
William J. Rugen photo
Looking east: Automobile is on Second Avenue, between 38th Street (left) and 39th Street (right).
This structure would be razed unknown year, and the location subsequently occupied by a brick yard, Davidson Pipe, and now CostCo Wholesale club.
original image courtesy of Queens Public Library Digital Archives
via P. Matus

added 13 July 2010

.

.

Private Ownership: 1887-1940

   A great deal of the information for this chapter comes from "The Elevated Railways of Brooklyn and the BMT Subway" by Eric Oszustowicz, and he has graciously allowed the use of this information here. I don't believe a more comprehensive early history of the South Brooklyn Railway has been assembled, and I for one am grateful for his work and to be reuse it here.

   The South Brooklyn Railway or "SBK" (as it is known within New York area railfanning groups) as organized, was unique in the fact that it at one time; handled both freight and passenger service.

   This webpage will focus itself upon the freight aspects of their operations,
with intermittent mention of passenger operations where relevant.

   According to the New York Times article dated July 16th, 1892 (seen at right); the South Brooklyn Railroad & Terminal Company was organized in 1887, but its history really predates this by one year.

   On September 29, 1886, the South Brooklyn and Flatbush Railroad Company was incorporated to operate a steam railroad. Historical recordings reflect that this company never started construction and on November 10, 1887; the name was changed to South Brooklyn Railroad & Terminal Company. 

   Even at this time, it was not an operating railroad in that it owned no locomotives or rolling stock, but had been merely organized as a property holder no longer than a few city blocks. It was organized with the intent for that property to be leased to another operating railroad that wished to the connect to the Ferry Terminal at the foot of 39th Street. Unfortunately, no other railroads showed interest, and the land remained unused.

   In 1892, the South Brooklyn Railway & Terminal Company spent a great deal of money to purchase that land and extend the route to the new ferry terminus at the foot of 39th Street and the shoreline of New York Harbor. A Terminal Station and freight house was built at Third Avenue & 37th through 39th Streets.

   Freight business began in April 1896 when the South Brooklyn entered into contract with the National Express Company to carry freight in seven express trolley cars. One more express trolley entered service four months later.

   On June 30, 1897; the Nassau Electric RR turned over its lease on the South Brooklyn Railroad & Terminal to the Long Island Railroad (which had been operating passenger trains from their own ferry terminal at 65th Street via the Bay Ridge Branch and connecting with the Prospect Park & Coney Island RR at Parkville Junction), and as a result, LIRR eliminated their Bay Ridge Branch to Parkville Junction passenger train).

   Quick side bar here: in 1893, Andrew Culver sold his Prospect Park & Coney Island RR (which ran along Gravesend Avenue) to the Long Island Rail Road.

   The Long Island Rail Road operated the South Brooklyn Railway & Terminal Company using steam powered locomotives (former elevated locomotives of 0-4-2T and 0-4-4T wheel arrangements) from June 1897 and until June 1903.

   Unfortunately, these locomotives were not adequate for freight operations, and the line was electrified in 1899. In spite of this, the LIRR continued to run irregular steam powered "Racetrack Specials" to the Brooklyn Jockey Club / Gravesend Racetrack located between Kings Highway and Avenue U, between McDonald Avenue and Ocean Parkway., with passenger railroad service via sidings on McDonald Avenue.

.

The Aught's

.

   On December 19, 1899, the South Brooklyn Railroad & Terminal Company would go into foreclosure, but would continue operation by the Long Island RR., and on January 13, 1900, the SBRR&T Co was reorganized as the South Brooklyn Railway by the new owners, Brooklyn Rapid Transit. Even under this new Brooklyn Rapid Transit ownership, the Long Island Rail Road would continue to operate the trains.

   In 1900, Irving T. Bush of the "Independent Stores" (soon to become Bush Terminal) advised the Brooklyn Heights Railroad (a BRT subsidiary) that their trolley cars should handle freight as well, and by installing private sidings for the service of such. Following this, the BHRR formed a freight department.

   In June 1903 (some references cite 1905), the Long Island Rail Road ceased operating the trains on the South Brooklyn Railway and Brooklyn Rapid Transit would assume passenger service.

   It should be recognized that in these early days of operation, being a subsidiary of the Brooklyn Rapid Transit; the freight was operating over several dozen of the already established streetcar routes, that by this time had been absorbed under the parentage of Brooklyn Rapid Transit.

   Walter S. Wells, former manager of South Brooklyn Railway freight traffic recalled the method of interchange between South Brooklyn Railway and Bush.  In 1905, South Brooklyn Railway 's freight was sorted by Bush Terminal into trolley hauled freight and steam hauled freight, and both of these were placed in the Bush Terminal Yard at Second Avenue between 40th and 41st Street. 

   South Brooklyn Railway trolley motors would venture of to the Bush Terminal Yard and carload freight would be transferred directly from freight car to trolley motor, and Less Than Car Load (LCL) freight would be transferred from the Bush Terminal freight house to other trolley motors.

   Carloads like tank cars, gondolas of stone, etc; were also brought in by Bush Terminal locomotives, but these went to the 38th Street and Second Avenue Yard, where South Brooklyn Railway locomotives would take the car throughout their route. Under the contract that existed with the Brooklyn Height Railroad (the parent organization of the South Brooklyn Railway) at this time, the Bush Terminal RR supplied the interchange yard, provided the freight car transfers, and the office space for the Brooklyn Heights freight representative.

 As such, some of the very early images show the equipment marked as BRT Freight Department.

   With the development and growth of Bush Terminal, and increasing amount of freight traffic destined for the South Brooklyn Railway, the yard at 40th ans 41 st Streets was growing inadequate. Bush Terminal constructed a new freight yard located between 47th and 48th Streets and First and Second Avenues,where a freight agent of the South Brooklyn Railway had an office. 

   During this period, the South Brooklyn Railway ran on Bush Terminal tracks from Second Avenue, down 41st Street, and along First Avenue to 48th Street. When the BRT second Avenue tracks were completed, South Brooklyn Railway would use the Second Avenue routing exclusively. 

   When Brooklyn Rapid Transit assumed control of the South Brooklyn Railway in 1903 (nineteen aught three), it was able to operate passenger service, but not the freight service aspect; therefore the Long Island Rail Road handled the freight service. But, it soon became apparent that this joint operation was both cumbersome and of added expense and likewise not practical from a profitability standpoint. Therefore, on April 10, 1905, the South Brooklyn Railroad began hauling its own freight on the Culver Line. 

   At this time, any freight cars from Class 1 trunk line railroads coming through the Long Island Rail Road for the South Brooklyn Railway would be interchanged at Parkville Interchange at Gravesend Avenue (to become McDonald Avenue in 1931) and Avenue I . However, due to the unfavorable division of the freight tariffs, the management of South Brooklyn Railway now directed most of their freight traffic through Bush Terminal; because at this time, Bush Terminal was able to directly receive freight cars from out of state trunk lines via their float bridges, whereas the Long Island Rail Road did not have a car float facility in Brooklyn at this early stage. Long Island Rail Road hauled freight would have to either become generated on the LIRR network (Brooklyn, Queens, Nassau & Suffolk Counties, or arrive via their Long Island City freight terminal which did have float bridges); where they would then have to haul the freight cars east to Fresh Pond Yard in Glendale, Queens and then onto the Bay Ridge Branch to head south to Parkville Interchange or 63rd Street and First Avenue, which obviously added extra handling and mileage.

    This choice in reducing traffic to and from the Long Island Rail Road, appears to have contributed to the dispute of rental charges of the Coney Island freight house; where the Long Island Rail Road was the owner and the South Brooklyn Railway the lessee. As the South Brooklyn Railway needed the freight house for Less Than Carload freight delivery in the Coney Island area, but under the original arrangement of $1000 per year rental, if the profits from the South Brooklyn Railway freight service to/from this location did not exceed the $1,000 per annum rental fee; the South Brooklyn Railway was operating this location at a loss. Therefore it wanted more favorable terms. Also, the freight house was old and dilapidated. 

   It is obvious that if prevailing freight charges were right around the same amount or more than, the rent, there would be no issue. But apparently the South Brooklyn Railway was operating this location on that very fine line between profit or deficit. Ultimately, the parties involved agreed to a temporary month-to-month lease of $83.33 per month (which comes to $999.96 for the year.) 

   Following amendments made to the regulations of the Interstate Commerce Commission Act of 1907, this resulted in a reorganization of freight haulage by the South Brooklyn Railway and other subsidiaries of Brooklyn Rapid Transit. The conclusion was that all freight handling was now assigned solely to the South Brooklyn Railway. 

   As such, the South Brooklyn Railway entered into multiple trackage agreements throughout the following year with the Brooklyn, Queens County and Suburban RR; the Brooklyn Union Elevated; the Sea Beach Railway; and Nassau Electric Railroad among several others subsidiaries of BRT. 

   An agreement with the Long Island Rail Road was signed to allow the LIRR to haul special trains to the Brooklyn Jockey Club located at Avenue U and Gravesend Avenue (this agreement augmented a prior agreement between the LIRR and the Brooklyn Heights Railroad for the same service and considerations.)

   In 1908, the South Brooklyn Railway entered into agreement with many of the BRT's subsidiary operating companies to provide express and US mail delivery operations over their trolley lines.

.

The Teens

.

   A significant date in South Brooklyn Railway history took place on March 13, 1913 and after the "Dual Contracts" were signed. The South Brooklyn Railway's subgrade cut along 38th Street between Fourth and Tenth Avenues became instrumental to the construction of the West End Line and the Fourth Avenue Subway. Therefore the South Brooklyn Railway conveyed to the City of New York, a permanent right of way and in return, the City leased trackage rights to the South Brooklyn Railway. And when construction began, the South Brooklyn Railway hauled the excavated materials from the tunnel boring and the Sea Beach line's excavation; and not an "outside" contractor.

   With this increase in haulage by 1914, the South Brooklyn Railway purchased 26 air dump cars and (numbered 3052-3059 and 3062-3079) but most importantly, it ordered two more locomotives from General Electric: #6 (first) and #7 (first), which were 55 tons, 800 horsepower, trolley wire and third rail capable.

   Please note: these are NOT the same #6 and #7 locomotives that we are familiar with today, that are / were in the Museum fleet. The two locomotives purchased on this date in 1914 were the first pair of locomotives purchased and were the later locomotives predecessors. The South Brooklyn Railway sold these two locomotives when the subway excavations were completed: #6 was sold to West Side Railway in Charleroi, PA in December 1917; and #7 was sold October 1917 to Interurban Railway, Iowa #806. When rail traffic increased again following World War I, the current #6 (second) and #7 (second) were purchased in 1921.

   When the Fourth Avenue Subway was under construction, a temporary trolley wire was installed to allow the South Brooklyn Railway to bring trolley flats and trolley gondolas to the site, then once loaded, remove them and bring them to dump sites in vacant lots around 86th Street. Steam shovels were filling one trolley gondola every three minutes.

   Also necessary to the construction of the subway and the elevateds, steel girders and support columns of every size and length were manufactured out of Brooklyn, carfloated from New Jersey to Brooklyn by the Bush Terminal Railroad, then interchanged with South Brooklyn Railway. The South Brooklyn Railway then brought them directly to the site of construction; where hoists would unload the girders direct from the railroad car. Rails and ties and other materials necessary to the construction, also arrived the same method. 

   In 1914, with the influx of new subway cars for the New York Municipal Railroad (another subsidiary of Brooklyn Rapid Transit) they needed storage space. So, the NYMRR leased the South Brooklyn Railway's 39th Street Shops (the freight house) as well as their 38th Street Yard for a term of five years. This led to NYMRR to build a huge yard west of Second Avenue on South Brooklyn Railway owned property for the storage of rails, ties, and ballast; but the South Brooklyn Railway retained trackage rights in this yard.

   Because the Bush Terminal Railroad was the primary source of incoming freight cars, (and because Irving T. Bush was a very astute freight terminal operator and businessman) the South Brooklyn Railway entered into an agreement for a track connection from this yard, to the Bush Terminal tracks on First Avenue. Under this agreement, South Brooklyn Railway paid Bush Terminal RR $1.90 per car and locomotive (no "light" locomotives - those not hauling cars) between the interchange track at 41st Street and the Long Island RR at 63rd Street.

   In 1914, 20 more dump cars were purchased (3080-3099) as well as four rail cars: 9978, 9979, 9987 and 9988 built by the Transit Development Co., yet another BRT subsidiary. At this time, #9980 was converted to an ash dump car. Ironically, this car would be the only one to survive through to the modern era of operations and saw use right up through the 1960's.

   A Whiting crane was installed on #9004 and a new under frame installed on #9133. (dupe on equipment page.)

   In compliance with a Public Service Commission order, geared hand brakes were installed on 37 South Brooklyn Railway cars; and the 3000 series equipment was renumbered into the 9000 series to fit in with the existing numbering scheme on BRT equipment. 

   All was going well for the South Brooklyn Railway, freight traffic was booming, the subways and elevateds getting built. But the first half of 1917 changed its prospects.

   From a Brooklyn Rapid Transit Annual Report, June 30, 1917, (via Eric's book):

   During the latter part of the fiscal year the US Government requisitioned for war purposes, the valuable waterfront property on New York Bay at 63rd Street and the connecting rights-of-way and tracks between 2nd and 4th Avenues, all belonging to New York Consolidated Railroad Company.

   The taking of this property not only deprives the system of valuable waterfront and storage yard facilities (now almost impossible to get) but takes away direct railroad connection with the waterfront, upon which not only do the companies of our system depend on getting their materials but upon which a large part of Brooklyn is more or less dependent for freight shipments. No adequate substitution can be provided therefore.

   We offered the government the joint use of this property during the period of the war but this would not suit the Government's purpose and permanent possession thereof has been taken.

   It is to be presumed that ample compensation will be paid. In the meantime the Government has undertaken on lands elsewhere provided by the system to furnish some substitute facilities for storage purposes."

   This was a major set back for the South Brooklyn Railway; as well as motor trucks were making inroads (pun intended) for freight delivery and started whittling into the South Brooklyn Railway's business. 

   Back in 2009, I acquired a copy of the "Brooklyn Rapid Transit - Track Mileage Book" originally dated January 1, 1910; which reflects that the South Brooklyn Railway (freight) would have operated over the following passenger "routes". 

   Reference to these several different "routes" led me to understand these routes were originally operated by several different "owners", which was quite confusing.

   While I hope the following compilation is accurate there is a small possibility of error. Please note the locations given are passenger stops / stations. Corrections are welcome.

   


Route Segment - Mileage List


owner route from to distance from
39th Street
Ferry Terminal
Property of the City of NY . Ferry Terminal connection of South Brooklyn Railway 0.094
South Brooklyn Railway Co. (Private Right of Way) connection of South Brooklyn Railway Second Ave & 39th Street 0.264
Brooklyn City RR 39th St Ferry - Coney Island Second Avenue & 39th Street Third Avenue & 39th Street 0.302
Brooklyn City RR 39th St Ferry - Coney Island Third Avenue & 39th Street Fifth Avenue & 39th Street 0.746
Nassau City Electric RR Culver Fifth Avenue & 39th Street old city line 1.184
Sea Beach Railway Co. Culver old city line Ninth Ave connection to Culver Line 1.370
Prospect Park & Coney Island Railroad Culver Ninth Avenue connection to Culver Line Fort Hamilton Parkway 1.640
"           " "     "     "       " "       " "          " "       " Fort Hamilton Parkway Thirteenth Avenue 1.908
"           " "     "     "       " "       " "          " "       " Thirteenth Avenue Kensington Junction 2.472
"           " "     "     "       " "       " "          " "       " Kensington Junction Eighteenth Avenue 2.840
"           " "     "     "       " "       " "          " "       " Eighteenth Avenue Parkville 3.085
"           " "     "     "       " "       " "          " "       " Parkville Twenty-Second Ave 3.517
"           " "     "     "       " "       " "          " "       " Twenty-Second Avenue Woodlawn (Avenue N) 4.005
"           " "     "     "       " "       " "          " "       " Woodlawn (Avenue N) Avenue P 4.357
"           " "     "     "       " "       " "          " "       " Avenue P Kings Highway 4.683
"           " "     "     "       " "       " "          " "       " Kings Highway Gravesend Race Track* 4.965
"           " "     "     "       " "       " "          " "       " Gravesend Race Track* Gravesend (Avenue U?) 5.308
"           " "     "     "       " "       " "          " "       " Gravesend Avenue W 5.490
"           " "     "     "       " "       " "          " "       " Avenue W Van Sicklen 6.295
"           " "     "     "       " "       " "          " "       " Van Sicklen Culver Terminal 6.723

* = also known as the Brooklyn Jockey Club 

.

.

The not so roaring Twenties

.

   By 1920, a lot of the subway projects were completed or nearing completion in Brooklyn, and this too was a mounting loss for the South Brooklyn Railway.

   The Culver Line, which had been constructed over the South Brooklyn Railway's right-of-way on 37th Street, descended into the the tunnel at the east end of the Ninth Avenue Station, thereby blocking the main line of the South Brooklyn Railway, forcing it to realign the main line adjacent to the Culver tracks . This required the purchase of land, yet another expense.

   Despite this fall off in business, the South Brooklyn Railway carloading was down, but not out; and was still profitable according to their September - October 1919 report; which showed an average of 60-75 carloads over the line daily. In 1920, the Flatbush Industrial Building was built, and the siding connecting to the South Brooklyn Railway tracks on their 37trh Street right-of-way.

   In 1921, an agreement was entered with the New York Consolidated RR<permitted  the running of freight through the Fourth Avenue, Sea Beach and West End Lines and in reciprocation, the NYCRR could use South Brooklyn Railway locomotives when required.

   But it was beginning at this times, that freight sidings along the trolley lines were decreasing with the industries opting to build or relocate on the main freight line. 

   In 1922, the Prospect Park & Coney Island RR< the New York and Coney Island RR and the Prospect Park and South Brooklyn RR were merged into the South Brooklyn Railway, when South Brooklyn Railway purchased the majority of the stock for those companies. 

The players may change but the game remains the same.

.

   1923 saw Brooklyn Rapid Transit file for bankruptcy; and it would be reorganized into the Brooklyn Manhattan Transit Corporation (BMT), which in effect became parent organization to the South Brooklyn Railway, as the BRT had been; and all Interstate Commerce Commission regulations remained as before.

   In 1926 the New York Rapid Transit Corp. (a subsidiary of Brooklyn Manhattan Transit) wanted the South Brooklyn Railway to cease operating in the Fourth Avenue Subway and on the Sea Beach Line. The South Brooklyn Railway only had four customers remaining on the Sea Beach: J. M. Huber, at Sixth Avenue; Rubel Coal & Ice and Granitface at Seventeenth Avenue; and the Brooklyn Boro Gas Company adjacent to the Coney Island Yard (with their well recognized and remembered "Gas Heats Best" gas holder.) The NYRT was not successful in this endeavor; however, but the die was cast as the trolley (and now rapid transit line) freight delivery network was coming to and end.

   1927 saw the South Brooklyn Railway construct a new freight house at Sheepshead Bay Road (where!?!!)

   On September 27, 1929, a twist of fate occurred that was beneficial to the South Brooklyn Railway: New York Rapid Transit (which had attempted to evict the South Brooklyn Railway from operating on their Sea Beach and Fourth Avenue subway lines three years prior); now needed space to lease for a bus storage yard for their Brooklyn Bus Corp. (yet another BMT subsidiary.) The South Brooklyn Railway property at 38th Street Yard (between Second and Third Avenues) was the site chosen. Two miles of yard track and sidings were removed and the site macadamized for vehicles. This location would be used for buses until 1952; when the land was once again repurposed for industry, and in 1959 Davidson Pipe would take up residence here.) 

   To give the reader a better (and visual) understanding of the vast network the trolley network that existed in Brooklyn (like in other boroughs); this map by the Electric Railroaders Association should help.  The BHRR freight department and the South Brooklyn Railway could send a freight box motor or trolley flat car over all of the tracks shown (as long as it was in service!)


City of New York Ownership - 1940

.

   All the private transit operators were now operating in the red - by a little or a lot; it made no difference. The City of New York had formed their own transit entity in 1932 - "the IND".  The IND was intended to be fully owned and operated by the municipal government, in contrast to the privately operated or jointly funded Interborough Rapid Transit Company "the IRT" and Brooklyn–Manhattan Transit Corporation "the BMT" companies.

   And so, in May 1940, the South Brooklyn Railway became part of the City of New York Board of Transportation "BoT", which consolidated( also known as "the First Unification") all the individual privately owned transit companies (the IRT & BMT) and street car lines in the New York City proper under one municipal government organization: the Board of Transportation. 

   In practice, these three operations remained somewhat independent of one another, whether due to equipment size, signaling, et al. But, the BoT entered into contract with the South Brooklyn Railway to provide labor, supplies and ultimately, equipment for freight delivery. 

   Railroad freight traffic, which had been tapering off with the advent and proliferation of motor trucks, figuratively exploded with the entrance of the United States in World War II. Wartime restrictions and rationing of gasoline and other petroleum products curtailed motor truck usage and the South Brooklyn Railway (which was electric powered) now found itself with plenty business.

   In 1946, World War II was over and the South Brooklyn Railway would purchase two surplussed ex-U.S. Army Whitcomb 65 ton diesel locomotives, #8 & #9 (first).

   In June 1953, the New York City Board of Transportation was reorganized and renamed the New York City Transit Authority (NYCTA). The purpose of this was to remove transit policy, and especially the setting of the transit fare, from City politics.

  On October 31, 1956; passenger service by streetcar along McDonald Avenue was discontinued, leaving that route to the exclusive use of the South Brooklyn Railway for freight movements (although it would have to share that thoroughfare with automobiles.)

    In 1960, two more diesel electric locomotives were purchased (#12 & 13) and a sad milestone in South Brooklyn Railway history occurred in December 27, 1961, when the overhead trolley wire was de-energized, effectively ending electric locomotive operations along the South Brooklyn Railway. 

   The switches at Kensington Junction were locked into the 37th Street position (some references state they were removed altogether) thereby isolating the branch up to the Ninth Avenue & 20th Street Depot & Car barn, which was no longer needed with the cessation of passenger streetcar operations. 

   Freight would continue to be transported along the South Brooklyn Railway to several merchants, but like the rest of the terminal railroads located in Brooklyn; freight traffic was dwindling due to the ever increasing use of the motor truck.

   In 1978 the street trackage east of Fort Hamilton Parkway, as well as that upon McDonald Avenue trackage was embargoed (placed out of service, but not sold or abandoned.) Abandonment would take place two years later. By 1980, there were only two non-Transit Authority customers: Davidson Pipe at Third Avenue, and Roberts Foods at 37th Street and Tenth Avenue.

   Portions of the McDonald Avenue line were paved over around 1991. The 37th Street right of way was parceled out and rezoned residential - with many two or three storey townhouses constructed upon it.

   In 1994, the last non-NYCTA customer, Davidson Pipe closed their yard bound by Second and Third Avenues and 39th and 37th Streets. The South Brooklyn Railway would continue to partake somewhat of the Bush Terminal Interchange to intermittently utilize the Long Island Rail Road's Bay Ridge Division.

   During this period was the South Brooklyn Railway's slowest. It had not hauled new or rebuilt inbound subway cars since 1992 with the delivery of rebuilt R44's; or outbound obsolete subway cars for scrapping or rebuilding since circa 2004.

   It did however place obsolete subway cars in the Second Avenue and 39th Street Yard for asbestos removal as late as 2007. But these cars were not interchanged with New York Cross Harbor / New York New Jersey Rail or shuttled to & from the float bridge at Bush Terminal or LIRR Bay Ridge Branch.

   Its resurgence, if it can be called that; began in May and throughout June 2012, where the South Brooklyn Railway saw haulage of new equipment for the NYCTA: the delivery of twenty-eight R156 diesel-electric work locomotives. Delivery took place upon the completion of the reconstruction of street trackage along First Avenue to the new South Brooklyn Marine Terminal at 39th Street, which included a new interchange with New York New Jersey Rail, the successor to Bush Terminal railroad, New York Dock Railway, and the New York Cross Harbor Railroad. At this point, in was only the South Brooklyn Railway right of way that was seeing action - the two locomotives in South Brooklyn Railway livery were assigned to other parts of the subway system. 

   In June 2019, new R252 contract flatcars began arriving via tractor trailer, and offloaded at the SBK / NYNJ Rail interchange.

   During 2025 through 2026, the MTA Railcar Testing and Acceptance Facility was built and completed upon the former SBK 38th Street "Unloading Yard" (between Third and Fourth Avenues) and where the subway new and rebuilt subway cars were unloaded from their flatcars.

   The South Brooklyn Railway Corporation remains in operation as a freight subsidiary to the New York City Transit Authority and a property holder, but it no longer rosters any equipment.

   Any updates regarding this will appear in the Current & Future Operations chapter below.

   The schematic seen above shows the original route of the South Brooklyn Railway (in blue) and the connections and interchanges to the BMT Subway (light gray), Bush Terminal (red); Fleet Supply Base of the US Navy (dark gray), Brooklyn Army Terminal (in green) and the NYNH&H / LIRR Bay Ridge Division (shown in brown).

   Please keep in mind, is it not to scale and is a composite of the various railroads and industries that operated throughout the Twentieth Century, even though some of the businesses may not have existed all at the same time.


.

.

RETURN TO INDEX

.


An In Depth Look into South Brooklyn Railway Delivery Network

#9444 - "freight box motor" - 1928 

#9137 - "trolley derrick gondola" - Tenth Ave Yard - 1959


   Freight business under the auspices of the South Brooklyn Railway began in April 1896 when the South Brooklyn entered into contract with the National Express Company to carry freight in seven express trolley cars. In May, National Express Co. leased a store at the corner of Jamaica Union Hall Street (approximately near the present 160th Street) and utilized it as a baggage office. Actual service commenced on June 10, with four round trips daily.

   One more express trolley would enter service four months later. Sidings were installed at six locations:

   This service would continue for almost three decades, ending December 31, 1928.

   Because of the complexity of passenger service and the proposed freight service, the Brooklyn Rapid Transit decided to form a freight department. Wisely, the company proceeded along these lines methodically and slowly. Furthermore, the haulage of the construction material for both their own lines and the new ones being constructed saw a rapid increase in freight traffic. At the beginning, the BRT forces performed their own work, but as the scope of the construction and reconstruction became obvious, the BRT hired private contractors to assist.

   Meanwhile word got out and the demand for freight service kept increasing. Elaborate plans for handling freight cars were set on paper by ex-Governor Flower, Richard Croker and John F. Carroll who conceived the idea of hauling the ashes on the surface lines. 

   Prominent Realtors McNulty & Fitzgerald were expecting to reclaim much of the marsh land in Coney Island Creek area and sell for suitable residential building lots

   In 1897, the Long Island Railroad, (which had been operating passenger trains from their own ferry terminal at 65th Street via the Bay Ridge Branch and connecting with the Prospect Park & Coney Island RR at Parkville Junction), now leased the South Brooklyn Railway & Terminal Company, (and LIRR eliminated their Bay Ridge Branch to Parkville Junction passenger train).

   Quick side bar here: in 1893, Andrew Culver sold his Prospect Park & Coney Island RR (which ran along Gravesend Avenue) to the Long Island Rail Road.

   The Long Island Railroad operated the South Brooklyn Railway & Terminal Company using steam powered locomotives (former elevated locomotives of 0-4-2T and 0-4-4T wheel arrangements) from June 1897 and until June 1903.

.


Trolley / Streetcar Delivery System
.
. 
   It is most important to remember that the South Brooklyn Railway, unlike any other of the freight terminal railroads throughout Brooklyn, that its delivery system was based upon the vast network of passenger streetcar trackage laced throughout the borough. It did not haul freight along a fixed route from Point A to Point B until much later in its existence.
 
   When the South Brooklyn Railway was first created it handled the freight delivery for most of, if not all the passenger carrying streetcar lines throughout Brooklyn. There were untold customers and countless sidings and spurs off the streetcar routes that snaked their way through Brooklyn. This early history must not be forgotten despite it being slowly erased from our collective memories.

   When presently discussed all that seems to be remembered about the South Brooklyn Railway is that it hauled subway cars for the NYCTA from Bush Interchange to the Coney Island Shops. It has become too easy to think in simplistic terms of the fixed route service discussed at length below and I, more than anyone; am guilty of this. The South Brooklyn Railway was so much more than that. Hence the creation of this chapter.

Carload and Less-Than-Carload

   It also must be understood, that there were two varieties of freight being handled by the South Brooklyn Railway: carload and less-than-carload. Carload freight is comprised of an entire railroad freight car being loaded for a single customer. 

   It could be a box car of metal castings for an assembly firm, sacks of hops or barley for a brewery, flatcars of granite to be cut for curbstones or to be carved into headstones, gondolas of steel pipe or hoppers of coal for a coal dealer to resell or to heat or power a electrical generating station for a large industry. 

   On the South Brooklyn Railway, a good deal of the carload freight at this time was for contractors that were helping expanding the city: Cranford Asphalt, owned their own fleet of cars and transported sand from the sand pit at Avenue R on the Brighton Line to their storage yard which was located between Park Place and St. Marks Avenue on the present day Franklin Avenue shuttle line. 

   Granite for curbstones, as well as headstones for the cemeteries.

   Originating at locations throughout Brooklyn would be the trolley gondolas carrying ash from coal stoves used in home and business heating as well as the manufactured good originating in Brooklyn for outbound transfer.

 
    The other kind of freight haulage is less-than-carload. 

   In most cases, this would be a boxcar loaded with many different items or materials from different consignors for different customers. Almost always, Less than Carload meant a box car, but it could also mean different loads in a gondola (one batch of pipe to here, another to the there); or on a flat car (one piece of machinery to one destination, another to another.)  Later in the era of multiple bay covered hoppers used in dry bulk shipping, less than carload could be applied here as well.

   Very rarely was less than carload in a tank car or an open hopper where it was difficult to measure out the commodity being removed from the "whole" load.

   By itself, in less than carload shipping; that partial load would have been a waste of space in assigning an entire boxcar to deliver just a single customers few crates and would have been cost prohibitive. When many small loads shared one boxcar and thereby sharing the expense of shipping, it cut the cost of shipping. But, these less than carload shipments were the most labor intensive. It is with these types of deliveries, that the final delivery agent (in this case the South Brooklyn Railway) needed a large roster of freight cars for its network of customers.

   It was the less-than-carloads that usually were transferred to the "freight box motor" or similar equipment. Freight box motors were really nothing more than a powered boxcar with a platform on both ends (sometimes one) for the motorman to operate from. Basically it was the next step in the evolution from horse-drawn wagon delivery in urban environments with a network of trolley tracks. Whether small towns or large cities, most trolley companies had at least one trolley motor for smal deliveries.

   Beginning in 1904, following Irving T. Bush's business advice, the Brooklyn Heights Railroad began installing freight sidings upon request. The first of these sidings was to the Iron Clad Manufacturing Co (manufacturer of steel kegs and drums) located at Flushing Avenue and Cook Street, in the Bushwick neighborhood. 

   It is also at this juncture in time, that the small steam locomotives the South Brooklyn Railway had acquired and were operating were turning out not to be powerful enough to handle this increase in freight traffic. These locomotives were surplussed from elevated passenger lines that had been converted to electricity as a source of power and propulsion. 

   Therefore, the Brooklyn Rapid Transit designed and constructed their own electric box cab locomotive in their 39th Street shops; which was delivered in 1907 and given the number 4. 600 horsepower through 8 wheels (B-B wheel arrangement) on 57 tons, with smooth efficient electric propulsion; it was the largest electric locomotive built by a municipal railroad at that time. This would also be the very locomotive actually lettered "South Brooklyn Railway." (and it survives to this day at the Shore Line trolley museum in East Haven, CT)

   A good deal of the carload freight at this time was for contractors that were helping expanding the city: Cranford Asphalt, owned their own fleet of cars and transported sand from the sand pit at Avenue R on the Brighton Line to their storage yard which was located between Park Place and St. Marks Avenue on the present day Franklin Avenue shuttle line. 

   Granite for curbstones, as well as headstones for the cemeterys.

   Beginning in 1904, following Irving T. Bush's business advice, the Brooklyn Heights Railroad began installing freight sidings upon request. The first of these sidings was to the Iron Clad Manufacturing Co (manufacturer of steel kegs and drums) located at Flushing Avenue and Cook Street, in the Bushwick neighborhood.

   As such, the South Brooklyn Railway had dozens of these trolley box motors and trolley gondolas to serve the needs of its customers. They would pretty much fan out throughout Brooklyn on a daily basis to hundreds of different customers and return to the freight stations for more deliveries arriving throughout the day. The best I can compare it to in modern times, is think of it as a primitive UPS distribution system, but instead of brown trucks, it was brown (or dark red or olive green) trolleys!

   Another factor to be considered was that the standard size freight cars in use by the transcontinental railroads at that time were too large in dimension for easy transport through narrow city streets (yet tiny in comparison to the freight cars of today!) So the less-than-carloads were transferred to smaller trolley sized equipment such as those shown below.

   And of course, the South Brooklyn Railway worked for the growing rapid transit system - the subways and elevateds; by hauling tunnel excavation debris and delivering the various materials needed for the building of tunnels, stations and the elevateds. 

   It should be remembered that the subways and elevateds were considered "rapid transit" because the train could go blocks without stopping, covering more distance in less time than opposed to the "surface transit" of which the trolleys and streetcars pretty much stopped on every street corner much like the present bus routes. The rapid transit and surface transit systems thought of as separate operations in those days.

   On August 31, 1902, the Brooklyn Rapid Transit Company acquired full control of the South Brooklyn Railway for $500,000 by buying in all stock except for directors shares; and the South Brooklyn became another subsidiary of the Brooklyn Heights Railroad. 

   Things really got going with when contracts were let for the construction of 52 freight car bodies as the cost of $31,886. This shall include:

   12 additional flat cars for freight service were built in the company shops at approximately $6,000, and a portion of this equipment would reuse motors and trucks and electrical systems from obsolete passenger equipment.

 On July 30, 1903, the American Railway Traffic Company was incorporated in Jersey City, NJ. This company was created with the purpose of hauling the ash, rubbish and street sweepings (read: horse droppings) collected in the Borough of Brooklyn. This operation was small in scale due to the fact that ARTCo was not incorporated in the state of New York and had not yet acquired the rail cars for widespread service. This would be remedied in 1904, and twenty-eight gondolas were ordered.  

   Also taking place in 1903, was the construction of a railyard (equipped with overhead trolley wire), which was located adjacent to the 39th Street Ferry Terminal. 

This yard was so situated that it allowed the transfer of freight from the Bush Terminal Railroad. In 1905, the South Brooklyn Railway purchased three locomotives along with 40 additional freight cars to handle the increase in freight traffic.

   This freight traffic arriving at Bush Terminal for interchange with South Brooklyn, was divided into two groups: "trolley freight" and "steam freight". While not specifically stated in the Linder / Eppler article, it can be assumed that steam freight referred to carload and trolley freight was less than carload. This assumption is reached as trolley freight would have had to have been transferred from a standard "steam" railroad car to the SBK / BHRR trolley car for final delivery, and as it would not make any sense to transfer freight from one steam railroad car to yet another when that first steam railroad car could simply be interchanged and hauled to destination in the first place.

   Steam freight was interchanged at the yard west of Second Avenue between 40th and 41st Streets operated by Bush Terminal which accessed the yard from the west under a large coal trestle. At that time there were no tracks on 41st Street. These cars would be hauled along Second Avenue to the 38th Street Yard west of Second Avenue where they would be coupled to South Brooklyn Railway locomotives. The Bush Terminal Railroad performed this service under contract from the Brooklyn Heights Railroad as well as maintained the yard and provided office space for the BHRR representative.

   Trolley freight was interchanged from Second Avenue. Freight was transferred from steam railroad cars and less than carload freight was transferred from the freight house to South Brooklyn Railway cars. 

   This transfer and interchange service all changed around 1906, when Bush Terminal began a massive expansion and construction of its lofts and warehouses. The 40th Street freight yard was demolished and a new South Brooklyn Railway / Bush Terminal Railroad interchange yard and freight house was built at 48th Street and Second Avenue.

   The South Brooklyn Railway and Long Island Rail Road were unable to to agree on rent for the LIRR Coney Island Freight House. South Brooklyn Railway needed the use of the freight house for less than carload traffic but the profit would have been less than the $1000 annual rent LIRR was demanding. This led to the BHRR constructing it's own freight house located on West 8th Street, near the Police Station.

   South Brooklyn Railway began hauling the freight with several small locomotives no longer needed after the electrification of the elevated lines. These locomotives soon proved not to be powerful enough, and BRT designed locomotive #4 and built it.

   Also during this period freight traffic steadily increased. Throughout the next few years, the South Brooklyn Railway entered into many agreements to haul the freight for the occupying passenger hauling company lines throughout Brooklyn, i.e.: Transit Development, Brooklyn, Queens County & Suburban, Nassau Electric, Brooklyn Union Elevated, Prospect Park & Coney Island, Sea Beach Railway, New York & Coney Island Railway, Coney Island & Brooklyn Railroad, among others. 

 

Public Service Commission Report - 1909


   As freight traffic materialized, more sidings would be added. Circa 1907, a siding was installed at Unionville (Ulmer Park) on the old Brooklyn, Bath & West End RR; for the Cropsey & Mitchel Lumberyard and several coal yards. These two businesses had been receiving their freight from boats tied up to the piers in the neighborhood, but they had to unload and pick it up for themselves.. The South Brooklyn Railway offered "to-their-door" delivery. 

   By 1910, a second public delivery point was established in the area, this one located at Bay 19th and Bath Avenue, which had been the Bath Beach Depot of the American Express Company. 

   Also in 1910, not three years after taking delivery of box cab locomotive #4; steeple cab locomotive #5 had been ordered from and built by General Electric Company located Schenectady, New York; and delivered to South Brooklyn Railway. This locomotive was designed with slightly different gearing than the box cab so as to ascend the steep grade near the waterfront as well as operate at high speeds on lengthy runs. 

   The South Brooklyn Railway instituted regular local freight service for the transport of sand, cement, crushed stone, paving blocks (setts not cobblestones) and other commodities of the building and construction trades from their docks at 63rd Street and from their dock at the foot of Stagg Street on the English Kills branch of the Newtown Creek. 

   Material and spoils excavated from the Crown Heights section was brought to the marshlands between Coney Island and Brighton Beach. When the Interborough Rapid Transit began excavating their tunnels at Joralemon Street, tunnel spoils were brought to the surface through elevator shafts (like those found at mines), dumped into gondola trolleys, and brought to the same dump sites in Brighton Beach and Coney Island, as well as Dyker Heights which was now being developed as well. Basically, in the development of Brooklyn which was not as flat as it is now, this was the era of digging dirt from hills and transporting it to fill valleys and tidal lands; all in the pursuit of making Brooklyn the finest city!

   Even ashes and cinders from the coal fired electrical generating stations of the Brooklyn Rapid Transit were hauled over the South Brooklyn Railway.

   In 1915, with the beginning of construction of the Brooklyn Rapid Transit's Culver Line which was being constructed either directly next to or over South Brooklyn Railways right of way adjacent to 37th Street, required a a tunnel east of Ninth Street Station. This effectively blocked the South Brooklyn Railway's main line. So, the South Brooklyn Railway commenced in purchasing land on the north side of ongoing construction and rerouted their right of way. 

   In 1916, the Transit Development Company (another BRT subsidiary) built four rail cars: 9978-9979 and 9987-9988 for the South Brooklyn Railway. At about the same time, a motor was installed on ash car 9980, which allowed the ash bins to be dumped mechanically. Other improvements to rolling stock this year were a Whiting crane was installed on Derrick Car 9004 and a new under frame built for 9133. In compliance with Public Service Commission orders, geared hand brakes were installed on 37 other cars on the roster.

   While not related to freight operation, it is worth noting that in 1918, all elevated cars were fitted with trolley poles in addition to third rail contact shoes when the United States Army announced their intention to use the dock at Norton's Point, located at the west end of SBK's Norton Point Line. The BRT substituted Brooklyn Heights Railroad "El" cars for trolley cars on May 25, 1918. The dock was never used, and the US Army altered their plans, and passenger traffic did not increase. Therefore, trolley cars returned October 1919. In fact, passenger traffic became so light, that South Brooklyn Railway purchased six single truck "Birney" cars from Cincinnati Car Company, numbered 7200 through 7205. 

   Freight traffic started falling off following the conclusion of World War I, but the routes were still busy. In the internal BRT monthly magazine published September / October 1919; the South Brooklyn Railway was averaging 60 to 75 carloads daily. 

   In 1918, with the near completion of most of the subway construction projects, the South Brooklyn Railway was becoming burdened with a surplus of equipment. Locomotives #6 (first) and #7 (first) were sold to New York Consolidated Railroad, yet another(!) subsidiary of the Brooklyn Rapid Transit, this one being their rapid transit subsidiary. Numbers 6 and 7 were sold for $34,000 and twenty-six air dump cars: #9940-9959 and 9964-9973 were sold for $22,000; netting a profit of $1,000. 

   In 1920, plow motors 9802, 9803 and 9805 were sold to the Brooklyn Development Company for $19,319.76 and Locomotive #3 sold to New York Consolidated for $6065.85. Fifteen dump cars were scrapped. Also in 1920, Kensington Tower and the Parkville Passenger Station (built 1885) were removed.

   Freight was also allowed to be transported through the new subway tunnels of Fourth Avenue Line, between the hours of 1:00 am and 5:00 am; and also from the Culver Line to the Sea Beach Line. On January 18, 1921, and agreement was made with the New York Consolidated RR permitting operation of of freight cars on portions of the Fourth Avenue, Sea Beach & West End Lines. A reciprocal agreement was made concerning their use of the electric cars and freight locomotives.  All this freight was usually carried at night, and without interference to the commuter. 

   Despite being a Sunday, that day of the week saw significant freight traffic. Ten cars were required for the Sunday issues of the areas newspapers, three alone for the Brooklyn Daily Eagle. 

Transit Commission Annual Report - 1921

   In 1926, the New York Rapid Transit Corporation, the Brooklyn Manhattan Transit subsidiary requested that South Brooklyn Railway cease operating freight trains in the Fourth Avenue Subway and on the Sea Beach Line. Even though the South Brooklyn Railway only had four customers remaining on the Sea Beach Line (J. M. Huber, Rubel Coal & Ice, Granitface and Brooklyn Borough Gas); the NYRT was not successful in their action and freight service along that route continued for several more years.

   Commencing in 1929, and following the merger of the various BMT trolley subsidiaries into the formation of the Brooklyn & Queens Transit Corporation; the South Brooklyn agreed to pay the B&QT ten cents per mile for freight cars operated on its streetcar lines.

   By 1930, South Brooklyn Railway instituted their motor truck store-door delivery service from "Paramount Station"..

   In 1935, South Brooklyn Railway agreed to pay New York Rapid Transit Corporation 30 cent per mile for freight cars operating on their tracks.

   On June 1, 1940, the City of New York assumed operation of all surface and rapid transit lines throughout the Boroughs of Brooklyn and Queens. The previous day, the South Brooklyn Railway entered into contract with the newly formed Board of Transportation of the City of New York, whereas the BoT agreed to control and operate the South Brooklyn Railway and furnish the labor, employees, material, and supplies required for maintenance and operation. This contract allowed the South Brooklyn Railway to share the use of the various BoT clerical and operating departments and provided that employees required by the South Brooklyn operation be assigned by the BoT.

   A survey held in 1953 revealed the Granitface siding at 17th Avenue was no longer used and the Huber siding was unused since June 1949. Following this, the trackage rights as agreed to in 1934 of the South Brooklyn Railway on the Sea Beach Line were amended. It was now amended to only include the portion between the north end of the 86th Street Station and the old junction junction of the Sea Beach Line at Avenue Y.

   On August 26, 1954 the overhead wire on the property of the Brooklyn Borough Gas Company siding was removed.

.

Coverdale & Colpitts Report of 1953

   In a copy of the "Report To New York City Transit Authority on Recommended and Potential Economies and other matters related to the Authority's Transportation System", conducted by Day & Zimmerman / Coverdale & Colpitts; that I acquired off eBay; there is very little relating to the South Brooklyn Railway. On page 16 was the following:

   Three recommendations were made in the 1951 report with respect to the South Brooklyn Railway Company:
1)  Savings due to the substitution of electric motor power for the two present diesel locomotives.
2)  Lowering the tracks in the Fourth to Ninth Avenue rapid transit tunnel sufficiently to accommodate the standard AAR 40 foot 6 inch box cars.
3)  Discontinuance of the J. M. Huber Inc private sidetrack at Sixth Avenue and 63rd Street.

   Only item (3) has been put into effect. As the amount of economies involved in items (1) and (2) were small and each would involve a substantial capital expenditure, we do not recommend that these items be aggressively followed at this time.

   

.

.

RETURN TO INDEX

.



Customers, Yards, Sidings & Freight Station Locations


South Brooklyn Railway Main Freight House - Second Avenue between 38th and 39th Streets - ca. 1899
Looking east-southeast, Third Avenue Line trolley is entering upon trackage and private right of way to the 39th Street Ferry House two blocks behind photographer.


   Up until 1904, the Long Island Rail Road, Brooklyn Heights Railroad and several other subsidiaries (the South Brooklyn Railway being one of many) of Brooklyn Rapid Transit (the main holding company) handled the freight traffic throughout Brooklyn. 

   On April 16, 1905, South Brooklyn Railway took over freight handling from Long Island Rail Road.

   Also, this year is doubly significant for it is the year the South Brooklyn Railway entered into direct agreement with Bush Terminal Railroad to forward freight from the Class 1 mainland railroads yards in New Jersey through Bush Terminal via carfloats. 

   Without this agreement, the South Brooklyn Railway most certainly would not have enjoyed the cost savings and convenience of someone else doing the carfloating, and doubtfully would have been so successful.

   In 1907, newly enacted legislation by the Interstate Commerce Commission resulted in the South Brooklyn Railway being split off from the Brooklyn Rapid Transit Company, and of which would now operate the South Brooklyn Railway under its own name as a completely separate company. 

   This required a slew of trackage rights and terminal agreements being canceled by the original subsidiaries and new contracts issued by the South Brooklyn Railway.  

   Had this not been done, the entire Brooklyn Rapid Transit system (almost entirely a passenger hauling company) would been made subject to Interstate Commerce Commission regulations.

   Upon the formation of the South Brooklyn Railway (as will be discussed in The Old Era chapter above), there were dozens if not hundreds of small customers that received freight via the streetcar delivery network. 

   Unfortunately, quite a few of those names have been lost to history until a receipt or a document makes itself available, at which time it will be added to the list below. 

   At right: advertisement from the Official Railway Guide - June 1911

   
   One must bear in mind, that the early operations of the South Brooklyn Railway saw both freight service via trolley motor throughout the entire Brooklyn network of trolley lines; as well as fixed route service during its later years.

   The South Brooklyn Railway had several yards throughout its fixed route:

.

   What I do know is that the South Brooklyn Railway had published freight stations at the following locations (some of which have been discussed at length, others very little is known). The August 27, 1915 - Volume 9, No. 9 issue of Railway Age Gazette (a railroad trade journal) lists the following locations as freight stations for the South Brooklyn Railway:

.

   While researching various other documents (i.e.: Documents of the Senate of the State of New York - 1917, the Joint Report with Comprehensive Plan and Recommendations, Volume 1, Part 4 -1920 as well as numerous others), I have come to learn that the following locations also came to be freight or delivery stations for the South Brooklyn Railway. 

.

   It should also be recognized, that images exist of direct freight car to truck transloading taking place on several sidings along the route.

   Some of the information for actual customers comes from the ten part Bernard Linder / Paul Eppler series of articles on the South Brooklyn Railway as published in the Electric Railroaders Association bi-monthly magazine: "Bulletin". Benjamin W. Schaeffer fortunately has the complete set in his personal library. Furthermore, with the kind generosity and courtesy of Jeff Erlitz, present editor in chief of the ERA Bulletin, I have secured permission to republish the articles on this website. 

   From this series and from official filings, lawsuits, announcements, magazine articles, property map notations as well as recollections and information from the various transit buffs of the South Brooklyn Railway for both old and new era of operations, I have been able to compile the list below. As I learn more, they too will be added to the list below. 



Pier Stations


   The above list is not all the South Brooklyn Railway hauled. Surprisingly, it was learned that the South Brooklyn Railway also operated from two piers located at:



   These piers were used for the receipt of various types of bulk aggregate, sand, stone and other construction materials via scow and barge. They were unloaded directly from barge or scow at these locations and distributed to customers via trolley gondola on the streetcar network.  

.
.
.


Ash & Cinder Collection


   The South Brooklyn Railway collected cinders and ash from factories as well as its own power generating station at Kent Avenue & Division Street. It also hauled ash from residential homes. This ash along with rubbish collection and street sweepings was hauled to landfills and used for filling in of marsh and tidal wetlands in the development of Brooklyn.

   In 1904, the American Railway Traffic Company (another subsidiary of Brooklyn Rapid Transit) ordered twenty-eight rail gondolas at $350 each from the South Baltimore Steel & Foundry. The method of handling was unusual to say the least. Because the public and the City of Brooklyn objected to the open hauling of this ash and refuse; the South Brooklyn Railway ordered 250 steel bins or "tanks" at $129 per unit from the Ritter Conley Manufacturing Co. The bins were 8 feet by 8 feet by 10 foot tall. They had extensions or handles on two of the sides so that they can be lifted by crane and emptied by turning upside down. (As no images have yet to surface, the authors are left to wonder if these bins are similar to todays trash dumpsters picked up and dumped by the trucks with forks.)

   Each gondola car could accommodate 4 bins. The company expected to build 13 two story collection buildings throughout Brooklyn. Horse drawn refuse collection would enter the building, the cart hoisted up and dumped into the gondola bin. This operation would be scheduled primarily at night during minimum trolley traffic times and the powerhouses would have reserve capacity.

   Ashes would also be dumped in the vicinity of the old Brighton Beach Race Track, (Neptune Avenue & Brighton Line) with the Brighton Beach Racing Association paying for the fill. After this was completed, ashes & rubbish were br
ought to Harway Meadows (between Ulmer Park and Coney Island Creek). Additionally, other dumping grounds was located at off a siding of the West End Line at 25th Avenue. and a landfills was located at 13th Avenue and 78th and 79th Streets and received 130,000 cubic yards for the Harway Improvement Company in 1907.

   The contract expired in 1908, and this ARTC venture was leased to South Brooklyn Railway in May 25, 1909, and dissolved altogether some time shortly in February 3, 1910.

   It should be stated that this
 ash / rubbish hauling service throughout Brooklyn was now undertaken by another company, "Borough Development" which made arrangements with the Long Island Rail Road to build ash receiving stations at various locations along the LIRR routes throughout Brooklyn & Queens. This company would be known as the Brooklyn Ash Removal Company, of which its detailed history can be read on another page of the website: Brooklyn Ash Removal Company. 

   The South Brooklyn received the equipment of the American Railway Traffic Company, specifically:



Liquid Tar / Asphaltum


    The gondolas would continue to see service but the steel bins were stored on the 63rd Street Pier and eventually repurposed for hauling liquid tar / asphaltum for the paving of city streets. This liquid tar was pumped from boats at the 63rd Street dock, into the tanks now placed upon on flat cars and brought to location to be siphoned off into horse drawn sprinkler wagons which wet down the the dirt roads of the time.
.

.

Newspaper Delivery

   
   Also uncovered from several old court filings and the Linder / Eppler article, was that the local New York City area newspapers chartered trolleys from the South Brooklyn Railway to haul their newspapers to various distribution points in Brooklyn. Sundays were especially busy with 10 cars chartered, three alone for Brooklyn Daily Eagle.

   Applications and appeals to the Public Service Commission by the South Brooklyn Railway sought to increase the tariff rate for the use of chartered trolleys handling the newspapers.

.

.


US Mail Delivery

   
   Beginning in 1894 (before the formation of, but continuing under South Brooklyn Railway after) was the transportation of the United States Mail. Six specifically designed trolleys cars would begin on a siding constructed in the rear of the Main Post Office located on Adams Street between Johnson & Tillary Street.

   These trolleys would service various outlying substations until the US Postal Department purchased their own motor trucks in 1914.

..

.

Subway Tunnel Excavations


   Yet another contract had the South Brooklyn hauling excavation material from subway tunnels under construction. Spoils were hoisted from the tunnels via vertical shafts located at: 
    The South Brooklyn Railway then hauled these spoils to dumps near:
.

.

"Paramount Station"

   One of the most unusual arrangements the South Brooklyn Railway engaged in, long before any other common carrier did offer such service, was their "Store to Door" delivery trucking.

   The South Brooklyn Railway entered into contract with Horstmann Trucking to furnish the trucks and drivers. If a consignee specified "Paramount Station" on their waybill, that freight was delivered to the main freight house at Third Avenue & 39th Street. Here the South Brooklyn Railway unloaded the freight from the Class 1 railroad freight car (brought in by Bush Terminal via carfloat) and placed it upon a motor truck for haulage to the final delivery location. The reverse held true for outgoing shipments.

Paramount Station Team Tracks / Horstmann Trucking
39th Street between First and Second and Third Avenues
(to become Davidson pipe)
images courtesy of the New York Transit Museum
(not to be reused or reproduced without consent)

added 03 June 2021



.

Customer List / Siding Location List

   The years served column is only an estimated time frame. Dates given are usually the date of the reference article, and actual dates of service could extend before or after the given date. This is by no means a complete list, but is quite comprehensive:

customer commodity location years served

Direct Freight Car Service (via steam and/or electric locomotive)
S. Abato Shell Road & Cobek Court 1928
Ansonia Clock clock  manufacturer 20th Street & Ninth Avenue
Armour Packaging distribution plant 38th Street & Third Avenue
Bay Ridge Coal coal & ice 37th Street & Fifteenth Avenue
Berkshire Structural Steel steel beams 37th Street & Fort Hamilton Parkway
38th Street & Tenth Avenue
ca. 1917 to ?
Brooklyn Borough Gas construction materials, valves, pipe
manufactured illuminating gas and gas storage
West 17th Street & Mermaid Avenue
Coney Island Creek
c1913-1960
Burns Brothers coal coal Dahill Road & Cortelyou Road (Kensington Junction)
Cirillo Brothers Ice & Coal ice & coal 37th Street & Thirteenth Avenue 1932
Cobco Flooring & Lumber 38th Street & Twelfth Avenue 1927
Cohn Cut Stone cut stone 38th Street & Fourteenth Avenue 1909
Cullen Fuel Coney Island 1926
Culver Lumber dimensional wood & building supplies  37th Street & Fifteenth Avenue c1930
Davidson Pipe steel pipe 38th Street & Third Avenue c1955 - 1994
Desbrock Coal & Company coal & ice 14th Avenue & 60th Street; relocated to
16th Avenue & 63rd Street (Sea Beach Line) 
ca. 1913
Five P Holding 38th Street & Twelfth Avenue 1927
Flatbush Coal coal Gravesend Avenue (McDonald Avenue) & Avenue S
(listed as Gravesend Avenue& Kings Highway)
1928-1978
Flatbush Industrial Building machinery (H. W. Cotton), manufacturing lofts 37th Street & Fourteenth Avenue  1920-1978?
Granitface (?)           cut granite  Seventeenth Avenue  1926-1953
Gravesend Racetrack & Brooklyn Jockey Club? hay & feed? Gravesend Avenue (McDonald Avenue) & Avenue U 1920's
Greenwood Cemetery cut stone for mausoleums, headstones 38th Street & Ninth Avenue
Philip Gruber 37th Street & Fourteen Avenue 1926
Harstan Chemical 38th Street & Twelfth Avenue 1919
J. M. Huber printing inks 63rd Street & Sixth Avenue (Sea Beach Line) 1912-1949
C & S Jacobs Plumbing Supply plumbing heating & steam fitting 37th Street & Twelfth Avenue 1927
Kings Highway Lumber (may have become Kingsway Lumber) dimensional wood & building supplies Gravesend Avenue & Cortelyou Road (Kensington Junction) ca. 1930
Knickerbocker Coal Ice & Fuel Oil heating fuels 38th Street & Twelfth Avenue 1927
Samuel Klein / Klein's Lumber dimensional wood & building supplies 37th Street & Thirteenth Avenue 1919 - c1930
Luzerne Coal coal 38th Street & Sixteenth Avenue 1930
Maltine Co. medical preparations 20th Street & Ninth Avenue
Massoit Corp 36th Street & Fourteenth Avenue 1920
New York City Transit Authority and predecessors 
(Brooklyn Rapid Transit)
subway cars and parts thereof; track components 36th / 38th Street Yard, Coney Island Shops 1899 - present
Nygaard Flooring 37th Street & Twelfth Avenue 1928
Peter Olson        37th Street & Fort Hamilton Parkway    1911
Phoenix Hermetic sheet metal, canning / packaging supplies, lithographic plates 37th Street & Fourteenth Avenue ca. 1916
S. Pizzutiello & Co 37th Street & Twelfth Avenue 1925
Prospect Coal coal 37th Street & Fort Hamilton Parkway
38th Street & Tenth Avenue
ca. 1917 to ?
Daniel M. Rader 37th Street & Fort Hamilton Parkway 1924
Roberts Holdings (Roberts Foods) pickles, mayonnaise, condiments 37th Street & Fort Hamilton Parkway
38th Street & Tenth Avenue
1919-1978
Rubel Ice & Coal ice Dahill Road & Cortelyou Road (Kensington Junction) 1922
Serlinsky & Kalish Neptune Avenue & Coney Island Creek 1926
Shell Road Coal coal Avenue Y & Shell Road 1921
Somers & Anderson coal, tin plate & stamping? Fort Hamilton Parkway & Culver Line ca. 1913
W. A. Case & Son    plumbers supplies    49th Street & Twentieth Avenue (Parkville Junction)     ca. 1907


Trolley Motor Freight Service

Advex adhesives, chemicals Montgomery Street & Franklin Avenue 1922 to 
American Ice ice 331 Park Avenue near Grand Avenue
American News newsprint, printing supplies Park Row (Manhattan end of Brooklyn Bridge
American Steel Barrel (Brooklyn Meurer Steel Barrel) steel containers, kegs & barrels Flushing Avenue & Nostrand Avenue ca. 1913
Amid Duron tallow, stiffening gums, rosin soaps,
soluble oils for textiles
Nostrand Avenue & Park Avenue 1912
Arabol Manufacturing adhesives, synthetic gum arabic Nostrand Avenue & Park Avenue 1904 - 1917
Atlantic, Gulf, and Pacific shipyard Kemble Avenue, Mill Basin, Brooklyn 1916, 1921
Barber Asphalt sand, liquid tar, asphaltum Varick Avenue & Metropolitan Avenue; Newtown Creek ca. 1913
Benisch Brothers Monumental Works cut stone, marble, granite from Maine 840 Jamaica Avenue & Lincoln Avenue 1911
Berglass Manufacturing 10 Fulton Street
Borough Asphalt sand, liquid tar, asphaltum Varick Avenue & Metropolitan Avenue ca. 1913
Borough of Brooklyn Highway Department liquid tar, asphaltum 63rd Street Dock
Brooklyn Daily Eagle newsprint & materials for same Adams Street & Johnson Street ca. 1913
Burton Dixie mattresses Franklin Avenue & Montgomery Street 1921
Cheek-Neal Coffee coffee roaster 39th Street & Third Avenue < 1921
Consumers Park Brewery malt, cereal for beer brewing Montgomery Street & Franklin Avenue (Brighton Line)
E. H. Cook Coal coal West 8th Street 1600' north of Sheepshead Bay Road 1905
Central Foundry Fulton Street & Tompkins Avenue ca. 1913
Continental Baking flour, yeast, grain public team track at power station 3rd Street & Third Avenue
Cranford Asphalt sand, liquid tar, asphaltum Avenue R and Brighton Line (East 16th Street)
Cranford Company tunnel excavation material
sand to Trolley Depots
9th Street & Gowanus Canal
temporary tunnel shafts at: Joralemon Street & Court Street
Fulton Street & Dekalb Avenue
Fourth Avenue & Atlantic Avenue
Crimmins Contracting broken stone, cement for new streets 63rd Street Dock
Cropsey & Mitchell lumber Cropsey Avenue & Bay 35th Street 1910
Cullen Fuel coal West 8th Street & Surf Avenue
Damast, Abraham & Murray 39th Street & Second Avenue 1921
Degnon Contracting street construction of Atlantic Avenue
between Fifth & Flatbush Aves
temporary siding on Atlantic Avenue
DeHass Simonson Realty land fill Broadway & Elmhurst Avenue
Frank Brewery malt, cereal for beer brewing Flatbush Avenue & Vernon Avenue (now Tilden Avenue)
Charles Froeb wine & liquor wholesaler Tompkins Avenue & Flushing Avenue 1912
Robert Gair Front Street & Adams Street ca. 1913
Granitface (?) cut granite Seventeenth Avenue 1926-1953
H. J. Heinz 1 canned goods Franklin Avenue & Bergen Street (former Nassau Brewery) < 1921
Hildebrandt Baking (predecessor to Continental Baking) flour, yeast, grain Third Avenue & 3rd Street (former ARTCo ash station)
Joshua Horricks wire fencing Herkimer Street near Reid Avenue - materials delivered to trolley loop
Otto Huber beer depot West 8th Street - beer trucked from brewery to Ridgewood Depot,
then South Brooklyn to Coney Island
Igoe Brothers iron & steel Flushing Avenue & Marcy Avenue - public yard
Iron Clad Manufacturing steel containers, kegs & barrels Flushing Avenue & Varet Street 1905
Knickerbocker Ice ice Flatbush Avenue & East 32nd Street
37th Street between Fourteenth & Fifteenth Avenues
1912, 1921
League Storage & Warehouse warehousing Third Avenue & (proposed) 2nd Street (exact location unknown) 1919
Lower Gambrinus Brewery malt, cereal for beer brewing trucked from brewery on West 42 Manhattan to Williamsburg Bridge Plaza
then via South Brooklyn to Coney Island
W. F. Mangels Coney Island 1921
Metropolitan Engineering electrical cabinets & cutout boxes Nostrand Avenue & Atlantic Avenue 1918
Michael Brewing beer & ice Bergen Street & Third Avenue 
Benjamin Myers Coney Island Yard 1921
Nassau Brewing malt, cereal for beer brewing Dean Street & Franklin Avenue / Dean Street & Bergen Street (under Brighton el) ca. 1913
National Lead lead Strickland Avenue & Mill Avenue
National Express Company parcels & freight 8-10 Fulton Street
Broadway & Myrtle Avenue
Bay 19th Street & Bath Avenue
16th Avenue & Ditmas Avenue
Railroad Avenue between Sea Beach Palace and West End Depot
25th Street & Third Avenue
East New York at Howard House
Jamaica Avenue & Union Hall Street (160th St)
North American Brewing malt, cereal for beer brewing used dead track in Ridgewood Car Barn
J. W. Oeleriches food packaging Sanford Street & Park Avenue 1912
Pathe Freres Phonograph Co. materials, goods for manufacturing and coal Grand Avenue & Park Avenue 1921
Piel Brothers malt, cereal for beer brewing Liberty Avenue & Georgia Avenue pre-1929
Robison Clay Products vitrified pipe Seventeenth Avenue & Sea Beach Line
Joshua Rogers & Son Pacific Street near Franklin Avenue ca. 1913
Thomas Roulston 1 grocer & dry goods 9th Street & Second Avenue
Saltser & Weinsier (formerly Iron Clad Mfg) plumbing supplies Flushing Avenue & Varet Street
Flushing Avenue & Bushwick Avenue
< 1921
Sholtz & Atkinson Realty land fill Thirteenth Avenue between 78th and 79th Streets
South Brooklyn News Sunday newspaper distribution Park Row
Sure Seal Pearl Street & Prospect Street 1912
Charles Tisch stove parts Rockwell Place between DeKalb Avenue & Fulton Street
Trommer's Evergreen Brewery malt, cereal for beer brewing Bushwick Avenue & Conway Street pre-1929
Uvalde Asphalt Paving sand, liquid tar, asphaltum
for paving Rockaway Boulevard
Metropolitan Avenue & Grand Street (Newtown Creek)  ca. 1913
unknown paving stone Kent Avenue & Division Street
US Government - Department of the Navy - Brooklyn Navy Yard material and supplies for US Government Flushing Avenue & Claremont Avenue 1919
US Government - Post Office Department mail sorted and transported to outlying stations Adams Street & Johnson Street
W. W. Vandewater scrap iron & metal (mostly from BRT shops) Park Avenue & Classon Avenue
Park Avenue & Grand Avenue
1927
J. H. Williams heavy machinery & parts 150 Hamilton Avenue (Richards Street & Bowne Street) ca. 1913


Public Delivery Yards as of 6/25/1913 unless otherwise noted


lumber yard
coal yard
located at Unionville a/k/a Ulmer Park
(former Brooklyn Bath & Coney Island Railroad siding)

Bath Avenue & Bay 19th Street  (former American Express Co Bath Beach Depot) ca. 1910
Flushing Avenue between Marcy & Nostrand Avenues
St Nicholas Avenue & Gates Avenue
Third Street and Third Avenue
Bergen Street & Troy Avenue
23rd Street and Sixth Avenue
19th Street and Seventh Avenue
Reid Avenue & Marion Street
Gillen Place and Jamaica Avenue
Franklin Avenue & Atlantic Avenue
Flatbush Avenue & Vernon Avenue
Avenue J and Rockaway Parkway
Adams Street and Concord Street
Halsey Street & Broadway


Public Delivery Sidings

Commercial & Box Street
Fulton Street & Sands Street
Flatbush Avenue & Avenue N
Broadway & Fulton Street

1 - South Brooklyn Railway permitted trained & qualified employees of H. J. Heinz and Thomas Raulston companies to operate and move trolley motors on the sidings.
2 - Saltser & Weinier's employees permitted to shift cars within their premises 
3 - permission given to William's employees to shift cars on their siding.

.
   The following tables are a list of sidings as published in the Linder / Eppler articles and are reproduced here for convenience.


List of Sidings in Service as 1912

Brighton Beach Hotel
Herkimer Street Ash Station
Flatbush Avenue near Plaza
Liberty Avenue & Snediker Avenue
Post Office (Adams Street)
West End & Beach Crossing
Neptune Avenue and Brighton Line
end of Cypress Avenue
Ridgewood Yard
Willow Street near Wyckoff Avenue
East 32nd Street

.
   There were 49 sidings in 1913 growing to 72 sidings by 1917, that were being served by the South Brooklyn Railway. 

.
.
List of Sidings in Service as of July 3, 1917

List of Sidings in Service as of July 11, 1921

Station Siding Station Siding
Bath Beach Ulmer Park Bath Beach Cropsey Avenue & 25 Avenue
Bath Beach Bay 19th & Bath Avenue Bath Beach Bay 19th & Bath Avenue
Bath Junction 63rd Street & Seventeenth Avenue Bath Beach 63rd Street & Nineteen Avenue
Bath Junction 63rd Street & Sixteenth Avenue Bath Beach 63rd Street & Seventeenth Avenue
Bedford 56 Nostrand Avenue near Park Avenue Bedford 56 Nostrand Avenue near Park Avenue
Bedford Park Avenue & Grand Avenue Bedford Park Avenue & Grand Avenue
Bedford Flatbush Avenue & Nostrand Avenue Bedford Kent Avenue & Division Avenue
Bedford Williamsburg Power Station Bedford 575 Flushing Avenue
Bergen Beach Bergen Beach Terminal Bedford Atlantic Avenue & Nostrand Avenue
Bergen Beach Kemble Ave Bedford Flushing Avenue & Cook Street
Brighton Beach Ocean Avenue between Avenue X and Avenue Y Bedford Avenue J & Rockaway Parkway
Bushwick Flushing Avenue & Cook Street Bedford Flatbush Depot
Bushwick St Nicholas Avenue & Gates Avenue Bedford Ralph Avenue & Atlantic Avenue
Bushwick DeKalb Depot Bedford Fulton Street & Furman Street
Bushwick Covert Avenue & Cornelia Street Bedford 40 State Street
Canarsie Canarsie Terminal Bedford Varick Avenue & Stagg Street
Canarsie Avenue J & Rockaway Parkway Bedford Halsey Street & Broadway
Coney Island Brooklyn Borough Gas Company (Coney Island Creek) Bedford 150 Hamilton Avenue
Coney Island Culver Yard Bedford 3rd Street & Third Avenue
Coney Island Sea Beach Yard Bedford 9th Street & Second Avenue
Coney Island West 36th Street & Surf Avenue Bedford Jamaica Avenue & Railroad Avenue
Coney Island West 17th Street & Surf Avenue Bedford Bergen Street & Franklin Avenue
Corona Union Avenue Bedford Nostrand Avenue & President Street
Corona Grand Avenue Bedford Tompkins Avenue & Fulton Street
Cypress Hills Woodhaven Sand Pit - Jamaica Avenue Bedford Franklin Avenue & Montgomery Street
Cypress Hills Liberty Avenue, end of line Bergen Beach Bergen Beach Terminal
Cypress Hills Jamaica Avenue & Crescent Street Coney Island 4 sidings
Cypress Hills New Lots Avenue & Berriman Street East New York Gillen Place & Jamaica Avenue
Dean Street & Franklin Avenue Bergen Street & Franklin Avenue Gravesend Gravesend Avenue & Kings Highway
Dean Street & Franklin Avenue Pacific Street (Transit Development Co) Gravesend Gravesend Avenue & Avenue U
Dean Street & Franklin Avenue Nostrand Avenue & President Street Greenwood 3 sidings
Dean Street & Franklin Avenue Tompkins Avenue & President Street Kensington 10 sidings
Dean Street & Franklin Avenue Franklin Avenue Car Barn 39th Street & Third Avenue 38th Street & Second Avenue
East New York East New York Loop
Flatbush Vernon Avenue Yard 39th Street & Third Avenue 40th Street & Second Avenue
Flatbush Cortelyou Road & Coney Island Avenue 39th Street & Third Avenue 23rd Street between Fifth & Sixth Avenues
Flatbush Holy Cross Cemetery
Flatbush Flatbush Avenue & Nostrand Avenue
Flatlands Flatbush Depot
Flatlands Flatbush Avenue & Avenue U
Flatlands Coney Island Avenue & Kings Highway
Flushing Terminal Loop
Fort Hamilton Terminal
Fort Hamilton 86th Street & Fifth Avenue
Fulton Street & Furman Street 8-10 Fulton Street
Fulton Street & Furman Street end of Brooklyn Bridge
Gravesend Gravesend Race Track / Brooklyn Jockey Club
Gravesend Kings Highway & Gravesend Avenue
Greenwood Fort Hamilton Avenue & Culver Line
Greenpoint Commercial & Box Street
Greenpoint Meeker Avenue & Newtown Creek
Jamaica Terminal
Kensington 3 customers
Middle Village Dry Harbor Road & Metropolitan Avenue
Middle Village Fresh Pond Road & Lutheran Line
Middle Village Maspeth Depot
Newtown Dock 4 customers
North Beach Terminal
Richmond Hill Schwetzen Park
Richmond Hill Myrtle Avenue & Jamaica Avenue
Reid Avenue & Fulton Street Halsey Street & Broadway
Reid Avenue & Fulton Street Ralph Avenue & Atlantic Avenue
Reid Avenue & Fulton Street Reid Avenue & Fulton Street
Reid Avenue & Fulton Street Troy Avenue & Bergen Street
Sheepshead Bay Sheepshead Bay Yard
Sheepshead Bay Sheepshead Bay Racetrack
63rd Street Dock 58th Street & Second Avenue
63rd Street Dock 63rd Street & Second Avenue
63rd Street Dock 63rd Street & Sixth Avenue
3rd Street & Third Avenue 19th Street & Seventh Avenue
3rd Street & Third Avenue 20th Street & Ninth Avenue (Depot & two private sidings)
3rd Street & Third Avenue 9th Street & Second Avenue
39th Street & Third Avenue 52nd Street Dock (Transit Development)
39th Street & Third Avenue 52nd Street Storeroom (Transit Development)
39th Street & Third Avenue 39th Street Yard
39th Street & Third Avenue 23rd Street & Fifth Avenue
39th Street & Third Avenue 36th Street & Fifth Avenue
39th Street & Third Avenue 38th Street & Second Avenue
39th Street & Third Avenue 39th Street & Third Avenue
39th Street & Third Avenue 29th Street & Third Avenue

   Please note that some station names changed, but the siding location remained the same between the two lists.

..

.
Siding List: Last Year Reported - 1921
.
location installed
40 State Street  1921
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported - 1922
.
location installed location installed
Avenue C & Coney Island Avenue 1917 North Beach Terminal 1912
Bay 19th Street & Bath Avenue 1912 Nostrand Avenue & Atlantic Avenue 1922
Canarsie Terminal 1912 Pacific Street (TD Co) 1912
Covert Street & Cornelia Street 1917 Reid Avenue & Fulton Street 1912
Coney Island Avenue & Kings Highway 1917 Rockaway Avenue & Hegeman Avenue 1917
Commercial & Box Street 1912 Smith Street - 9th Street 1922
DeKalb Depot 1917 Troy Avenue & Bergen Street 1912
Dry Harbor Road & Metropolitan Avenue 1912 Ulmer Park 1912
Liberty Avenue - end of line 1912 Union Avenue & Grand Avenue (Corona) 1912
end of Brooklyn Bridge 1912 West 17th Street & Surf Avenue 1917
Flatbush Avenue & Avenue V 1917 West 36th Street & Surf Avenue 1917
Fresh Pond Road and Lutheran Line 1912 19th Street & Seventh Avenue 1912
Flushing Avenue Yard (near Nostrand Loop) 1912 20th Street & Ninth Avenue 1917
Flushing Terminal Loop 1912 29th Street & Third Avenue 1917
8-10 Furman Street 1912 38th Street & Second Avenue 1912
Gravesend Race Track 1912 39th Street Yard 1912
Holy Cross Cemetery 1917 52nd Street Dock 1912
Jamaica Terminal 1912 52nd Street Storeroom 1912
Maspeth Depot 1917 58th Street & Second Avenue 1917
Meeker Avenue & Newtown Creek 1917 63rd Street & Sixth Avenue 1917
New Lots Avenue & Berriman Street 1917
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported: 1926
.
Siding List: Last Year Reported - 1928
.
location installed
86th Street & Gravesend Avenue 1926
25th Avenue & Cropsey Avenue 1921
63rd Street & Seventeenth Avenue 1912
63rd Street & Sixteenth Avenue 1917
Varick Avenue & Stagg Street 1912
Myrtle Avenue & Jamaica Avenue 1912
Emmons Avenue 1921
150 Hamilton Avenue 1921
Richards Street & Verona Street 1922
location installed
Richards (Rodman) Street & Coney Island Creek 1926
Coney Island Shop 1927
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported - 1929
.
Siding List: Last Year Reported - 1930
.
location installed
Tompkins Avenue & Fulton Street 1917
56 Nostrand Avenue 1917
location installed
Jamaica Avenue & Railroad (Autumn) Avenue 1921
23rd Street between Fifth & Sixth Avenues 1912
Franklin Street & Montgomery Street 1917
Halsey Street & Broadway 1917
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported - 1931
.
Siding List: Last Year Reported - 1932
.
location installed
Ralph Avenue, Mill Basin 1917
Wythe Avenue & Keap Street 1927
location installed
Gillen Place & Jamaica Avenue 1912
3rd Street & Third Avenue 1921
Bergen Beach Terminal 1912
Avenue N Depot 1912
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported - 1934
.

Siding List: Last Year Reported - 1936
.
location installed
Avenue J & Rockaway Parkway 1912
Nostrand Avenue & President Street 1912
Park Avenue & Grand Avenue 1917
Kent Avenue & Division Avenue 1912
location installed
Bergen Street near Franklin Avenue 1917
Flushing Avenue near Bushwick Avenue 1917
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported - 1937
.
Siding List: Last Year Reported - 1939
.
location installed
36th Street & Fifth Avenue 1912
location installed
9th Street & Second Avenue 1917
West 6th Street near Sheepshead Bay Road 1921
Culver Line near Coney Island Creek 1926
.
copyright © 2018 - freightrrofnyc.info - Philip M. Goldstein

.
Siding List: Last Year Reported - 1942
.
Siding List: Last Year Reported - 1945
.
location installed
McDonald Avenue & Avenue U 1921
location installed
Avenue X & Culver Line 1930
West 8th Street 1921
38th Street & Fifth Avenue 1912
.
.

.

The Decline

   There was a marked decline in customers following the conclusion of World War I. But this also coincided with the advent of the internal combustion engine and motor trucks. And as a result, the streetcar delivery system (and like railroads elsewhere) traffic began to diminish. It was the second step in the progression from horse drawn wagons. 

   Little by little, as more trucks were built and entered service there was less need for trolley motors to ply the routes. Now a truck could be sent and returned within hours and without having to shoehorn its way into a trolley schedule or wait until off peak hours (usually late at night), and thereby be sent out again quickly. 

   Another factor hastened the end of the streetcar system (both freight and passenger) in New York City as well as other cities in the U.S. Namely, the well documented General Motors Streetcar Conspiracy. So much has been written and said on this subject that it is not justifiable to expend the time or effort in reiterating it here. In short, it slowly devastated the streetcar systems in major cities throughout the United States.

   By 1940, there were only seven freight stations:

   Some of this decline was ameliorated by World War II due to gasoline and rubber rationing, and the South Brooklyn Railway held on. After World War II the "chicken in every pot and a car in every garage" way of life really took off, spelling doom for passenger carrying streetcars everywhere because the privately owned automobile was now in reach of just about everyone.

   The South Brooklyn Railway's vast borough-wide delivery network was whittled down as each street car route was converted to internal combustion powered buses; and one by one the dominoes fell until by 1956 only a solitary route through Brooklyn survived. 

   It is this route that is best remembered in the collective memories of todays transit buffs and railfans that lived in Brooklyn in the latter half of the Twentieth Century.

   On October 31, 1956, passenger trolley service was abolished along McDonald Avenue, and South Brooklyn Railway electric locomotives were the only recipients of current. 

   Following a study, it was decided on January 7, 1958 that the South Brooklyn Railway would cease operating its remaining electrically powered locomotives and motor cars after it was estimated it would cost upwards of $32,000 to rehabilitate the overhead trolley wire. This translates to $280,011 in 2018 dollars adjusted for inflation. 

   This discontinuance of overhead electric power would not have any effect on service as the South Brooklyn Railway already had in service two ex-US Army diesel electric switch locomotives, and would acquire two others in November 1960.

station # of customers
4/25/1946
# of customers
12/30/1955
Bath Beach 1 0
Coney Island 2 2
Gravesend 1 1
Kensington 3 2
39th Street & Third Avenue 26 20

   As of May 28, 1959, passenger service on the Culver Line was cut back to Ninth Avenue. This allowed the track to be rearranged on June 15th, so that the northbound Culver track "C-2" was connected to middle of track just south of Ninth Avenue. As a result, the middle track in the Ninth Avenue Station was no longer needed for passenger service allowing it to be realigned to provide through service to 37th Street right of way for the South Brooklyn Railway. 

   As a result of this new alignment and installation, the South Brooklyn no longer had to switch operating ends at Ninth Avenue, operate through the 36th Street Yard, then switch ends on the South Brooklyn's main line to Second Avenue. Also, the installation of third rail in 36th Street Yard and the Tenth Avenue Yard on March 25, 1958, made the trolley wire redundant, so it was removed between Fifth Avenue and the coal trestle at the east end of the 36th Street Yard. It was taken out of service at 10 am April 15, 1960. 

   A letter dated December 27, 1961 ordered the NYCTA electrical department to de-energize the overhead trolley wire.

   On November 19, 1965 a contract was entered with Sarnelli Brothers to remove the poles, overhead wire and other appurtenances between Fort Hamilton Parkway and Coney Island Freight Yard. The Branford Electric Railway Association signed an agreement to remove of the overhead wire between Fourth Avenue and New York Bay.

   For 1961, the following freight statistics were recorded: there were 63 loaded cars inbound and 18 cars outbound monthly. The 39th Street Agency, which concerns itself with customers west of the BMT Fourth Avenue Tunnel; the principal commodities were: pipe, brick, and canned goods for two regular and fifteen sporadic customers.

   The Greenwood Agency handles everything else from that Tunnel to Coney Island Yard and averaged 70 loaded inbound cars and 2 outbound loaded cars per month for that same year. Here, the principal commodities were rail, ties, track appliances and signal equipment and other related materials for the Transit Authority. Most of the rail and ties are delivered to the 38th Street Yard for the preassembly of track panels for the subway.

   During October and November 1961, approximately 60 carloads of grapes was hauled. This amounted to one quarter of the tonnage of the same commodity as hauled during the 1920's.

   In 1961, interchange with Long Island Rail Road Bay Ridge Division amounted to approximately 10% of annual freight traffic. The remaining 90% was interchanged via Bush Terminal Railroad.

   Also at this time, the south terminal of the South Brooklyn Railway is located in a team yard at Shell Road and Avenue Z, adjacent to the NYCTA Coney Island Shops. There is a small freight house, used by a forwarding firm, as well a track connection to the Coney Island Shops for the movement of subway cars. 

   In 1976, South Brooklyn Railway sold their yard between Second & Third Avenues to Davidson Pipe, but did retain an easement through the yard as well as occupies an office at the northwest corner of 39th Street and Third Avenue.

   Unfortunately, as stated in the Transit article below, and like the other contract terminals in the New York City, the South Brooklyn's freight customers were vanishing even along the fixed route. With the closing of Davidson Pipe in 1994 on Third Avenue and 38th Street (and where the South Brooklyn Railway would store their locomotives), the New York City Transit Authority was the only "business" for the South Brooklyn Railway. 

   And that is the way it remains today.

.

RETURN TO INDEX

.


Crew & Train Operations

   In September 2026, I undertook the initiative to redraw all the (now) crude (and subsequently pixelated maps) I had created when this page was first published in 2005. 

   Since I now have more resources at my disposal to refer too, such as Peter Doughtery's Tracks of the NYC Subway, and high resolution aerial photos of the facilities (via the New York Municipal Archives and the Brooklyn Public Library); it was also time to accurize the maps as well.

   In discussion with Paul Strubeck who was proof-reading the new text, and he sent me a scan of the following official document:

 

"Information for Employees Engaged In The Operation of Freight Service On The South Brooklyn Railroad - 
New York City Transit Authority.  

   This document was prepared in 1968 by Motorman Instructor Leonard Lacyk and Edward Taylor; and revised in 1976 by Motorman Instructor in charge of B-1 Division, Joseph Rossetti. The document was approved by Superintendent B-1, Alfred V. Broderick.

   Upon sharing that document with Peter Dougherty; Peter replied back with another version, which was revised as recent as 1984 (arrival of the R62-A subway cars.) Lord only knows how many times this documents has been mimeo and xerographed!

   At the expense of sounding like a priest in a pulpit, I give my utmost thanks to Peter and Paul. Amen.

INFORMATION FOR EMPLOYEES ENGAGED IN THE OPERATION

OF FREIGHT SERVICE ON THE SOUTH BROOKLYN RAILROAD

NEW YORK CITY TRANSIT AUTHORITY







Prepared By:
                      Motormen Instructor's
                          Leonard Lacyk &
                                  Edward Taylor
                                      ( 1968 )


Revised By:
                       Motorman Instructor
                     in charge B - 1 Div.
                                Joseph Russetti
                                 ( 1976 )



Approved By:
      Alfred V. Broderick
      Superintendent B-1
.
   The South Brooklyn Railroad is an independently operated subsidiary of
the New York City Transit Authority.

   Its operating personnel are all employees of the Transit Authoirty,
assigned to Division B-1

   The South Brooklyn Railroad operates a freight service. A majority
of new subway passenger cars are delivered to the Authority via the South
Brooklyn Railroad. It also services several private company subscribers in
the Bush Terminal and South Brooklyn areas.

   The Freight Office is located at 38th Streets and 3rd Avenue, Brooklyn.
The telephone number is 330-3896 330-5141 extensions B 8138 or B 8137  B5138

   The freight crew consists of a Conductor in Charge, Motorman, 2 Brake-
men and flagmen. All members of the crew except the motorman are qualified
Conductor Handswitchment.

   Conductors must have one year's experience as a Conductor Handswitchmen
before he may qualify as a Conductor in Charge of freight. He wil receive
3 8 days of training as a Conductor in Charge.

   The Motorman must be qualified on diesel and electric engines and all
miscellaneous equipment. He will receive 8 days of training as a Motor-
man of the South Brooklyn Railroad.

   The Conductor in Charge of Freight must assign duties to the other
members of the freight crew.

   He is responsible to the South Brooklyn Railroad Freight Dispatcher Traffic Mgr.

   The Conductor in Charge duties are to obtain a list of cars and their
delivery location from the Freight Dispatcher.

          a)   Keep an accurate account of the final disposition of cars.
          b)   Record all car numbers.
          c)   Record whether cars are empty of loaded, etc.
          d)   Line up moves to facilitate driling out cars, after locating
                 same and noting final disposition in record book.

           The Conductor in Charge must make sure that:

          a)   The crew works on the Motorman's side of engine whenever possible.
          b)   Angle cocks are closed on the open end of cars.
          c)   Angle cocks are open on the leaving end of cars that are cut off
                from trains.
          d)   Cars left or stored are secured with handbrakes and chocks.
          e)   Flagging signals for engine movements are carefully given and when
                personnel are clear of the cars.
          f)    Motorman is cautioned to observe position of switches, if possible,
                before moving.
Currently diesel engines N 1 or N 2 are used for motive power on the
South Brooklyn Railroad.

.
    The type of cars moved by the freight crew are various and consist of
Box Cars, Gondolas, Hopper Cars and Flat Cars, etc.

    Because of his responsibilities, the Conductor in Charge of freight
received a higher hourly rate of pay than any employee holding the title of
Conductor. Also, received extra hour pay daily for preparing C/R8s report.

    The South Brooklyn Railroad consists of:

a)    38th Street and 10th Avenue Yards.
b)    Tracks of the N.Y.C.T.A. System (Locations will be described later).
c)    Tracks along the southside of 37th Street to McDonald Avenue.
d)    Tracks along McDonald Avenue to Avenue Y (Coney Island Yard).

38th Street Freight Yard limits are from 1st to 5th Avenues:

a)   Bush Interchanges (BI) occupies the lower half of the 1st to 2nd
      Avenue Yard and is used for storage of empty cars or "Westbounds".

      1.  "Westbounds" are cars loaded by subscribers for the inter-
            changes with other railroads.

b)   The upper half of the 1st to Second Avenue Yard is used for incoming
      loaded cars and has unloading platforms for brick customers.

c)  Between 2nd and 3rd Avenues the yard is used mostly by the Davidson's
     Pipe Company and contains a scale track and a main line for access
     to the upper yards.

      1.   Crossing 2nd or 3rd Avenues, the motorman will sound the warning
            bell as other members of the crew flags vehicular traffic with
            red flags.
   
      2.   The gate entering upper 2nd Avenue Yard must be hooked to pre-
            vent contact with freight cars.

      3.   Loaded cars will be taken from 2nd Yard and placed at
            Davidson's Pipe Company or at other designated locations indica-
            ted by the Freight Dispatcher. Manager

      4.   Between 2nd and 3rd Avenues tracks are designated as:

            a)    New Yard (NY) - Moves to the New Yard tracks are made
                   from the 2nd Avenue end will dril moves extending into
                   2nd Avenue.
            b)    Main Line (ML).
            c)    Scale Tracks - May be used as a storage track.
            d)    11A & 13 Tracks -  Moves to 11A and 13 tracks are made from 3rd
                   Avenue, with drill moves extending into 3rd Avenue.
            e)    Since these tracks (except the Main Line) have short radius
                   curves, 65 foot and longer freight cars must be moved one at
                   a times to prevent derailments.
            f)     Clearance must be observed at all times especially around
                   curves as the center of long cars extend inwardly on curves.
            g)    Under no conditions are Gondola Cars to be moved from the
                   Davidson's tracks across 2nd or 3rd Avenues with iron
                   strapping hanging over the sides.
.
            h)   Between 3rd and 4th Avenues are more brick unloading tracks, access
                  for trucks and storage tracks for loaded cars and for further movement to
                 10th Avenue Yard (Up the hill). RAMP FACILITY for R-62-A CARS.

                 
10th Avenue Yard service the N.Y.C.T.A and other customers.
   
     At 5th Avenue, the South Brooklyn Railroad enters the N.Y.C.T.A. system
for a short distance and exits south of 9th Avenue lower level, passing thru
the C-2 track.

     Since the subway tracks have short radius curves, long cars present a clearance problem. When cars are to be moved thru the subway, the Conductor
in charge must make sure cars are tagged for clearance.

    Cars are tagged at 2nd Avenue for clearance by the South Brooklyn
Railroad Car Inspector Conductor In Charge

             
    All  clearance factors may be obtained by contacting the Freight Dispatch- MGR
er (B 8138)

                 a)   WHITE TAGS - All clearances for subway moves from 5th Avenue along
                       D-3 tracks to 9th Avenue upper level. Reverse to yard track Y-2
                       and wrong rail move over C-2 track lower level to 10th Avenue Yard.

                 b)   YELLOW WHITE TAGS - Limited clearance with moves from 5th Avenue,
                       over #10 switch in reverse, worng rail over D-4 track directly into C-2
                       track and 10th Avenue Yard.
 
                  c)  RED TAGS - Will not clear subway tracks

     (The Motorman will sound engine horn or) the Conductor in Charge will alert
Towerman when desiring to enter subway system at 5th Avenue.

     Before freight may proceed into the subway, the Towerman working at the
Freight Tower (38th Street & 5th Avenue Interlocking, (B 8 5157) must line-up
the move.

                  a)   A right-rail move will proceed on the bottom green, will will auto-
                       matically negate derailers at the entrance to the subway from the
                       freight yard.

                  b)   With YELLOW TAGGED cars and wrong rail move, the Conductor in Charge
                        must obtain permission from the Trainmaster's Office. Move over #10
                        switch in reverse, with a call on displayed, which will also negate
                        the derailers.

     Engines in the subway main line cars may be bucked or trailed, according
 to siding requirements

     All trains must be properly protected by having white and red lanterns
and back-up hose to enable the Brakeman to stop cars in the event the Motor-
man is unable to see right of way.
.
     Before passing thru C-2 track (9th Avenue lower level) the Conductor in
Charge must detrain and walk C-2 track to 10th Avenue Yard, making sure track
is unoccupied and hand throw switches are in the proper position. He will
then call the Towerman (B 8161) at 8th Avenue Tower requesting move and giv-
ing clearance for passage thru track.

     In the event C-2 track is blocked, 10th Avenue yard may be reached by
continuing up yard lead (Y-2) track from 9th Avenue upper middle and
into the Subway Yard.   Then freight will proceed along upper main line to 10th
Avenue Yard. the Yardmaster must be called to obtain permission to make this
move ( B 8156).

     At 10th Avenue Yard in Dunn's runaround and yard storage tracks for
cars to be transferred in either direction.

     Leaving 10th Avenue Yard (Southend) there are derailers on both tracks.
These must be removed and then replaced after the train has passed (Just)
north of Fort Hamilton Parkway),

     Since the handthrow switches along this route are accessible to every-
one, care must be taken to see that they are in the proper position when
passing sidings.

     Along 37th Street there are sidings that service:

     a)   Roberts Food - In between 10th Avenue Yard and Fort Hamilton
           Parkwayway (sic). Roberts Foods contracts for tank cars. Due to sharp
           curve normal hitches are difficult to make. A special adapter is
           stored to the left of the entrance in order to facilitate making
           hitches.
     b)   American Transp. Plastic Company.
     c)   Kleins
     d)   Kamco Supply Company

     The crossing of avenues must be done with traffic lights and the flagg-
ing of vehicular traffic with red flags.

     Along 37th Street handthrow switches admit train to the desired siding
(See strip map for sidings locations)

     The train crew must be careful of debris that could damage cars or
cause derailments.

     Before leaving the South Brooklyn Railroad the Freight Dispatcher will
call for a patrol car to assist crew in the event automobiles are blocking the right of way.

     Entering McDonald Avenue the Conductor in Charge must caution the
Motorman as the train will be operating on a main avenue. Due to the slow
train operation, many impatient motorists may attempt to pass. The train
crew must be constantly on the alert in order to prevent accidents.

     The next siding is called Parkville (Long Island Railroad Interchange).
The switches on McDonald Avenue need not be thrown when entering trailing point
switches as they are thrown by the pressure of the wheel flange. But due
to  the poor condition of the switch mechanism, facing point switches present
a problem. Metal tie plates must be inserted in track to guide wheels along
the facing point to prevent derailing.
.

     Train can be returned to the northbound track oer switch south of
Parkville (Avenue I)

     The next siding is [redacted - Flatbush Coal] located south of Kings Highway. How-
ever, to turn back the switch at Avenue Y must be used.

     The last stop is Coney Island Freight yard at Avenue Y. This yard
contains storage tracks and a runaround track. Material for the N.Y.C.T.A. is
delivered via this yard.


 At the entrance to Coney Island Subway Yard is a gate that is locked
by a No. 5 Master Lock #865. the key is obtainable from the Signal Maintainer
at Tower "C". The Maintainer is on duty from 8 AM to 12 Midnight, Monday to
Friday only.

    On the return trip, the train wil be operated over the northbound track
along McDonald Avenue to 37th Street just south of 14th Avenue, where train
will be switched to the southbound track and then to 10th Avenue Yard (remem-
ber derailer just north of Fort Hamilton Parkway).

     The Conductor in Charge must call 8th Avenue Tower (B 8161) from wall
phone (In 10th Avenue Yard) before entering lower level at 9th Avenue (C-2
track) subway and returning to the South Brooklyn Railroad Yard.


Alfred V. Broderick
Superintendent, B-1
.
.

SOUTH BROOKLYN RAILWAY COMPANY

Code of Operating Rules - Amended 7/1/1981


TO: All employees in Freight Service

1   - Conductor-in-Charge, checks engine capacity and will not attempt to
       overload, taking into consideration rail, grades and weather conditions.

2   - Crews when reporting, check sanders and refill when necessary.

3   - Prior to use of engine in service, engineer checks main reservoir and
       brake-pipe pressure for proper levels.

4   - Conductor-in-Charge checks clearance tags prior to moving cars.

5   - Member of crew are to wear their safety vests at all times.

6   - Engines must be on dock end of all trains moving up or down 38th street
       cut.

7   - Cars should not be coupled unless they are secured.

8   - Crews will not handle any car without brakes, unless special orders are
       received from supervision.

9   - Flagman must work same side of engineer

10 - Crews will stand clear of cars when coupling.

11 - Do not touch switch stand handle until train is clear of switch.

12 - Crews secure all cars left on sidings with hand brakes and a rolling
       chock.

13 - Conductor-in-Charge will report any defects of cars and will make a
       written report of any delays.

14 - Back-up hose must be used when bucking cars.

15 - At close of tour, engineer and conductor-in-charge will secure yard
       and engine.


                                            Andrew F. DeLuca
                                           Freight Traffic Manager
.

   Additional yard maps from other NYCTA facilities were included in the file, but have been omitted as they are not pertinent to the operation of the South Brooklyn Railway.

   As described in the Linder / Eppler article (which apparently took abridged sections of the above manual), the following procedure for operating a train is as follows: 

.

The Crew

   A typical freight crew consisting of a Conductor in Charge, a Motorman, two brakemen and a flagman. 

   All members of the crew except the motorman are qualified Conductor / Handswitchmen. The motorman is qualified on diesel and electric locomotives and all miscellaneous equipment, and of whom received eight days of training as a South Brooklyn Railway motorman. Conductors must have at least one years experience as a Conductor / Handswitchman, who then must qualify as a Conductor of in Charge of Freight after ten days training.

   The Conductor in Charge is responsible to the South Brooklyn Railway Freight Dispatcher and receives a list of cars and their destinations from him. Before the cars can move, the Conductor must record the following information:

  1. Keep an accurate account of final disposition of cars,
  2. Record all car numbers,
  3. Record whether cars are empty or not,
  4. Line up moves to facilitate drilling out cars.
    The Conductor must also make sure that the crew complies with the following rules:
   In the era of overhead trolley wire, the trailing trolley pole was raised. Trolley motors always trailed their poles. If the motor needed to reverse direction, the raised trolley pole was pulled down, and the opposite end raised to the trolley wire. This particular procedure ended when the SBK trolley wire was de-energized and Diesel-electric locomotives were solely the motive power.



Freight Car / Train Movements


   Freight cars that were interchanged between the South Brooklyn Railway and Bush Terminal Railroad (1900-1971) and its successors: New York Dock Railway (1972-1983) and New York Cross Harbor RR (1983-2006) were stored in the portion of South Brooklyn Railway's yard located between First and Second Avenues.

   Bush Interchanges (BI) occupy the lower half of this yard; and it was used for the storage of empty cars, designated "Westbounds" (to New Jersey). This also included loaded outbound freight cars that have been loaded by customers of the South Brooklyn Railway for interchange with other railroads in New Jersey and the United States.

   The upper half of this yard was used for incoming loaded cars (or "Eastbounds"), and the yard had unloading platforms for brick customers.


   Crossing Second Avenue eastwards, was the yard located between Second and Third Avenue. from 1900 to 1950, it housed a freight house, a team yard (tracks with driveways for direct freight car - horse & wagon / truck unloading), which became known as "Paramount Station".
This yard contains a scale track, and a main line track leading to the upper yards.

   
After 1960, and as freight traffic declined; the property was increasingly taken over by Davidson Pipe Company. Towards the 1970's very little switching was done at this location, and the track through the property simply became a through track, to get from the First / Second Avenue Yards to the rest of the route.

   When the train is ready to cross Second and Third Avenues (as well as all other crossings), the motorman / engineer sounded the warning bell while the crew flagged vehicular traffic with red flags.

   In the yard between Third and Fourth Avenues there were more brick unloading tracks, access roadways for trucks (team tracks) and storage space for railroad cars. This is the 38th Street Yard was also known as the "Public Tracks" and later the "Unloading Yard."

   At this location,
the crew must also prepare the train for travel on subway tracks. Because of grades, curves and presence of third rail in the subway tunnels, locomotives must trail when operating upgrade (pushing) and must lead all freight cars operating downgrade. This is a precaution against runaway freight cars that might have become accidentally uncoupled. It is not currently known if this rule applied to subway car movements as well.

   Sometimes a locomotive was located at both ends of the train (push-pull).


   Because the trains must climb the long 1.72% grade in the tunnel and a short 4% grade from the portal near Eighth Avenue to the junction with the yard leads, the maximum train length is five freight cars.


   All freight trains were to be protected by red and white lanterns and were equipped with a
manual airline (also known as back up hose, or a tail hose) at the east end of the train. This hose, opened or closed a ball valve with a simple 90 degree turn of the handle on the end (not a gate valve that requires many turns to open or close), was attached to the train brake pipe at the glad hand, and was held by the brakeman or conductor riding the movement from this end.

   This was done in order to stop the train, should the motorman be unable to see the right of way. The conductor / brakeman opened the valve which exhausted the air and the applied the train brakes. Those of you that are unfamiliar with train air brakes, air pressure keeps the train brakes off - losing air pressure whether suddenly or gradually applies the brakes - it is a failsafe.

   Because of the sharp curves in the subway, two long cars must not be coupled together.

 
   After the locomotives are in their respective locations, the train proceeds one more block east, to between Fourth & Fifth Avenue where it now approaches the junction with the West End Line and Fourth Avenue Line subway tracks.

   All South Brooklyn Railway trains must stop at this junction, even today; which is protected by dispatcher controlled (automatic) derails and a red signal. At this location, the "Freight Tower" was located. This tower was short lived, with controls being transfered to the 38th Street Tower.


   The SBK crew contacts the tower operator governing the junction - it was first controlled by the "Freight Tower", which was located at this junction; but in later years, it was transferred to the 38th Street Tower further east. The freight train crew also notified the tower operator
if any freight cars carry yellow tags, as special permission must be obtained now; so the dispatcher can set up a wrong rail move over switch #10, (from track D-3 to D-4) thereby aligning the correct route for the freight train.

   The dispatcher then negates the derails, throws the switch from the SBK tracks D-1 and D-2 to its "reverse" position on D-3, and
clears the signal aspect for the train to proceed onto the subway track D-3, (and  D-4 for wrong railed movements.)

   When the train arrives at the Ninth Avenue Station on Track C-2 (lower level); the train comes to a stop. It must wait until the conductor detrains and walks on foot (about 600 feet) along track C-2 to the Tenth Avenue Yard, making sure the track is both unoccupied and that the hand throw switch is properly aligned. 

   If Track C-2 is occupied, the train may call the dispatcher, to align a route west to operate up the incline and onto Yard Lead Y-2 and into the 36th Street Yard, where it can be switched and reversed direction again heading east. 

   Upon arriving at the Tenth Avenue Yard, the locomotive(s) which were coupled to the rear or west end of the train at Fourth Avenue on eastbound movements; are run around the train, and coupled to the east end (front) of the train. Then the train can resume it eastbound movement in a conventional towed manner.

   Upon leaving the Tenth Avenue Yard, the South Brooklyn Railway is now operating on its own right of way under the Culver "El", paralleling 37th Street where most of its customers are located. This is unsignalled (dark) territory and sections of the route have manual derails. 

   Depending on how far the train is going to travel, the train crew must drop the manual derails at Fort Hamilton Parkway, Thirteenth Avenue and Fourteenth Avenues, and any sidings the train may need to use; as well as raise the derails after the train has passed. These derails were a safety measure in case the hand brakes on a freight car failed or were intentionally released by vandals; and so the derail prevented a runaway car from going more than a city block.

   Before crossing avenues or streets that are protected by traffic control devices (traffic lights), crews must be sure that the vehicle traffic light (where mounted) is displaying green. Vehicular traffic must be flagged with red flags on streets and avenues not protected by a traffic control device.

   As the train proceeds along 37th Street, it will most likely interrupt an Italian bowling game, bocce; played on a cinder court between the rails. Images can be seen in the Memoirs chapter below.

   Trains operate infrequently between Kensington Junction where the South Brooklyn Railway right of way on the surface (and under the elevated Culver Line until 1980) turned south onto McDonald Avenue.

   

.

.

RETURN TO INDEX

.


Trackage, Right of Way & Facilities

.


Trolley Motor era - 1896 to ca. 1940

   Rapid expansion of the South Brooklyn Railway soon followed the turn of the century and about this time as the Brooklyn Heights Railroad and Brooklyn Rapid Transit began installing freight sidings from established trolley routes into various factories. 

  The first siding is recorded as being build for the Iron Clad Manufacturing Company, which made steel kegs and drums; and was located at Flushing Avenue & Cook Street. 

   As such, the South Brooklyn Railway delivery network was vast, as it could take advantage of the huge network of trolley tracks throughout Brooklyn.

   By referencing that 1914 article, we can see by the list of delivery stations in Brooklyn as far north as Greenpoint, as far south as Coney Island, as far west as Bay Ridge, and surprisingly, as far east as Jamaica, Queens. 

   If there was a set of trolley tracks in the street, you can be pretty sure the South Brooklyn Railway had an agreement with the owning railway operator to deliver freight along that route. And there were dozens of streetcar line operators throughout Brooklyn. And since those streetcar operators kept getting consolidated into the larger Brooklyn Rapid Transit and then Brooklyn Manhattan Transit conglomerate, it only made sense to keep the freight traffic "in the family".

   The following map, circa 1930, shows the surface streetcar routes (solid red lines) of Brooklyn of that date. It has been annotated by the author as such but as one can plainly see, the streetcar network was vast and with it, the early delivery network of the South Brooklyn Railway. It should be noted that not all freight stations and not all customers existed at the same time.


.

.


Fixed Rout
e era - ca. 1940 - 1994

   The actual date on which the SBK trolley network service officially ended, eludes us to this day. I have never seen the date mentioned in any of the historical ERA articles or on contemporary websites. It just seemed to have happened, and the SBK fixed route replaced it. 

   What is known that the institution of fixed route service greatly preceded the date of final day of trolley operations in Brooklyn (taking place on October 31, 1956.)

   As internal combustion powered buses replaced trolleys, the trolley networks of Brooklyn (and other boroughs) shrunk, and quite rapidly. Most of the trolley routes were changed over to bus operation within a 10 year span between 1930 and 1940. 

   Each of those routes that were converted to bus and the tracks ripped out (or paved over) was a lost route to SBK service, cutting ever deeper into their earning overhead. This was the impetus behind their Paramount Station venture where they contracted with Horstmann Trucking, so that freight could be transferred from railroad freight car to a truck for final mile delivery within Brooklyn, and off the trolley route.

   In 1938, the dual service (freight and streetcar) tracks along McDonald Avenue (formerly Gravesend Avenue and so renamed in 1931) were reconstructed. As originally constructed, the horse and automotive lanes to the outside of the trackage were paved, but the two track railroad right of way in the center remained unpaved. 

   When the overhead elevated line along McDonald Avenue was built in 1920, it had the girder supports between the auto lanes / rail right of way. This sort of kept the two types of traffic segregated, but now by the 1930's with ever increasing automobile and truck traffic, more space was needed for them. 

   So, the 70 pound (per yard) conventional profile rail  under the elevated structure was replaced with heavier 128 pound grooved girder rail , and the space between the rails and elevated supports graded and paved south of Avenue P, at first, but eventually the entire McDonald Avenue right of way would see paving between the tracks from Shell Road all the way to Kensington Junction. 

   Only the portion of the South Brooklyn Railway line adjacent to 37th Street remained conventional profile rail and unpaved right of way.  

   Prior to the the construction of the Belt Parkway in 1940, the private South Brooklyn Railway right of way south of Avenue X veered to the east of the Culver Elevated through undeveloped tidal lands of Coney Island Creek, which it crossed on a low trestle.

   With the construction of the Belt Parkway, and the development of the surrounding lands to join the Brooklyn street grid; the South Brooklyn Railway right of way was realigned to the public thoroughfare Shell Road, and the freight station and yard in the Culver Terminal by West 6th Street was closed with new replacement facilities located on the east side of the Coney Island Yard. The southbound Shell Road track opened for service April 29, 1940 and the northbound track on May 6.

   Following the end of passenger streetcar service in Brooklyn on October 31, 1956 (and probably predating that by a bit) the South Brooklyn Railway now had a solitary "fixed" route through Brooklyn when it hauled general freight for customers. And only customers situated along this route could get freight service from the South Brooklyn Railway.

   The line began (or ended - depending on your point of departure) at 38th Street and First Avenue Yard, where incoming freight arrived via interchange with the Bush Terminal Railroad was received. The Bush Terminal Railroad placed the cars in the interchange yard between First and Second Avenues and 39 and 37th Streets. 

   From here, the South Brooklyn Railway route took it though the neighborhoods of Sunset Park, Greenwood / Borough Park, Kensington, Parkville, Midwood, Gravesend and Coney Island.

   Joe Korman was gracious enough to allow me to use the following two images from his website before he passed. These two images are from a New York City Transit Employees internal magazine, called (what else?) "Transit".

   The article was published in the March 1955 issue, and contains some very interesting information on the South Brooklyn Railway. Most importantly, that by this date; the South Brooklyn Railway is illustrated is that solitary dedicated route. 


both images above:
 March 1955 issue of "Transit Magazine"
collection of Joseph D. Korman

added 07 Sept 2009

.

   As of July 2018, we now have two historical maps at our disposal showing South Brooklyn Railway trackage. 

   Recently re-discovered in an October 1976 issue of the ERA Bulletin is a track plan which is dated September 1960. I took a little time and effort and cleaned it up for legibility. While there are not too many differences between this map and the Raudenbush map of 1961 (they are dated within one year of each other), however this 1960 ERA map shows the locations of derails and bumping posts (end of tracks) and quite as importantly, the names of a few of the customers served! It is not to scale, and it omits the interlocking complex west of Ninth Avenue Station

.

   However, I also took note of some inaccuracies and omissions in the original, and of which have been confirmed with both aerial imagery and in enthusiast's photographs. I procrastinated for 8 years in revising this plan. Therefore, in September 2026, I spent another a few hours redrawing the plan re-lettering it.


original map courtesy of October 1976 issue Electric Railroaders Association Bulletin
The portion of trackage between Fourth Avenue and Ninth Avenue was not included in the original map and
"Dunn's Runaround" was strangely omitted west of Roberts Foods. It has been added.
 Note 1: Tracks east of Fifth Avenue and west of Ninth Avenue, including the interlocking is not shown on this map. Refer to the clearance maps below.
   Note 2:   The author almost certainly remembers a crossover located in the vicinity of Billings Court, between Kings Highway and Avenue S.

map cleaned and modified by author

added 05 July 2018

.

  

.


original:  H. Raudenbush Map - 1961
modified:  P. M. Goldstein - 2026

(numbers correspond to map locations below)



Rerouting throughout the Years: A synopsis

.


Original Route:
39th Street / 37th Street / Kensington Junction / Gravesend Avenue to Culver Terminal

(inception to 1926)

Original Route:
39th Street / 37th Street / Kensington Junction / Gravesend-McDonald Avenue to Coney Island Yard & Shops
(1926-1978)

.
Post 1975 Routing


   After the Culver Shuttle elevated service ceased on May 10, 1975, Track was C3-4 severed at the tunnel portal, but Track C2 would remain the route into the Tenth Avenue Yard for some time to come.

.
Post February 1978 Routing

   In 1978, all street operations of the South Brooklyn Railway came to an end: on both the 37th Street Right of Way as well as McDonald Avenue.
The el structure would remain, until being demolished in 1980.

   According to Jay Bendersky's book "Brooklyn's Waterfront Railways"; the South Brooklyn Railway ceased operations on the portion of trackage south of Fort Hamilton Parkway, including the trackage between Dahill Road and Avenue I along McDonald Avenue, on February 1, 1978.

   Also, according to an email received on 09 January 2010 from Dan C. he states:

"I lived near McDonald Avenue from 1960 to 1990. McDonald Avenue was reconstructed in 1978. It was at that time that the tracks were removed from the rebuilt LIRR overpass between Foster Avenue and Elmwood Avenue. Tracks were also removed at the intersection with Avenue X / 86th Street. These removals severed the connection. But for some unknown reason the now useless tracks were left in the street on McDonald Avenue while the outer lanes were properly torn up and rebuilt. When I left Brooklyn in 1990 the tracks were still there. If I remember correctly, they were paved over by 1992 and have been subsequently ripped out of the roadbed by the NYCDOT.

Even stranger was that in 1979 the NYCDOT painted Railroad Crossing indicators on the pavement of all the streets crossing McDonald even though by then it was by then impossible for trains to run there. They also put up little Railroad Crossing inventory tags on the pillars of the el. Maybe some of them are still there."

   His email caused me to recollect the fresh "R X R" pavement markings, so this may be my source for believing the McDonald Avenue trackage was still in service. But, with that Avenue X / McDonald Avenue trackage removed, it would have been impossible for trains to access the Coney Island Rapid Transit Car Overhaul Shop, (or more simply: "the Coney Island Shops") and Coney Island Yard via McDonald Avenue trackage.

   While I originally understood the right of way to have been shut down in two phases (36th Street Yard to Avenue I and Parkville Junction to Coney Island Yard), and after a lengthy telephone conversation with Ben Schaeffer; his information shows my understanding to be faulty, as the entire South Brooklyn Railway right of way from the east exit of the 36th Street Yard to Coney Island Yard being shut down at the same time. (Therefore I now believe that the street markings of R X R are what is causing me to think of a two segment shutdown.)

   According to Ben, the last movement of any kind on the southern segment (Parkville Interchange to Coney Island Yard) was Sperry Car #402 being brought from Coney Island Yard to Parkville Junction on Thursday, January 31, 1978. On that same day, Conrail BR-1 (Oak Point Yard, Bronx to Bay Ridge, Brooklyn) dropped several cars for pick up by South Brooklyn Railway at Parkville Interchange.

   The next day; on Friday, February 1, 1978; South Brooklyn Railway removed those few cars from Parkville and brought them points north along the Kensington Junction to 36-38th Street Yard segment. After this last movement, all street trackage between the 36-38th Street Yard and the Coney Island Yard including 37th Street and McDonald Ave was embargoed. The reason for this embargo was for the anticipated resurfacing of McDonald Avenue.

   In July of 1978, the New York City Department of Transportation sent a crew to apply the "RXR" pavement markings at each intersection as compliant with highway safety regulations. Ironically about the same time, a notice for abandonment was filed with the Interstate Commerce Commission by the South Brooklyn Railway to abandoned its trackage south of Fort Hamilton Parkway.

   To the best of Ben's recollection, on or about August 1981 the abandonment was approved. In approximately 1983, the McDonald Avenue overpass over the LIRR Bay Ridge Branch was scheduled for reconstruction. When it was rebuilt, street trackage was not part of the new design. This author distinctly remembers the tracks embedded in McDonald Avenue abruptly ending on both the north and south sides of the new overpass, but no tracks in the newly poured concrete of the overpass itself! This was before I became a historian, and I also recalled saying to myself "what idiot designed this? How will the South Brooklyn Railway use the McDonald Ave trackage!?!?" (Not realizing at that time the SBK street trackage along McDonald Avenue had been abandoned.) 

   No matter, as no train had or would ever transverse the trackage, since 1978 or would again. Most of the trackage on McDonald Avenue did remain embedded yet visible in the street for many years to come. 

   Due to the lobbying of Dov Hikind, a local Brooklyn assemblyman; the trackage along McDonald Avenue was at first simply paved over. The Parkville Interchange was in his district, and I believe it was stated in his proposal, that the:

      At some point during the 1990's, that resurfacing had grown dilapidated and to so effect a proper job, the now buried rails needed to be excavated and new substrate laid. And so McDonald Avenue was completely torn up, the rails removed and the thoroughfare resurfaced.

.  However, on an unknown date and sometimes in circa 2010; Track C3-4 would be re-connected to the old SBK running tracks on 37th Street (still in place to Fort Hamilton Parkway (and now used for equipment storage); and Track C2 was severed and abandoned (as well as Track C-1 had been, but that was never used by the SBK.) Again, the exact date this change took place is not certain, so anyone that has a more firm date, corrections or additions; you are invited to contact me.

.

Alternate Route 1 (red):
NYCTA BMT West End Line - Coney Island Shops Routing:
1916 - present (especially post-1978) and 2012-2013

   Following the abandonment of street trackage south of Fort Hamilton Parkway including McDonald Avenue in 1978;  the main route for the transport of subway rolling stock and MOW matériel on flatcars and in gondolas is along the existing elevated trackage. This route would take South Brooklyn movements via the BMT "West End Line" elevated (currently the  train) along New Utrecht & Stillwell Avenues and into the Coney Island Rapid Transit Car Overhaul Shop, (or more simply: "the Coney Island Shops"). 

   The Coney Island Shops are one of only two major overhaul facilities for all the subway equipment in New York City (the other major overhaul shop being 207th Street in Uptown Manhattan). Staten Island Railway equipment is also repaired at the Coney Island Shops, but must be trucked over the Verrazano Bridge.

   Returning to the routing, it must also be understood that with this routing, two factors have to be kept in mind when using the West End Line elevated:

1) There are clearance restrictions due to platforms and station canopies that prevent larger freight cars (i.e. boxcars), so movements via this route are mainly comprised of just subway cars, flatcars & gondolas.

2) Non-revenue train movements of the type that South Brooklyn Railway handles would have to be dovetailed into the off-peak schedules of those regular subway trains.

   This South Brooklyn Railway routing enters this elevated trackage at the east end of the 36-38th Street Yard (just a couple of tracks south of where they used to enter street running on their former route along 37th Street). It is here that South Brooklyn Railway trains would be switched from yard trackage to the "mainline" of the West End Line, (which circumvents the 36-38th Street Yard for its continuous and unhindered routing under Fourth Avenue).

   An inclined transition from the subgrade trackage to the elevated had been constructed in 1916 with the construction of the West End Line elevated.

   This route is shown in red in the map above.

Alternate Route 2 (green):
Bush Terminal / Second Avenue / First Avenue / Brooklyn Army Terminal / Bay Ridge Branch / Linden Shops
1987 - ca. 1990's, 2012

   In 1987, it was discovered that the Williamsburg Bridge was in dire need of major repairs and required emergency repairs. This required closing the bridge to both vehicular traffic and transit services. As closing the bridge would isolate some of Northern Brooklyn's subway lines, access would still be needed to get subway equipment in need of maintenance & repair to and from the NYCTA's Coney Island Rapid Transit Car Overhaul Shop, more easily called "the Coney Island Shops". So, on or about October 1987, the South Brooklyn Railway entered into an agreement with Long Island Rail Road (both entities being operated by the Metropolitan Transportation Authority).

   This agreement allowed for the South Brooklyn Railway to operate over Long Island Rail Roads' Bay Ridge Branch between the hours of 19:00 and 03:00 (thats 7:00 pm and 3:00 am for those of you who cannot read 24 hour / military time). This route allows movements from the LIRR Bay Ridge Yard to the NYCTA Linden Shops or Canarsie Yard, both located in East New York.  It would also require the South Brooklyn Railway to operate on New York Cross Harbor Railroad trackage under a separate agreement, as well. All told the route was very arduous to say the least.

   A South Brooklyn Railway test train was scheduled, and the route was as follows:

From Coney Island Yard, north up the West End Line (currently the NYCTA  train),
switch off the West End Line at the SBK switch between 4th and 5th Avenues,
west through the Third Avenue & 38th Street Yard, to Second Avenue and 39th Street.
Here, the South Brooklyn Railway would switch upon and turn south onto the New York Cross Harbor Railroad trackage on Second Avenue at "Bush Interchange",
south for two blocks along Second Avenue to 41st Street and curve under the corner of the warehouse (of which so many photos are taken),
turn west down 41st Street for one block to First Avenue turning south again,
South along First Avenue to 58th Street,
through the Brooklyn Army Terminal to Long Island Rail Road Bay Ridge Yard and turning east onto the LIRR Bay Ridge Division. 
From here, up to either the Linden Shops (for track & structures) or to a point just north of the BMT Canarsie Line New Lots Avenue Subway Station Train,
A reverse move was necessary to switch onto the Canarsie Line  Line and finally
entering into the East New York Yard. 

   Even after the Williamsburg Bridge was rehabilitated, the South Brooklyn Railway would still see use of the Bay Ridge Branch (see Memoirs), and would still utilize it today if need be.

.

.

The new NYNJ Rail - South Brooklyn Railway Interchange:
2012 - present

   The original plan, as part of the South Brooklyn Marine Terminal reconstruction had the South Brooklyn Railway's 39th Street Yard between Second and First Avenues being ceded to the South Brooklyn Marine Terminal property. 

   It also had the South Brooklyn Railway now interchanging with New York New Jersey Rail (the successor to New York Cross Harbor Railroad) at South Brooklyn Railway's 38th Street Yard between Third & Fourth Avenue (two blocks east of the original interchange point) but this is not shown in the diagram. Matter of fact, none of South Brooklyn Railways trackage was represented and their 39th Street Yard is shown as "green space".


November 28, 2007 presentation by New York City Economic Development Corp (NYCEDC)
to ASICMA on "Infrastructure in New York City"

.

   As such, it seem to be that New York New Jersey Rail would have operating rights on the South Brooklyn Marine Terminal trackage, proceeding across Second Avenue, utilize the trackage adjacent to Costco, cross Third Avenue and possibly interchange with South Brooklyn Railway at the South Brooklyn Railway's 38th Street Yard.

   It appears by 2012, that plan had changed. Information now handed down to the author now had the South Brooklyn Railway interchanging with the New York New Jersey Rail at First Avenue & 39th Street, one block west of the original interchange point, following a complete restructuring of the track layout.

   The graphic below has the yard trackage for the South Brooklyn Marine Terminal still oriented for north / south (and of which the former SBK 39th Street Yard is currently oriented east / west), but with the tracks moved to the eastern boundary of the property instead of running up the center. And with that revised track entrance being located at 39th Street and First Avenue providing access into the yard for New York New Jersey Rail and allowing an interchange with South Brooklyn Railway.

   This original graphic below was originally from the "Sunset Park Vision Plan" of 2009 and was modified by the author to reflect all changes prior to May 2012.

   As the proposed reconstruction of the South Brooklyn Marine Terminal shows trackage splitting east and west from a First Avenue and 39th Street access point, this arrangement would have effectively dissected the original South Brooklyn Railway 39th Street Yard. Therefore, this South Brooklyn Railway Yard was removed in its entirety to facilitate the new trackage alignment.


   In 2006, the New York Cross Harbor Railroad became New York New Jersey Rail, also known as NYNJ Rail. Also about that time, NYNJ Rail welded the turnout point located at First Avenue and 41st Street for the First Avenue alignment. This weld prevented New York New Jersey Rail traffic or South Brooklyn Railway traffic from using 41st Street to Second Avenue and then to the Bush Interchange where interchange at Second Avenue & 39th Street could take place.

   In short, the SBK was now isolated at Second Avenue and 39th Street at their yard. Therefore, the transfer of any freight traffic (if any!) from NYNJ Rail to South Brooklyn Railway now had to go through the Brooklyn Army Terminal and to the Long Island Rail Road / New York & Atlantic Railway Bay Ridge Yard to NYCTA Linden Shops for transfer anywhere else in the NYCTA System. Until 2012, it was not an issue as NYCTA was not receiving any freight traffic or equipment via rail from NYNJ Rail.
   
   This would change in 2012. When the order for the twenty-eight new R156 work locomotives (MotivePower MP8AC-3) was proposed, a way was needed to transfer those locomotives to the NYCTA / South Brooklyn Railway. As NYNJ Rail was already revamping its track structure, and as part of the New York City Economic Development Corporations' Sunset Park Improvement Plan, the South Brooklyn Marine Terminal was being reconstructed. So, the opportunity presented itself for a new interchange with shallower radius curves and heavier rail to include conventional two point turnouts, as well as eliminating the sharp reverse curves encountered previously along the 41st Street routing. 

   The NYNJ Rail "main" was continued north along First Avenue for one more block to 39th Street (it previously ended mid-block between 41st and 39th Streets at a large industry), then turning gradually to the east to a turnout where the track would split to either a multi-track siding serving the the South Brooklyn Marine Terminal or connect with the South Brooklyn Railway. This new interchange was no more than one city block west of the old "Bush Interchange" but it so dramatically eased the curvature of the track alignment.

   Unfortunately, this new interchange was not ready for use by May 1, 2012 when the first locomotive (0L912) of the new order arrived for the NYCTA. It would not be until the delivery of the second locomotive, which would have the honor of being the first NYNJ Rail / SBK interchange to utilize this new interchange.

   This interchange remains in service. With thanks to an internal source, the delineation line of the South Brooklyn Railroad and New York New Jersey Rail is established at the Second Avenue crossing at 39th Street, in which the legal documents states: 

"WHEREAS, the 2nd Avenue Grade Crossing at 39th Street is the point of delineation between NYNJR rail territory and operations and SBK Rail territory and operations, and;

WHEREAS, the Parties desire to establish an interchange agreement, to formalize and accurately reflect how interchange traffic emanating from both Parties' facilities will be handled, with the primary interchange activity to be NYNJR delivering rail cars to the SBK Connection Track (as hereinafter defined); and

WHEREAS, the parties are willing to enter into this Agreement on the terms and conditions provided herein for so long as the Parties tender rail cars to each other..."

West of this point is NYNJ Rail property, but SBK does have access rights as far as the switch at First Avenue and 39th Street.




South Brooklyn Railway / New York New Jersey Rail Delineation Point
(North is to the right)
annotated map by author
not to be reused or reproduced without consent.

added 18 April 2021


.

.

RETURN TO INDEX

.


.


.

Car Clearances & Necessary Routing



   One of the more interesting facets of South Brooklyn operation was the tagging of "foreign" freight cars. Foreign in this definition denotes freight cars that were not part of the IND / BMT / NYCTA Transit System; i.e. freight cars from other railroads. 

   Before any "foreign" railroad cars could traverse the South Brooklyn Railway routing from Third Avenue to Ninth Avenue, they had to have their dimensions measured to see if they required special handling due to tunnel clearances as well as clearance to the third rail between Fourth Avenue and Seventh Avenue.

   So, those cars from other railroads (and not part of the South Brooklyn Railway / Transit roster) must first be checked for dimensions and clearances and appropriately tagged at Second Avenue.


   Freight cars with RED tags must not be operated on subway tracks.

   Freight cars so Red Tagged, must not go further east than 38th Street Unloading Yard (between Third and Fourth Avenues).

   
YELLOW and WHITE tagged freight cars may move east of Fourth Avenue, provided:

   Freight cars with a YELLOW tag have limited clearance, and must be moved over #10 switch east of Fifth Avenue in reverse.

   Trains then run wrong rail over northbound D-4 track directly into C-2 track (lower level) in Ninth Avenue Station after which they proceed to the Tenth Avenue Yard.


    A WHITE tag indicates that a freight car may be operated in the tunnel on southbound track D-3 to Ninth Avenue upper level (West End Line, center track), where train reverses direction westwards) and briefly enters upon on Yard Lead Y-2.

   Train then reverses direction again (eastwards) then make a wrong rail move on lower level (Culver) northbound track C-2 to the Tenth Avenue Yard.

   Without a doubt, it was an unusual part of operations of the South Brooklyn Railway when it hauled freight cars, but a very necessary part.


all at right: collection of author

   The three diagrams below show the South Brooklyn Railway train routing for either white tagged freight cars (above) or yellow tagged freight cars (center) from circa 1950 through 1975.

   The bottom diagram shows the post-May 1975 routing.

   Click on the diagram below for high resolution version.



   SBK freight movement routing shown with trackage in blue. Thick blue denotes running tracks, thin blue denotes sidings.
   Blue & yellow
arrows show direction of SBK eastbound freight movement.
   Orange denotes section of route that requires "wrong railing" (travel against the normal flow of rail traffic.)
   Red stop signs reflect furthest point of freight train travel on that track (white tag only).
   Red and white "do not enter" signs reflect locations of severed or out of service tracks.
   Gray tracks reflects all other trackage that will not be used by SBK freight movements; however, SBK can operate on these tracks if necessary.
   Small single ended gray arrows â†’ denote normal traffic direction. Double ended gray arrows ↔ signifies rush-hour running on center tracks (am: north/west bound - to city; and pm: south/eastbound - from city)
   Dashed lines of any color denotes trackage obscured under an overpass, underground, lower level of station, or in tunnel.

   Special thanks to Peter Dougherty for allowing the use of his track and yard maps on page 90 of Tracks of the New York City Subway - 2024 Edition
as starting point for the above maps. 
.



   Now, I have been pondering this issue for some time. What exactly was the restriction / close clearance. In discussion of the track routing with Peter Dougherty (author and publisher of the NYC Subway Trackbook) we have been bouncing ideas off one another. I owe him a great deal of thanks in getting my brain to shift into overdrive. Let us analyze this.

   First, the clearance issue seems to have arisen after the tunnels were built in 1914. BMT used the AB Standard subway car starting in 1914; of which its dimensions were: length 67' 6" - height 12' 1â…›" -
width 10' 0".

.
Length? Nope.

   So obviously by comparing the length of the subway car length to that of the 36' boxcar
common at that time; length was not an issue - as the subway cars was 31 feet longer. This eliminates curve radius as being the restriction.

   The 40 foot box car which became the standard in 1937, and actually 40' 6" in length, were still comparatively shorter that the AB Standard. So length is not the determining factor.

.
Height? Nope.

   The 36' box car of that era had a height of 12' to the eaves, 12' 6" to the roofline. A standard 40' boxcar has an overall height of 13 feet. The AB Standard has a height of 
12' 1â…›" - but also keep in mind the AB Standards had a low clerestory and arched roof line, allowing lower roof sills; as does all subway cars have arched roofs.

   This means that even with the 40' boxcar being 10â…ž inches taller at the track center line than that of the subway car; it should also be noted that the tunnel roofs between Fourth Avenue and Tenth Avenues are not arched, but flat roofed, which allows maximum clearance at the eaves as well as the center line.

   Furthermore, as we have seen many photos of standard 40' boxcars both east and west of the tunnels between Fourth and Tenth Avenues, eliminates height as the issue.

.
Tunnel Width?

   That leaves width. The AB Standard subway car, and all B division subway cars (IND / BMT) after it are 10 foot wide. The standard AAR boxcar design Plate B dimensions for a 40' boxcar allow up to 10' 6" outside width. This equals 3" each side over and above the subway car width dimensions.

   That doesn't seem like much; and until now, I have been concentrating on tunnel curvature, tunnel width, clearance to third rail, etc. Nothing would prevent the boxcar from moving in the tunnels and I could not surmise a satisfactory answer as to what the restriction might be.

.

Track Width between Platforms!

   Until you get to the station platforms. The station platforms!!! How could I be so obtuse?!?

   This has been the bane of subway stations designers for quite some time. The movable platforms at Times Square, South Ferry Loop and 14th Street Union square allow subway cars to negotiate the tight curves, but of which leaves a wide space at the center of the car. The platform gap filler solved this problem. But gap fillers are only needed on curves, not on straight platforms because the platform is allowed to come close to the door sill.

   But the extra 6" inches (3" each side) of the boxcars would strike the platform edges! This explains why the South Brooklyn Railway movements were restricted to C-1 track; as it only had a platform along one side of the car (unlike Track C2 which had platforms of either side.)

   Furthermore, it is possible (but unsubstantiated) that Track C-2 was located just a smidge further away from the platform than normal. Since this side of the platform was not used by passengers, they wouldn't notice the extra inch or two. Only the track department would know. However, this remains to be confirmed, if it can even be confirmed 70 some odd years later.

   The next time a reader is on the subway - look at the platform edge. Most platforms have a sacrificial wooden rub board (usually a piece of 2" x 6" painted yellow) affixed to the side of the lip of the concrete platform. In my travels, I have encountered where this board was damaged or missing altogether from the edge. With it missing, it adds 2 extra inches of gap. If this rub board was simply omitted from the Track C2 platform edge, would have given the freight cars just that more clearance.


January 19, 1960

   Always on the prowl for good "library" (or "throne" ) material to read; I recently began to re-read Eric Oszustowicz's two volume set "The Elevated Railways of Brooklyn and the BMT Subway". (ERA, 2022)

   In his books, Eric spells out a very comprehensive and detailed time-line for events. On page 173, Volume 2; dated January 19, 1960:

Track C2 (the northbound local track) on the lower level of the Ninth Avenue was now connected to the South Brooklyn Railway track south of the station. Also during this period, the platform on Track C2 was cut back to accomodate freight cars being transferred by the South Brooklyn Railway. This allowed freight traffic to bypass 38th Street Yard. Today (2022), the center track (track C3/C4) of the lower level is connected to the South Brooklyn Railway right-of-way so that trains can reach the refuse platforms south of Ninth Avenue. Currently, tracks C1 and C2 end at bumping blocks at the south end of the station.

This is a very interesting revelation, because not only does it make good operating sense, but also this contradicts the images below.

.
SBK Red Gondola Cars (modified)



   If one were trace out the trains path via the SBK trackage back to Ninth Avenue, this "platform side" side of the gondola would fall next to the Track C2 (north / westbound platform side) of the Ninth Avenue Station.

   And, if my conclusions is correct, these gondolas could not be used anywhere else in known SBK routing; i.e. West End Line; (on any track in the subway system), for the following reasons:

   The uncut ribs would strike any station platform on that side of the car - meaning it could not be used on the West End Line as:
  • Track D2 (northbound track) as local platforms are on uncut side of gondola, 
  • as would be if running Track D3-4 (center express track) as the uncut side of gondola would interfere with northbound center "express / local" platforms; 
  • nor could they be used on Track D1, where the cut side of the gondola would clear southbound local platforms; but again, not the center local / express platforms.
  In the photo seen at left, we see SBK #12, with a red gondola which is marked "PLATFORM SIDE" in crude white letters. Note that the lower portion of reinforcing side ribs are torched off, giving the lower portion of the car greater clearance to a platform. Like, say; a subway platform? 

    How did I come to this conclusion above? A couple of grainy photos in my collection taken by Mike DeLuca, and taken circa 1971-1972 when the R44's were being delivered.

   There were actually two gondolas, both of which can now be seen in a companion image of this train and just prior to pulling into the yard, and can be seen below.

   In the photo below, which shows of the "other" side of the gondola, it is clear the ribs are not off and full length to the bottom of the sill.

   Obviously, only one side of ribs on the gondola is cut, because if both sides were cut, why would only one side need to be marked?

   Since almost every subway or elevated line in Brooklyn and in the South Brooklyn Railway operating area was three or four track with center island platforms, these cars could not be used on these lines.

   Therefore, it appears these red gondolas were only used as spacer cars on the SBK; and had MCB / AAR couplers on both ends, could possibly be used on the PC / CR / LIRR Bay Ridge Branch as there were no passenger platforms to be concerned with.

   They also cannot be considered transition cars (which have a MCB / AAR coupler on one end, and Form 70 (or other type of subway coupler) on the other end.)

   This is determined by the image seen at left. Clearly seen is a "deepwater green" Penn Central gondola after the red gondolas, but before the R44's. Therefore the PC gondola is serving as a transition car.

   The PC gondola car (transition car) would have been used to haul the subway cars from the St Louis Car Company manufacturing plant. (Ironically the R44's were to be the last subways cars built by SLCC prior to going out of business.)

   As the far end of the PC gondola car is mated to the R44 car, that end had a Form 70 coupler. The close end of the PC gondola has MCB / ARR coupler, as do both ends of the red gondolas, and the end of SBK #12.

   Two questions remain unanswered about the red gondolas:

   1)  Why the red spacer cars were needed in this mover remains unknown, and these three
         photos are the only known images showing the red gondolas in service.


   2)  It is also believed the red gondolas were in captured service by the South Brooklyn
        Railway and not intended to leave the SBK trackage, as I have not encountered their
        use on any other part of the NYCTA system.


   It is apparent, that with the introduction of coupler adapters, the use of transition cars whether those made from old subway cars or from freight cars; were no longer needed to "adapt" a MCB / AAR coupler equipped locomotive to subway equipment, which is why we no longer see transition cars in use in later photos of South Brooklyn Railway operations.

   The earlier images show a variety of obsolete subway cars, both with their carbody as well as without; and freight cars pressed into service as transition cars.



An alternative not used...

   Another solution would be the usage of gantlet tracks; such as those in use at New Jersey Transit's stations at Roselle Park and Union, NJ of which NJT operates upon the Conrail Shared Assets Operation Lehigh Line. This route sees usage by both heavy freight rail traffic as well as commuter traffic.

   Freight cars (being wider than subway or commuter cars) if they were to take the same track as commuter cars which is closer to the platform, the freight cars would strike the edge of the platform. Likewise, if the platform was wider to meet to commuter cars on the freight tracks, the freight cars would strike the platform (like what would have occured in the Ninth Avenue Station.)

   The commuter fleet is slight narrower than that of the freight cars, so they need to get closer to the platforms.
.

freight train on outer set of gantlet tracks
keeping it farther away from the platform
(north / east bound track)
 
(south / west bound track)

commuter train on inner set of gantlet tracks
bringing it closer to the platform
(south / west bound track)

   So, an inner set of gantlet tracks provides the solution. Heavy freight uses the set of rails farthest from the platform providing extra clearance. In the photo at upper left, note the freight locomotive is on the outer set of rails of the north / eastbound track (other side of station from images above center and above left) to provide extra clearance for freight cars. The inner set of tracks goes unused at this moment, waiting for a commuter train.

   Hypothetically speaking, if a commuter train were to stay on the outer set of tracks, there would be a wider gap and one that could present a risk of passengers falling into. This does happen on occasion where the switches might freeze, or the some other set of circumstances necessitating the commuter train taking the outer set of rails. Here a bridge plate is used, and one can see the sign "Bridge Plate" under the eve of the station roof. 
The bridge plate is also used for wheelchair passengers.

both images: New Jersey Transit, Union, NJ Station on Conrail Shared Assets Operations Lehigh Line -  March 7, 2010
taken by author





February 1, 1978 - Embargo Day


   Returning to the South Brooklyn Railway operation, when the Culver Line was running out of the lower level of Ninth Avenue Station, it utilized Tracks C3-4 (east & southbound) and C1 (west & northbound).

   So, the only track not being used for revenue service was C2, which the South Brooklyn Railway used.

   When the Culver ramp opened in 1954 and Culver Line service switched to IND Division operation, service was reduced to bi-directional single track operation on the Culver Shuttle elevated out of Ninth Avenue, and so track C3-4 became a spare, but it still was not usable for freight because of the platform clearance!

   When the Culver Shuttle service was abolished altogether in May 1975, C3-4 and now C-1 were unused.

   By May 1975, there were only two customers remaining: Davidson Pipe and Roberts Foods; and only one of those was east of Ninth Avenue Station, that being Roberts Foods.


   The hauling of subway cars to and from Coney Island via the lower level on Ninth Avenue would only last until February 1978 as well.

  


   In February 1978, the South Brooklyn Railway embargoed (placed out of service) most of the route along 37th Street east of Fort Hamilton Parkway and onto McDonald Avenue all the yard to the Coney Island Yard entrance at Avenue Y.

   Service continuing to 37th Street west of Fort Hamilton Parkway, therefore Robert's Foods would retain rail service.

   The hauling of subway cars (new inbound or those for outbound for rebuilding or scrap) now went via the West End Line.

  



   When Roberts Foods closed circa 1987 (exact date needed), thereafter f
reight car clearances no longer mattered to South Brooklyn Railway operations. Davidson Pipe was the last customer, and since they were located between Second and Third Avenues and therefore west of the tunnels and Ninth Avenue Station; their rail service was unaffected.

   The only rail traffic now going through the lower level of Ninth Avenue Station was NYCTA work equipment from the "C Division."
 NYCTA work equipment, "C Division" and often called the Divisional-Independent or Non-Revenue / Operations Support Division) refers to the specialized division of the New York City Transit Authority that manages work trains, maintenance-of-way equipment, and non-revenue rolling stock.

   Most of which was / is built to 9 foot widths so as to be able to be used on IRT - "A Division" as well as BMT / IND "B Division."


   

.

Signaling


   It must be kept in mind, that east of Fourth Avenue, South Brooklyn Railway movements are sharing trackage with the subway system. As such, most of the subway signalling is set up for directional running.


   Complicating these movements, is that most sections of the subway are not signaled bi-directionally - (usually only the center rush hour express track is set up for bi-directional operation on those lines, when so equipped.) Cross overs are alomst always signaled from all points of entry - with minor exceptions.)

   So, while a South Brooklyn Railway train on one of the subway tracks "wrong railing" may occupy the block, i.e: the SBK train would be moving say east on a westbound track, while a subway train is moving west, and with both happening at the same time, eliminates the two block safety spacing between any two trains on a single track.

   
Because the signals only face the direction the normally operated subway train is coming from (in this example westbound), that signal is not visible to the crew of the South Brooklyn Railway train heading eastbound. Therefore, they can't tell if the block ahead of them is occupied or vacant.

   Therefore ANY railroad traffic moving against the established flow of traffic, is operating
in "dark territory" (un-signaled) and must get verbal clearance from the dispatcher. Only after the dispatcher has ensured that the line is clear, can the SBK train occupy the track(s). To do so, the dispatcher must stop all scheduled subway trains far enough away, so the freight train may move without hazard or hindrance.

   
As such, to avoid the unnecessary delay of scheduled passenger movements, these "against the flow" movements were often scheduled for off-peak hours of passenger travel, those hours being: 10 am to 3 pm or from 8 pm through 6 am. Often during these hours, the center express track goes unused.

   It should also be noted, that these maps reflect freight traffic, and not the hauling of subway cars; as a June 1965 image exists of SBK bringing new R-32 subway cars up the D3-4 incline through Ninth Avenue Station on their way to Coney Island Yard via the West End Line. The hauling of subway cars were not restricted by white, yellow or red tags.

   It is understood the restriction that dictated this procedure was located in the tunnel east of Fifth Avenue.

   
I do not yet have accurate track maps for the yards for this era of operations, but the layout shown conforms to aerial imagery from 1966 to 1980 era.

.
.

RETURN TO INDEX

.

Location List

.

1) First & Second Avenue Yard
"BI cars"

7) 36th Street SBK "Materials" Yard / Tenth Avenue Yard 13) Avenue S & (Gravesend Avenue (McDonald Ave)
Voorhee's Feed, Flatbush Coal
.
2) Second Avenue - Bush Junction:
Bush Terminal RR
8) 37th Street & Ninth Avenue Station 14) Avenue U & Gravesend Avenue (McDonald Ave)
Brooklyn Jockey Club
.
3) Third Avenue Yard
SBK freight house / SBK Offices / Davidson Pipe
9) Greenwood Ind'l Sidings along 37th Street
15) PP&CI / LIRR / SBK freight house
at Culver Depot @ West 6th Street - Coney Island
.
4) 38th Street & Third / Fourth Avenue "Unloading" Yard
Public Team Tracks
10) Kensington Junction
Kings Highway Lumber & Burns Bros Coal
16) SBK Culver Yard freight house at Avenue Z
.
5) BMT Fourth Avenue Subway Tunnel Interchange
BMT Junction / Switch 10
11) 20th Street & Ninth Avenue Depot 17) Bedford Car Load Freight Station
.
6) 36-38th Street BMT Yard 12) Parkville Interchange
Long Island Rail Road
18) Motor Truck Delivery

Numbered links above correspond to map locations below.
9 - Greenwood Industrial Sidings has multiple links in a sub-map at that chapter.
Photos of non-station locations are interspersed geographically along the route.
Click on map below for large scale image.


1)  First / Second Avenue Yards - "BI" Bush Interchange - Sunset Park

.

   The northwestern-most point of the trackage was the storage yard located between 39th and 38th Streets between the bulkhead of Gowanus Bay and Second Avenues just to the north of the 39th Street Ferry Terminal. 

   The trolley line (#8 / #35 Church Avenue Line) running along the south edge of the yard was not part of the South Brooklyn Railway, and the tracks were separated by a tall wood panel fence line.

   After reviewing maps, it now appears that most of the trackage between Second Avenue and the bulkhead was "inherited" from the US Navy Fleet Supply Base, after operations of this facility ceased post-World War 1

   Randall Auguste was generous enough to allow the use of the following two plates from his 1912 Belcher Hyde Atlas of Brookyn. In it, we can view early track and building arrangements of the Brooklyn Rapid Transit / South Brooklyn Railway facilities in the Sunset Park area.

1912 E. Belcher Hyde Atlas of Brooklyn, NY
courtesy of Randall Auguste
(two plates scaled and merged by author)
added 18 April 2021

   On 02 January 2010, Joe Roborecky located two maps in the Library of Congress' Historic American Buildings Survey / Historic American Engineering Records; U.S. Navy Fleet Supply Base, Brooklyn, Kings County, NY.

   Referencing these two maps, it appears that upon conclusion of World War I, the US Navy began to relinquish a great deal of its property in Sunset Park. 

   While it had been the authors conclusion that Brooklyn Rapid Transit / South Brooklyn Railway sold a portion of its property to the US Navy, which went on to build its own yard and railroad upon this land, it turns out this was not the case. 

   The US Navy had leased the unimproved land from the City of New York, and built their structures and installed the trackage throughout the base to connect the various storehouses, as well as interchange with Bush Terminal Railroad.

   Shortly after the conclusion of the World War I, the land reverted back to the City of New York, and some of the base yard trackage between 37th Street and 39th Street was connected to the South Brooklyn Railway across Second Avenue, giving the South Brooklyn Railway additional yard space.

   The first map is undated but appears to be circa 1913, as the proposed (but never constructed) "South Brooklyn Marginal Railroad" is shown. It appears that the Brooklyn Rapid Transit trackage extended to and occupied a pier north of the Ferry Terminal. 

   Notice how 38th Street is still shown as a through street. You may click on the map below to bring you to a larger version. Use your back arrow to return you here:


Brooklyn Rapid Transit / South Brooklyn Railway, Brooklyn, Kings County, NY - circa 1913
Library of Congress - Historic American Buildings Survey
Historic American Engineering Records

added 02 January 2010

.

.

   The second map is dated August 20, 1919 as part of the Navy Fleet Supply Base packet of information; and shows a great deal more trackage and a significant yard belonging to the US Navy abutting the north property line of Brooklyn Rapid Transit Yard (which is the South Brooklyn Railway and unfortunately this trackage is not shown in detail).

   Note how the yard has begun to resemble the "hour glass" figure of later eras. Note there is no direct connection shown between the South Brooklyn RR property east of Second Avenue and the tracks west of Second Avenue.

  Also, if you take note; the pier north of the ferry terminal is now flanked by a pair of float bridges ("Terminal Bridges"), and according to the legend the trackage is now marked for the US Navy (solid lines = Navy RR, broken lines = other RR).

   Also take notice that the 38th Street thoroughfare is no longer shown and the "Property of the South Brooklyn RR" is now a two block parcel. It is this parcel which would become Davidson Pipe Yard in later years.

   Again, you may click on the map below to bring you to a larger version. Use your back arrow to return you here.


Brooklyn Rapid Transit / South Brooklyn Railway (U.S. Navy Fleet Supply Base), Brooklyn, Kings County, NY - August  20, 1919
Dashed lines represent BRT 39th Street trolley. Solid lines represent US Navy Fleet Supply Base trackage.
Library of Congress - Historic American Buildings Survey
Historic American Engineering Records

added 02 January 2010

.

   The Navy would continue to occupy certain parcels of property abutting the South Brooklyn Railway's 39th Street Yard through at least the 1950's, but they eliminated their railroad operation in or around 1920. The north-south trackage parallelling Second Avenue connecting the storehouses was eliminated, but the yard tracks became part of the South Brooklyn Railway Yard. 

   If by chance you are interested in the Navy operation, I have authored a webpage on that history and of which may be read here: US Navy Fleet Supply Base - South Brooklyn Section

   In 1930, in an effort to compete with trucking companies, the South Brooklyn Railway entered into contract with the Horstmann Trucking Corporation to handle interchange freight at this location. In the tariff filings, this location was called "Paramount Station, Brooklyn, NY". This venture was unfortunately short lived, due to the extra expense in having to offload the freight into trucks to deliver the freight off the South Brooklyn Railways' route. 

   This Fairchild Aerial oblique image of the South Brooklyn - 39th Street area showing redevelopment; dated January 16, 1931; reflects the beginning of the reconstruction of the area. The US Navy Fleet Supply base has been downsized, most of their yard tracks between the buildings and Second Avenue are removed. South Brooklyn Railway has taken over the US Navy trackage to the south of the buildings, for use and interchange with Bush Terminal Railroad. 

   Note that the 39th Street Trolley Right Of Way is segregated and fenced separately from the South Brooklyn Railway trackage.

   During this era, the South Brooklyn Railway saw a lot of freight traffic and they undoubtedly needed the additional yard trackage, and put it to good use. Click on the image below for an unannotated version.


South Brooklyn Railway - 39th Street Yards between bulkhead and Third Avenue - January 16, 1931
Facing north.
New York Municipal Archives - Image ID: REC 0028 20 14 1674-1
Department of Records and Information Services (DORIS)
annotated image - © 2026 by author

added 24 July 2026

   I have included two additional crops of the above image to show the fantastic detail. First and Second Avenue Yards, 39th Street runs along the dashed line:


Zoom in on fence line separating trolley R.O.W and SBK yard trackage. 
North is up.



One block to the east: 39th Street - Third Avenue Yard and Freight House (to become Davidson Pipe) - January 16, 1931
Note freight cars at front of freight house.
North is up.

.

   This next image, dated ca. 1934; shows the relative (lack of) development of the land formerly occupied by US Navy Fleet Supply Base or the Ferry Terminal / Trolley area waterfront area; but a new building (with peaked roof) has been constructed towards the middle of Third Avenue Yard, and tracks and freight cars fill the railyard portion of the property. The Fifth Avenue Shuttle Elevated is still present, curving from 38th Street to Third Avenue. 


South Brooklyn Railway - 39th Street Yards between bulkhead and Third Avenue - January 16, 1931
Facing east.
New York Municipal Archives - Image ID: REC 0028 20 14 1674-1
Department of Records and Information Services (DORIS)
annotated image - © 2026 by author
added 24 July 2026

.

.

   The closest item that has surfaced to date that reflects the track structure of the South Brooklyn Railway at this location in the 1940's, is a Port Facilities & Terminals Map dated 1942. As the property between Second & Third Avenues that would become Davidson Pipe Yard was still in fact owned and part of the South Brooklyn Railway during the time of this map, it is shown here for continuity.

   Note the hourglass configuration (ooh la la!) of the First Avenue Yard. This appears to be a remnant of some of the track layout from the Fleet Supply Base.


Port Facilities & Terminals Map - 1942
US Army Corp of Engineers
authors collection

added 02 January 2010

.

.
Looking west at SBK #9 in the First / Second Avenue Yard South Brooklyn Railway / Bush Terminal Interchange Yard
about to cross Second Avenue - ca. 1948
D. Klepper photo
added 22 September 2026

.

.

   It is April 3, 1952, and the Brooklyn Dodgers defeated the New York Yankees 11 to 1 in Spring Training today! Meanwhile, back in Sunset Park; an Fairchild Aerial Survey airplane is flying over the South Brooklyn Railway facilities around noon (note the shadows of the poles - they make great sundials!). This image shows how the half the Third Avenue Yard trackage has been removed, and this area has been re-purposed as a bus yard and it appears to have been paved. However the trolley poles still stand with their bases now painted alternating black and white; while the bases of the trolley poles in the tracked portion are all white bases. (Black bands to contrast from snow during those months for the bus drivers?) We can see the very tip of the Gowanus Express in the bottom right corner.

   What is most interesting is the Paramount Station is in operation. Note the tractor trailers and trucks backed up to the team track siding with that cut of four box cars; and we can even make out Trolley Motor #9980 - its one man cabs on either end are easy to spot! Derricks 9006 and 9007 at the west end of the yard trackage, with two trolley gondola motor to the east and up track from them. A little harder to discern, but that might be a Trolley Box Motor on their east end. No Diesel-electrics or steeple cabs are present.

   The land in front of the US Navy Fleet Supply Base has been graded, but is still vacant. By the storehouses, a lumber yard appears to have take up residence; but the dwindling number of freight cars in the yards is not a good sign. 


South Brooklyn Railway - 39th Street Yards between bulkhead and Third Avenue - April 3, 1952
Facing west-northwest.
New York Municipal Archives - Image ID: REC 0131 02 02 02308
Department of Records and Information Services (DORIS)
added 24 July 2026

.

.

   When passenger service ended on the Norton's Point Trolley Line in Coney Island in 1948, the South Brooklyn Railway became strictly freight. One can see the Church Avenue trolley line (#8 which later became #35) to the 39th Street Ferry (formerly operated by Brooklyn & Queens Transit and now the New York City Transit Authority) is still in service as we can see three PCC cars on the loop that ran to the ferry house. 

   To be clear, this line was not operated by the South Brooklyn Railway (their Norton Point trolley service in Coney Island ended in 1948.) This line trolley was not going to be in service much longer from the date of this image, as all trolley service in Brooklyn would cease in less than six months (that fateful day being October 31) from the date of this image May 15th.

   The First Avenue Yard is very empty: you can count the amount of freight cars on one hand: five cars. Three gondolas (one loaded and two empty) and a boxcar at each end of the yard. A new space frame building with a long loading dock (lightly sloped roof) has been built on the former Fleet Supply Base property and a wide thoroughfare added to the street grid. A larger high resolution version of this can be opened by clicking on the image below.


South Brooklyn Railway - First Avenue Yards between bulkhead and Third Avenue - May 15, 1956
Facing west-northwest.
New York Municipal Archives - Image ID: REC
0131 02 09081
Department of Records and Information Services (DORIS)
added 24 July 2026

.

.

   Taken a few moments before (or after) from the above image; this image below was taken on the same date but is now facing due west, but also was taken from further east, capturing the Third Avenue Yard in the view. 

   By this date, the South Brooklyn Railway freight house has been torn down, the internal tracks now visible, but Davidson Pipe has now taken up residence in the former Bus Yard. We can still make out Trolley Motor 9980 at the east end, and Paramount Station truck delivery service still looks active but not quite as busy.. A larger high resolution version of this can be opened by clicking on the image below.


South Brooklyn Railway - First Avenue Yards between bulkhead and Third Avenue - May 15, 1956
Facing west. The freight house has been razed.
New York Municipal Archives - Image ID: REC 0131 02 9104
Department of Records and Information Services (DORIS)
added 24 July 2026

.

.

   This image is nowhere as clear as the above images, but I would not be thorough if I did not include it in the chapter. The date December 8, 1960. Davison Pipe has filled out the Thrid Avenue Yard nicely, taking up the area formerly occupied by the freight house. That's about all that could be discerned from that image. There is a bit more freight cars in the First Avenue Yard than in the 1956 images above, but I surpise this may be more as a result of SBK having to relocate from the Third Avenue Yard due to the piles of pipe!


South Brooklyn Railway - First Avenue Yards between bulkhead and Third Avenue - May 15, 1956
Facing east.
New York Municipal Archives - Image ID: REC 0131 02 17646
Department of Records and Information Services (DORIS)
added 24 July 2026

.

.

   Commencing in 1959, the 39th Street Ferry House was torn down, and the basin to the west of the existing bulkhead was landfilled for the construction of the Northeast Marine Terminal Company; of which the anchor tenant for the property would be to Mitsui Shipping. The trolley loop and trackage leading to the ferry house from Second Avenue would also be removed (with all trolley service in Brooklyn having ceased in on October 31,1956); and the property is now being used as a parking lot. Not much in the way of railroad cars can be seen in the Yard.

   At some point over the next few years, the location would become known as the South Brooklyn Marine Terminal. 


South Brooklyn Railway - First Avenue Yard between bulkhead and Second Avenue - October 19, 1959 
Facing north
New York Municipal Archives - Image ID: REC 0131 02 16245
Department of Records and Information Services (DORIS)
added 24 July 2026 

.

.

   No where near as glamorous or information packed as the obliques are, I would be remiss if I did not include it. These were part of a survey. It clearly shows by this dates, how Davidson Pipe has pretty much taken over the Third Avenue Yard, leaving just the running tracks and one or two sidings unimpeded.


February 28, 1962
New York Municipal Archives - Image ID: REC 0131 02 18982

.

.

   April 8, 1970 - the Mitsui Pier has been finished since 1963 (out of view to the left). There are plenty of tractor trailers backed into the area loading docks; and very few rail cars. One must wonder if rail traffic to / from the new pier did not materialize has one might have hoped. In the coming years, this is where retired subway cars would be placed for interchange to New York Dock Railway for carfloating to New Jersey.


April 8, 1970
New York Municipal Archives - Image ID: REC 0131 02 21815
Department of Records and Information Services (DORIS)

.

.

   From 1970 until the 1990's, very little change regarding the trackage took place. By this era, the South Brooklyn Railway saw no freight and any haulage was either inbound new subways cars, with an occasional gondola of tie plates; or outbound subway cars for scrap. 

   The outbound subway cars would be positioned in the 39th Street Yard between First and Second Avenues; until a shipment to the scrapper was ready to be interchanged with New York Dock Railway (1972-1983) or its successor, New York Cross Harbor RR (1983-2006)

   In 1994, the "Bush Junction" interchange trackage was reconstructed; and in 2000 the First / Second Avenue Yards itself would be reconstructed. The diagram below is representative of both of those changes and shows the track configuration.

   A gate on the west border of the 39th Street Yard allows two tracks to exit the yard and enter the South Brooklyn Marine Terminal (no affiliation with the South Brooklyn Railway). These two tracks merge and form a single track which services a set of loading docks located along the north wall of the pier shed. This pier shed was formerly Mitsui, and now was the location of American Stevedoring. This location is situated upon the site of the old 39th Street Ferry Terminal.

   Oddly, the South Brooklyn Railway did not service this customer, but in fact the New York Cross Harbor Railroad would. 

   Unfortunately, this Marine Terminal would sit vacant and it understood it did not see rail service. As of 2010, the area went under extensive reconstruction to it's present configuration; which will be shown further in this text..


South Brooklyn Marine Terminal trackage - 1994 - 2010

.

.

Readers Please Take Note:

   It is now understood from documents located on the web, that the 39th Street Yard is now part of the South Brooklyn Marine Terminal property which is owned by the Port Authority of New York & New Jersey, and operated by Axis Group; and the 39th Street Yard is no longer owned or operated by the South Brooklyn Railway / New York City Transit Authority / Metropolitan Transportation Authority.

   As current information reflects that the South Brooklyn Railway / New York City Transit Authority / Metropolitan Transportation Authority no longer has and owning interest in the 39th Street Yard. As such, all updates pertaining to this particular location, will be posted in the South Brooklyn Marine Terminal chapter of the New York New Jersey Rail page of this website.  

.

.


2)  Bush Terminal / South Brooklyn Railway Interchange a/k/a "Bush Junction"

.

   On Second Avenue, there was interchange with the Bush Terminal Railroad until 1972, at which time New York Dock Railway assumed operation of the Bush Terminal properties and trackage.

   In August 1983, the New York Cross Harbor Railroad was organized (absorbing the New York Dock Railway and Brooklyn Eastern District Terminal operations.) The New York Cross Harbor RR operated until 2006. 

   At this time, the operation was renamed New York New Jersey Rail, and taken over by Port Authority of New York & New Jersey and the operation became a government subsidiary.

   It is this location, that is referred to as "Bush Junction" and is shown below.


"Bush Junction" 1960 - 1994

.


39th Street Yard & "Bush Junction" - 1994 - 2012
First / Second Avenue Yard reconstructed in 2000.

.

    Before we go any further, it is imperative to understand that the Bush Terminal Railroad (and likewise its successors) had a significant involvement in South Brooklyn Railway history. For it was at Bush Terminal where freight cars destined for and from the South Brooklyn Railway customers had arrived and departed from Brooklyn via the Bush Terminal float bridges at 50th Street.

   Without the float bridges at Bush Terminal, the South Brooklyn Railway would not have been able to received or ship freight cars, nor would it have lasted long as it has.

   Throughout the decades, countless new subway cars arrived at, and many obsolete subway departed via carfloats at the 50th Street float bridges of the Bush Terminal Railroad:


Bush Terminal 50th Street Floatbridge - April 24, 1950
"Seagoing subway cars - Somewhat out of their natural element, cars being transferred
from Queens IRT line to Bronx shops make detour through Brooklyn by way of Bush Terminal dock."
Brooklyn Eagle Newspaper archives
Brooklyn Public Library

added 22 Dec 2009

.


Bush Terminal 50th Street Float Bridge "Bush 1" (southern float bridge) - ca. 1985 - 1987
R68's arriving on left and right tracks with an R32 loaded on flat car on center track.
unknown photographer

added 22 Dec 09

.


SBK #9980 on Second Avenue.
Looking north, #9980 is pushing into the South Brooklyn Railway / Bush Interchange Yard.
The SBK brakeman on the ground is waiting for #9980's truck to clear the points for the Church Avenue trolley, then using the prybar, move the switch point into alignment for the trolley right of way.
The trolley can be seen waiting to come out of the trolley right of way.
SBK freight house on right edge of image.
D. Klepper photo
added 22 September 2026

.

.

   Once incoming subway cars bound for SBK arrived at Bush Terminal, they would then be moved by Bush Terminal locomotives to Bush Junction. They were either immediately handed off to the South Brooklyn Railway, or placed in the yard at 39th Street and Second Avenue. From here, South Brooklyn Railway locomotives would bring the subway cars to either the NYCTA 36th Street Yard or Coney Island Yard.

   Freight cars however, would be distributed to the various customers (when they existed) along the South Brooklyn Railway route by South Brooklyn Railway locomotives.


Bush Terminal RR #2 and South Brooklyn Railway #13 - September 28, 1965 - Second Avenue & 38th Street
Brand new R32's arriving at the BTRR/ SBK Interchange.
BT #2 on northbound track, SBK #13 on southbound track.
G. Landau photo
authors collection

added 22 Dec 09

.


New York Cross Harbor RR #25 - 1983 - Second Avenue & 38th Street
Brand new R62's arriving at the BTRR / SBK Interchange.
NYCH #25 is ex-BEDT #25 ALCo S1 coming off northbound track and
is about to enter the South Brooklyn Railway's 39th Street Yard.
unknown photographer
P. F. Strubeck collection

added 22 Dec 09

.

.

   This image, posted by the New York Transit Museum on their Facebook page; shows the Bush Junction scene somewhat. The S curves of the 39th Street trolley (abandoned) are in the foreground.

   Towards the background, to the right of the diner, the turnouts of the Bush Terminal Railroad can be seen. The crossing diamond and track of the South Brooklyn Railway is obscured.


New York Transit Museum archives

.

   Reportedly, when delivery of the first R68's was made on February 4th, 1986, they failed to negotiate a sharp curve on South Brooklyn Railway trackage on 38th Street in Brooklyn.

   
According to railfan lore, supposedly this curve had to be rebuilt and the radius eased somewhat; with delivery finally occurring on February 26th, 1986.

   An inquiry made to Fred Briemann, locomotive engineer on the New York Cross Harbor Railroad at that time (and Bush Terminal Railroad prior to that); relates that no trackage or curve was realigned for the delivery of these subway cars, nor were any delays incurred on a delivery of subway cars to the South Brooklyn Railway.

   He recalls that the turnout (highlighted in red in diagram to right) on the northbound track of Bush Terminal RR trackage on Second Avenue into the South Brooklyn Railway 39th Street Yard was temperamental; with many freight cars over the years "picking the points" and derailing.

   It should be kept in mind, trackage at this location was quite aged, located in a main thoroughfare and therefore abused by heavy commercial vehicular traffic; as well as NYC Department of Sanitation snowplows during snow removal. Another contributing factor, was that the turnout was a "single point" or "tongue & mate" switch (designed primarily for streetcar / trolley use), see Glossary.

   Corroborating this explanation, Joe Roborecky (also locomotive engineer also familiar with the route and railroad) added: this switch point was held in position by a wedge; and the roadbed was "soft", with the rail flexing in a vertical direction under load, which contributed to the point moving under load. Fortunately, train speeds were slow and either the "minor derailment" or "unintentional reroute" was remedied quickly with a portable rerailer.

   Therefore, in appears this "point picking" problem has been misinterpreted by the novice railfan as a "curve radius" issue. 

   Furthermore, copies of documents acquired by this author in a FOIA request, reflect that poor trackage conditions at this location were confirmed by internal South Brooklyn Railway documents in 1982 and 1989 and may be read here.

   In 1994 the Junction was reconstructed with double point (conventional) heavy rail turnouts and the issue eliminated.


   The diagram below reflects several changes taking place in 1994 and afterwards:

   Â¹ It is presumed (but not confirmed) that the removal of the street trackage on Second Avenue (#2 and 3 above) took place upon rebuilding of the interchange in response to the new trackage alignment for Costco property.


"Bush Junction" 1994 - 2012 - with new 39th Street yard constructed in 2000.

.

   The contracting firm for this reconstruction was T. Glennon of Piscataway, NJ.

   The South Brooklyn Railway 39th Street Yard was last used by NYCTA in 2007, as a location for asbestos removal from obsolete subways cars that were outbound and prior to reefing. After this date the remained unused.

   Commencing in 2011, the construction and new alignment of trackage of New York New Jersey Rail along First Avenue from 41st Street to 39th Street, as well as the reconstruction of the South Brooklyn Marine Terminal; required the "Bush Junction" interchange being abandoned and removed. The existing property of the South Brooklyn Railway 39th Street Yard was relinquished to the Marine Terminal property and subsequently demolished. 

.

Current Interchange

   The new interchange between New York New Jersey Rail and South Brooklyn Railway was relocated to First Avenue and 39th Street, and is reflected by the lime green & orange line segments in the map below. The purple line segments reflect the old yard and alignment. 

   This took place in 2012 with major redevelopment of the South Brooklyn Marine Terminal property.

   This new trackage eliminated the dilapidated street trackage, including the two 90 degree curves: one at First Avenue and 41st Street and the other at Second Avenue & 41st Street; as well as the 1994 rebuilt Bush Junction turnout (#1, the junction of the red & black striped / orange and yellow line segments in diagram below).

   This new construction also allowed for the installation of conventional dual point turnouts as those normally used for heavy freight railroad service (as opposed to the lightweight single point tongue & mate switch for streetcars.)


2012 - present: South Brooklyn Railway / New York New Jersey Rail Interchange
and  South Brooklyn Marine Terminal track layout.
diagram by author

.

.

   This new interchange remains in service as of 2026. 

   Contrary to erroneous statements and assumptions made in railfan groups on social media, and with utmost thanks to my access to internal sources within the MTA, the delineation line of the South Brooklyn Railroad and New York New Jersey Rail is established at the Second Avenue crossing at 39th Street, in which the legal documents states: 

"WHEREAS, the 2nd Avenue Grade Crossing at 39th Street is the point of delineation between NYNJR rail territory and operations and SBK Rail territory and operations, and;

WHEREAS, the Parties desire to establish an interchange agreement, to formalize and accurately reflect how interchange traffic emanating from both Parties' facilities will be handled, with the primary interchange activity to be NYNJR delivering rail cars to the SBK Connection Track (as hereinafter defined); and

WHEREAS, the parties are willing to enter into this Agreement on the terms and conditions provided herein for so long as the Parties tender rail cars to each other..."


   Therefore, it is now clear and simple: west of Second Avenue crossing is NYNJ Rail, east of the crossing is South Brooklyn Railway. Not Third Avenue, not the Bush Terminal Yard, and not 65th Street Yard. Precisely where it is shown on the map below.


2012 - present: South Brooklyn Railway / New York New Jersey Rail Delineation Point
North is to the right.
annotated map by author
not to be reused or reproduced without consent.

added 18 April 2021

.

.


3)  Third Avenue Yard & freight house, Team Tracks, "Paramount Station", Davidson Pipe Yard - SBK Offices

.  

   It is worth noting the prior to the freight house and yard. 

   Traveling east from Second Avenue and Bush Junction, the tracks ran through a two block parcel bordered by 39th and 37th Streets, Second and Third Avenues.

   The following scan states the location of the South Brooklyn Railway to be at 370 Jay Street, (which is the Headquarters of the New York City Transit Authority) the other address shown is 990 Third Avenue. 

   Research shows this 990 Third Avenue location to be the address of the freight house and yard..

   In the years prior to circa 1959; this was another modestly sized railyard of the South Brooklyn Railway and was the location of their freight house. Aerial photos located in the 2026 in the New York Municipal Archive, show the yard in great detail. 


South Brooklyn Railway - Third Avenue Yard Front Gate - unknown date
W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.9.1273
added 21 September 2026

.

.


South Brooklyn Railway - 39th Street Yards between bulkhead and Third Avenue - January 16, 1931
Facing north.
New York Municipal Archives - Image ID: REC 0028 20 14 1674-1
Department of Records and Information Services (DORIS)
annotated image - © 2026 by author

.

.


South Brooklyn Railway - freight house between Third Avenue (foreground) - 1939
after being converted to bus garage. Facing southwest.
W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.9.568
added 21 September 2026

.

.


South Brooklyn Railway - Freight yard between Third Avenue Bus Yard (foreground) and Second Avenue - 1939
Paramount Station & team tracks on left. Facing west.
W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.9.56
added 21 September 2026

.

.


#9980 shoving next to the freight house. The cornerstone of the freight house reads 1888.
D. Klepper photo
added 21 September 2026

.

.


South Brooklyn Railway Yard - 1958
Looking west from Third Avenue at "Davidson Pipe Yard" between 39th & 38th Streets and Third & Second Avenues.
unknown photographer
added 31 October 2022

.

.


Third Avenue Yard, after the freight house has been demolished. - unknown date (but post 1959, as Davidson Pipe appears to be on premises.
#9980, cranes #9006, #9007
D. Klepper photo
added 22 September 2026

.

.

   According to Peter Davidson, this location was briefly the site of a brickyard, prior to Davidson Pipe moving here. After the freight house and team trackage was removed, Davidson Pipe would occupy the entire location, and the location was known simply as the "Davidson Pipe Yard". Tall stacks of pipe of many types and varieties were stored in this yard for commercial resale. 

   Eventually, Davidson Pipe purchased the property from the City of New York.

   Davidson Pipe was a large and very significant customer for the South Brooklyn Railway and countless gondolas were brought in by the South Brooklyn Railway for unloading here. Davidson Pipe would also be South Brooklyn Railway's last "non-Transit Authority" customer. 

   It appears that the piles of pipe was simply stacked on the trackage, rendering it out of service. 

   However several tracks would remain unblocked for railroad use: the northern track, effectively made a dead end siding by a pile of pipe (the track continued under this pile to a 90 degree street crossing on Second Avenue); a middle "through track" that ran straight through the yard; and the southern "runaround track", but also a through track. A siding to the south, may or may not have been in use at the end of this yards life.

   With the trackage located within a heavy industrial yard, engaged in the receipt and sales of large diameter steel pipe (which obviously were quite heavy), the tracks in this yard were subject to intense abuse. Trucks, truck cranes, forklifts operating during business hours, which required crossing the various running tracks and stub sidings hundreds of times a day undoubtedly took a toll on the track condition. 

   As one can compare the various images taken over the year, one can see the degradation of the conditions happen visually.  

   In consideration of this, the Davidson Pipe yard was one place where the track could not be regularly maintained, unless their business was disturbed, like at the First / Second Avenue Yard to the west or the Unloading Yard to the east, and where the SBK / NYCTA could maintain the track regularly. Replacing a track or even a switch in the Davidson Pipe Yard, required mounds of pipe to be relocated, and would block used of their trucks and cranes. 

   As track speeds were slow, this really wasn't too much of a factor on going through the yard, but eventually that track reached a state of dilapidation, that if SBK operations were to continue, it would have to be reconstructed, which could be read in the condition report.  

   Fortunately for the SBK, Davidson sold their property to Costco in 1994, and it understood (but not confirmed) that Costco paid to have line relocated to the south edge of the property the following year..


Davidson Pipe Yard: ca. 1960 - 1994

.

.


 Davidson Pipe unloading Erie Lackawanna gondola #43599 on a rainy day.
Looking west in First Avenue Yard, Bush Terminal buildings 26 and 24 background left behind crane, Mitsui piershed in background right.
W. Schneider photo
J. McCluskey collection

added 07 November 2016

.

.

   On 28 December 2009, I contacted Mr. Peter Davidson, of Davidson Pipe; which is still located in the Sunset Park area of Brooklyn. Mr. Davidson was gracious enough to take some time out of his busy schedule to answer a few questions regarding their occupancy of the property at 39th Street & Third Avenue:
.

   Mr. Davidson might have some images of the Davidson Pipe Yard operation, but needs some time to locate them, so stay tuned for further updates.   

   In 1994, Davidson Pipe closed this yard. Again, they were the last non-NYCTA customer for the South Brooklyn Railway. 

   The property was subsequently sold to Costco (the wholesale membership club), and due to their construction plans, the South Brooklyn Railway right of way would have to be relocated from the middle of the property to the extreme southern edge


Costco: 1994 - present



   Exiting east out of the Davidson Pipe Yard (and now Costco), the tracks would cross Third Avenue. 

   Prior to the construction of the Gowanus Expressway, the tracks crossed Third Avenue, which was a "simple" two way avenue. When the Gowanus Expressway (elevated) was constructed in the 1940's, Third Avenue would be widened to accommodate the elevated superhighway, and this became a "major" crossing, with tracks now having to cross 3 lanes of southbound traffic, a wide island in the middle, (in which the supports for the Gowanus Expressway are located) and then three lanes of northbound traffic.

   Because of the infrequency of activity, this crossing was manually flagged (no automatic flashing lights or crossing arms.) Oddly, this crossing remains manually flagged into the current era of operations.

.

.


4)  38th Street between Third & Fourth Avenue Yard - "Unloading Yard" a/k/a "Public Tracks"

.

   East of the Third Avenue crossing would be another small yard. Through all the images of this yard to date, this yard appears to have been lightly used throughout its history.

   However, the early history of this location may have been an industrial siding before being a yard. According  to "The Elevated Railways of Brooklyn and the BMT Subway, Volume 1, p. 67" (Eric Oszustowicz, ERA 2022)  is the following:

   "Armour Packing built a distribution plant with a private siding at 38th Street and Third Avenue 

   

   The earliest visual references I can find showing a railroad siding in or at this location, is 1906 G. W. Bromley Property Atlas - Plate 33 shown highlighted in yellow below. Whether this was Armour Packing remains to be confirmed; which was a few moments later by referencing the 1903-1907 edition of the E. Belcher Hyde Property Atlas - Plate 33 (coincidentally!)  The location os clearly marked Armour Packing.


G. W. Bromley Property Atlas - 1908 Edition, Brooklyn Volume 1 - Plate 33
New York Public Library Digital Collection


E. Belcher Hyde Property Atlas - 1903-1907 Edition, Brooklyn Volume 1 - Plate 31 & 33 stitched by author
New York Public Library Digital Collection

   Quite obviously, we know the property underwent changes over the next few decades., especially when Third Avenue was widened

   Upon the demolition of the Bay Ridge / Fifth Avenue elevated commencing September 15, 1941 and the construction of the Gowanus Expressway, an off ramp was needed. The yard would be reconfigured (narrowed) to accommodate this. These two images below shows the yard before said reconfiguration.

.
38th Street Yard - "Unloading Yard"- 1935
Looking east from Third Avenue, with the Bay Ridge - Fifth Avenue Shuttle elevated on left.
Note the subway train through the overpass and about to turn north up the Fourth Avenue Line over 38th Street.
William J. Rugen photo
image courtesy of Queens Public Library Digital Archives
color corrected by author

added 21 May 2019

.

.

.
South Brooklyn Railway "38th Street Yard" a/k/a "Public Tracks Yard" - 1940
Looking west from Fourth Avenue overpass, with the Bay Ridge - Fifth Avenue Shuttle elevated over 38th Street.
The South Brooklyn Railway freight house with peaked roof can be discerned through the girder supports at the far end of the yard.
unknown photographer (possibly a William J. Rugen photo)
courtesy of New York Historical Society archives

added 31 October 2022

.

.


SBK #9 in 38th Street Yard - "Unloading Yard"- ca. 1944
Looking west from midyard. The Fifth Avenue Elevated has been demolished, and the Gowanus Expressway is built, however the 38th Street off ramp has not been completed.
D. Klepper photo

added 22 September 2026

.

.

.

.
South Brooklyn Railway "38th Street Yard" - Fourth Avenue overpass - ca. 1948
Looking east.
D. Klepper photo
added 22 September 2026

..

.

.
South Brooklyn Railway "38th Street Yard" - Fourth Avenue overpass - July 31, 1954
Looking east.
W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.11.71
added 21 September 2026

.

   In the map contained in Operations Manual, this yard is listed as "3rd Avenue Public Tracks"; and was used for public unloading of freight from railway car to truck, also known as team tracks.

   At this location in later years, a ramp built of railroad ties with steel rectangular structural tubing laid upon it and kept in gauge by welded cross braces. This ramp was used to load / unload subway cars that were transported on top of flat cars. Hence the location gaining it's colloquial name "the Unloading Yard." 

   With thanks to Dave Pirmann, I was finally able to secure images of this ramp in use, and these photos may be seen in the N1 / N2 section on Locomotive Photos page.


Looking west from Fourth Avenue overpass - 1988
courtesy of D. Pirmann - nycsubway.com

.

   At the east end of this yard, the right of way begins to run subgrade under Fourth Avenue (actually the land contour rises). This tunnel entrance can be seen by the chain link gates and interlocking signals in the photo below. The South Brooklyn Railway enters the former Brooklyn Manhattan Transit "BMT" West End line (current NYCTA & subway lines) at this point.

   From this point, it runs for about half a block in open subgrade, and then enters a tunnel until Seventh Avenue. Due to the restrictive nature of the subway tunnels encountered to Seventh Avenue; no freight cars with a red "no clearance" tag can proceeded east of this yard.

   After the last of the non-NYCTA customers ceased receiving service from the SBK, only subway cars and subway track maintenance equipment would use this yard.

   

.



.

   
South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - April 13, 2008
looking southeast, showing the subway car unloading ramp.
Fourth Ave and interchange with subway interchange in background.
P. F. Strubeck photo

added 16 Dec 2009

..

.


Close up of unloading ramp. Yes, this is what the New York City Transit Authority used
to unload subway cars that were transported on top of flatcars.

P. F. Strubeck photo
added 16 Dec 2009

.

.


South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - January 26, 2010
Looking east toward Fourth Avenue and subway interchange with subway car unloading ramp.
P. M. Goldstein photo

added 03 May 2012

.

.


South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - January 26, 2010

Looking west toward Third Avenue grade crossing and CostCo parking lot (under Gowanus Expressway).
P. M. Goldstein photo
added 03 May 2012

.

.

   As of late April 2012, this yard has been cleaned up of rubbish. The original subway car unloading ramp seen in the above images has been removed, it was replaced with a new heavier constructed unloading ramp, for the new NYCTA work locomotives that were scheduled to arrive.


South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - May 1, 2012
New signs on vehicle entrance gate.
J. McCluskey photo

added 03 May 2012

.

.


South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - May 1, 2012
J. McCluskey photo

added 03 May 2012

.

.


South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - May 1, 2012
Showing lack of unloading ramp.
J. McCluskey photo

added 03 May 2012

.

.

   The new ramp built at NYCTA Linden Shops, and brought to this location for the intended unloading of the R156 work locomotives. However, after the third locomotive arrived; the ramp was relocated to New York New Jersey Rail's Bush Terminal Yard, where it remained until the construction of the Car Inspection Shop.

.
South Brooklyn Railway "38th Street Yard" between Third and Fourth Avenues and 38th Street - May 12, 2012
Showing new unloading ramp recently relocated from Linden Shops for the unloading of R156 work locomotives.
J. McCluskey photo

added 12 May 2012

   This yard has been obliterated with the construction of the MTA's new Railcar Acceptance and Testing Facility.

.
MTA Railcar Acceptance & Testing Facility - May 4, 2026
Looking west from Fourth Avenue overpass. Facility was built on former "Unloading Yard".
J. McCluskey photo

.


5)  BMT Fourth Avenue Subway Portal & Interchange

.

   Beginning in 1914 with the construction of the BMT Fourth Avenue Subway to replace the Fifth Avenue Elevated; this would become the location of the south portals of the subway tunnels as well as the interchange where South Brooklyn Railway would enter upon signaled territory. 

   Once this was completed, from this point to the 36th Street Yard, South Brooklyn Railway movements would have to get clearance from the BMT dispatcher normalize the derails (these were not manual and were controlled by the tower) and unlock the switch and align for entrance into the signaled territory. Once this was complete, the signal changed to clear (green) and train movement could proceed, beginning the 1.72% climb towards Ninth Avenue.


Fourth Avenue overpass - 1914
Looking west prior to Fourth Avenue Line construction.
unknown photographer
unknown repository

added 09 September 2026

.


Fourth Avenue overpass - March 2, 1915
Looking east. Note bellmouths already erected.
unknown photographer
unknown repository

added 09 September 2026

.

.
.
Start of construction on subway tunnel portals at Fourth Avenue and 37th Street for BMT Fourth Avenue Line
Looking northwest. South Brooklyn Railway trackage straight through to left)
unknown photographer

added 31 October 2022

.

.
.

Construction of BMT Fourth Avenue Line at 37th Street and Fourth Avenue - June 16, 1915
Tunnel portals now completed, and excavation continues north.
South Brooklyn Railway trackage now jug-handles to left to continue west and to Third, Second and First Avenues.
unknown photographer

added 31 October 2022
.
.

.

.
Completion of BMT Fourth Avenue Line at 37th Street and Fourth Avenue - September 30, 1915
Looking east from upon South Brooklyn Railway tracks at unused tunnel bellmouths. BMT Fourth Avenue Line (two track portal) on left;
South Brooklyn Railway trackage (two tracks) merging into BMT track on right. 
At some point, the "Fifth Avenue Freight Tower" would be constructed in the triangular space at top right.
New York Historical Society archives
unknown photographer

added 31 October 2022


.

.


South Brooklyn Railway / BMT Fourth Avenue Line Junction at 37th Street and Fourth Avenue - 1940
Looking east at BMT Fourth Avenue Line (two tracks) on left; South Brooklyn Railway trackage (two tracks) merging into BMT track on right.
New York Historical Society archives
unknown photographer

added 31 October 2022

.


.


6)  BMT 36th-38th Street BMT Yard (west portion) - SBK 37th Street Yard (east portion) "Materials Yard" & "Tenth Avenue Yard"

   Exiting eastbound from the tunnel from Fifth Avenue, the tracks open up into the combined "36th-38th Street Yard" of the New York City Transit Authority (NYCTA) and former Brooklyn Manhattan Transit "BMT". This facility is the present day MTA 38th Street Train Yard & Facility.

   This is a rather decent sized railyard, but nowhere on the magnitude of say; the Coney Island Yard & Shops Complex. The perimeter of the yard is bordered by 36th and 37th Streets on the north, 39th Street on the south, Fifth Avenue to the west and New Utrecht Avenue on the east, with the BMT West End line running along the southern border of the yard.

   Prior to the formation of the NYCTA in 1953, the BMT yard and the South Brooklyn Railway Yard were considered two separate facilities. The yellow outline on the map below reflects the demarcation of two of the three yards. The northwest portion (left side of map - arrows) used to house BMT trains on the off hours, with the southeast portion (outlined) dedicated to South Brooklyn Railway operations, freight car storage, construction materials, et al.

   The portion of the yard to the right but still in the outline is known as the "Tenth Avenue Yard."


This map shows the three yards of the area, but specifically highlights the "Materials Yard" (between Seventh and Ninth Avenues and
the "Tenth Avenue Yard" between Ninth Avenue and Fort Hamilton Parkway used by the South Brooklyn Railway.
.
.

   There has always been a question whether the two yards were actually considered separate.

   The following undated image (ca. 1948-1965); while interesting from any railfans point of view, answers the question. It clearly shows the Yard Limit sign by the diamond in the middle of the two yards. While personally I always maintained it was two separate yards the presence of the sign is no surprise. What I am especially intrigued over, is the "Third Ave" on the sign. Confimed by documents is that the South Brooklyn Railway was governed by yard limits to Third Avenue from this point.

   Was the operations west of this yard limit sign under the control of a different dispatcher or control tower or something other? This will need to be answered.

   Ironically, this level crossing still exists in the present day.

Looking southeast at the "diamond" at 36th Street Yards. SBK 36th Street Yard to left, BMT 36th Street Yard to right.
Ramps down to Coney Island bound and Manhattan bound local tracks of West End Line at top left corner.
zoom and crop of sign: YARD LIMIT
                                   THIRD AVE


   Sometime around 1953 or shortly after, off hours BMT Division subway car storage was relocated to Coney Island
Yards. In viewing the 1961 Raudenbush Map (see above) the separation between the BMT 36th Street Yard and the South Brooklyn Railway's 36th Street Yard is still noticeable and remains so to this very day.

   Following the cessation of freight service on the South Brooklyn Railway,
and the subsequent reconstruction of the 36th Street Yard; this demarcation line was no longer required; and the 36th Street Facility became one combined yard. This facility was re-purposed to store work equipment and trains, as well as house the track maintenance department to include materials storage and supplies such as: ties, rails, track components & fasteners, panel track assembly, etc. New structures house in various locations for different departments (track, signals, etc). However, subway car repair or maintenance no longer takes place at this location and has not since 1944. The large building at Fifth Avenue between 36th and 38th Street which was originally a train depot, became an elevated car inspection shop through 1944, then was converted to the Fifth Avenue Bus Depot, which in turn was renamed the Jackie Gleason Bus Depot in 1988.

   Due to the topography of Brooklyn, this yard and facility is mostly subgrade, with a second level above it at the northwest end at Fifth Avenue and gradually becomes street level at the southeast end at Tenth Avenue. 

   Returning to the operations of the South Brooklyn Railway, it employed the use of the overhead trolley wire throughout their yard and several tracks of the BMT yard.; Several (not all) of its locomotives were also equipped with third rail pick-ups (over-riding type) for use on the BMT trackage that is also served by the 36th Street Yard. The change to diesel locomotives made trolley wire electrical pick up superfluous. 

.

.


7)  South Brooklyn Railway 36th Street (center portion - between Ninth and Seventh Avenues) - "Materials Yard"

.

   This area was used for the storage of track components and right of way maintenance supplies: rail, ties, timbers, kegs of spikes and rail anchors, and piles of tie plates, wood planking for the subway platforms and other parts of rail infrastructure necessary to maintaining the subway tracks.


South Brooklyn Railway - 36th Street Yard (east area - between Ninth and Eighth Avenues) - unknown date
Taken from the Ninth Avenue overpass, looking northwest.
unknown photographer
authors collection

added 20 July 2018

.

.


South Brooklyn Railway Materials Yard (west area - between Seventh and Eighth Avenues) - unknown date
Taken from 37th Street retaining wall at Seventh Avenue, looking west. Take note of the early wood sheathed and outside braced wood boxcars between later steel boxcars, 
and a flat car of lumber undoubtedly on its way to one of the building material suppliers located along th 37th Street right of way: Klein's Building Materials, Culver Lumber, et al.
In the background, the Brooklyn Manhattan Transit 36-38th Street Yard can be seen.
unknown photographer
authors collection

added 20 July 2018

.

.


"Materials Yard" at Ninth Avenue (east area) - November 15, 1962
Looking northwest. NYCTA 20005 (#8) and SBK #4.
unknown photographer
D. Pirmann collection / nycsubway.com archives
added 21 September 2026

.

.


"Materials Yard" at Ninth Avenue (east area) - November 15, 1962
Looking north from yard driveway entrance at NYCTA 20005 (#8).
unknown photographer
D. Pirmann collection / nycsubway.com archives
added 21 September 2026

.

.

South Brooklyn Railway 36th Street (eastern portion - between Fort Hamilton Parkway and Ninth Avenue) - "Tenth Avenue Yard"

   The following image is circa 1940, and is looking west towards the South Brooklyn Railway Tenth Avenue Yard and the Ninth Avenue overpass, from atop the ramp that connected the BMT Culver Line (lower level) to the BMT West End Line (upper level) at Ninth Avenue Station. Towards the bottom of the images, the South Brooklyn Railway tracks can be seen disappearing under the Culver el and both would follow the same route to McDonald Avenue.


Culver Elevated ramp - ca. 1940
Looking northwest. Note the gradual rise in terrain looking west and the yard becoming subgrade.
South Brooklyn Railway tracks at street level and enter under the elevated at this point. The Ninth Avenue overpass can be seen directly under the signal head.

added 18 April 2021

...

.


South Brooklyn Railway "Tenth Avenue Yard"  - July 31, 1954
Looking west. Train is about to enter 37th Street right of way (on right side of trees). 
Foot of ramp up to Culver Elevated out of view to left.

W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.11.66
added 21 September 2026 .

.

.


8)  37th Street & Ninth Avenue Delivery Station

.

   According to the book "Brooklyn - A National Center of Commerce & Industry", published by the Committee on Industrial Advancement of the Brooklyn League in 1914; in the chapter "Freight Depots, Piers & Stores" on page 42, lists this location for deliveries of freight on the South Brooklyn Railway. 

   Referencing the 1916 series of E. Belcher Hyde Property Maps, no discernible structure seems to be present at 37th and Ninth Avenue that would represent a freight station as there is at 37th Street and Thirteenth Avenue. As the east end of the 36th Street Yard facility falls at 9th Avenue, perhaps at one point something was here but specifics elude us.

   Referencing 1924 Fairchild Aerial Survey Photograph and shows a structure between the tunnel portals for the Culver Line and 37th Street with two stub tracks. This might be the delivery station being referenced. By the time the 1951 Aerial Photo was taken some of those structure are gone with most of this particular area open.  

   Judging from the 1961 Raudenbush Map, it appears these two sidings are what the earlier publication is referring to.

   By the next aerial photograph available to us to examine (dated 1996) the NYCTA has constructed a long slightly curved building on this land utilizing those two stub tracks. This is an unloading platform for trash / rubbish collection in the subways.

   This is where the original South Brooklyn Railway trackage returned to street level. After the elevateds were built; the South Brooklyn Railway would retain its right of way at street level. The BMT "Culver Shuttle" would have its transition incline to its elevated at this location. It should be noted from this location, the BMT "Culver Shuttle" line followed the same route as the South Brooklyn Railway, albeit on an elevated structure. The Culver Shuttle last ran on May 10, 1975, with South Brooklyn abandoning their street running February 1, 1978. The elevated structure and the SBK tracks underneath stood until demolition of the elevated began in August 1985.

   Continuing east out of the yard at street level however, South Brooklyn Railway trackage paralleled 37th Street for about three quarters of a mile to Dahill Road; and it is this route that we shall continue.


9)  37th Street & Thirteenth Ave Delivery Station and the Greenwood Industrial Sidings

8 Ninth Avenue Delivery Station 9E S. Klein Inc. building materials, Dependable Sales 9J Phoenix Hermetic
9A Berkshire Steel, then Roberts Foods 9F American Transparent Plastic "Stone" 9K 37th Street Team Track, cut back ca. 1950
9B Prospect Coal Yard, vacated, track removed date? 9G Cirillo Brothers Coal & Ice 9L Bay Ridge  / Knickerbocker Coal  / "Anchor"
9C unknown occupant 9H Thirteenth Avenue freight house, removed ca. 1929? 9M Flatbush Industrial Building Corp, later Kamco
9D unknown occupant, track removed? 9 I Cirillo Brothers 9N Fisher's Siding / Culver Lumber - out ca. 1945?


   The 1960 ERA and 1961 Raudenbush track maps shows several sidings in close proximity to one another in this general area, to both the south and the north of the right of way.

   For clarity, we will address the property in order from west to east (Ninth Avenue to Fifteenth Avenue) with oldest map on top for a given area. Due to the different map plates, and having been stitched together for display, some images below overlap. Also, attempts has been made to scale the maps to one another, but this is not always the case. Please exercise caution when reviewing. 

   I also became aware of a discrepancy in the street grid in the Raudenbush Map. It shows the alignment of 37th Street to jog north between Old New Utrecht Avenue and Fifteenth Avenue. This was not the case, and 37th Street is straight without any jog, as evidenced by the 1906, 1916 and 1929 E. Belcher Hyde Property Maps as do the 1924 Fairchild Aerial and 1951 Aerial Photos. 

   While I will on occasion and quite frequently question track and siding layout on the property maps, I rarely question the street grid and I certainly won't dispute actual images. Needless to say, the 37th Street curbline of block 5349 remained in line with the blocks to the east (5368) and west (5301). So I have corrected the applicable segment of the Raudenbush Map below to reflect this. 

   

   Contained within "The Elevated Railways of Brooklyn and the BMT Subway, Volume 1, p. 67" (Eric Oszustowicz, ERA 2022)  is the following:

   "As soon as the BHRR started handling the Culver Line freight in 1905, General Freight Agent C. R. Van Etten of the BHRR made arrangements to expand the freight operation. The Nassau Electric's old yard at 37th Street and 13th Avenue was utilized and a freight siding was installed as soon as tenants were obtained from the adjacent buildings. 

Sixteen companies installed private freight sidings  on the portion of the Culver Line between 10th Avenue and 14th Avenues. At the head of of the 38th Street Cut near Greenwood cemetery, a siding was installed for delivery of stone used in the erection of mausoleums."


.

.

Ninth Avenue to Fort Hamilton Parkway

.

   From west to east, the first siding encountered in the 1906 E. Belcher Hyde Property Map was between Ninth Avenue and Fort Hamilton Parkway on the southern side of the right of way. This siding is for the coal yard (Lot 57).  


E. Belcher Hyde Property Map - 1906
Volume 6, Plate 1, Volume 5, Plate 30
courtesy of New York Public Library Digital Archives
stitched version ©2018 by author

.

.

   This same siding is also encountered in 1916 edition of the E. Belcher Hyde Property Map. If there is any degree of accuracy for the trackage shown in the property maps (and I almost always doubt it) the siding appears to be lengthened west to mid block to the Lot 74 property line.


E. Belcher Hyde Property Map - 1916
Volume 2, Plate 12
courtesy of New York Public Library Digital Archives
annotated version ©2018 by author

.

.

   By 1929, the adjoining property west of  the Prospect Coal Yard (Lot 57) was built up and is now shown to be occupied by Berkshire Structural Steel (Lot 67). It is not confirmed that South Brooklyn Railway actually delivered to them; but they were located on the siding, and it is almost certain they did. Note the shape of that building. That building, propertyy would become home to Roberts Foods.

   The siding is not shown, but believed to be hidden under the Culver Line elevated which opened to service on March 1919, and now shown on the map.

   We also see that a pair of sidings now joins the street trackage west of Tenth Avenue (Block 5581 - Lot 153-4) with a hoist house at the end of the northern siding.


E. Belcher Hyde Property Map - 1929
Volume 3, Plate 57
courtesy of Historic Map Works
annotated version ©2018 by author

.

.

9A - Roberts Foods Siding

.

   Roberts Foods siding was the first customer siding east of the "Tenth Avenue Yard" and on the 37th Street right of way going east. 

   The name of the business(es) prior to Roberts was Berkshire Steel; but as Roberts is known throughout the later documents, I feel it better to use the name others recognize. 

   Until these photos below were obtained, it could not be appreciated what tight confines the siding was located at. The Culver El at this location was already sloping down to meet the concrete ramp, and was barely elevated enough in height to get a boxcar under it, but it was enough. That is where the business was, so that is where the siding was. 

   A standard height 40' boxcar was 13' (Plate B) and 50' box car was 15' 6" (Plate C). Even then, such cars couldn't make it through the tunnel to get to this location, so the thought is moot.

   And because of that location, the siding turned 90 degrees into the building in a short length. This explains why the SBK Operations Manual states

"Roberts Food - In between 10th Avenue Yard and Fort Hamilton Parkwayway (sic). Roberts Foods contracts for tank cars. Due to sharp curve, normal hitches are difficult to make. A special adapter is stored to the left of the entrance in order to facilitate making
hitches."

   Looking at the first image below, one can see by the trolley wire trough mounted to underside of elevated, and by partially buried rails in dirt; there was in fact another track that crossed at a diamond here.

   It is this track, that is now believed to have connected through to the stub siding at Twelfth Avenue (purple track in map above right), and when it was in place, it serviced Prospect Coal (shown in red in map above right), but the tracks appears to have been removed sometime before 1950 as it's obviously disconnected by the date of the image;  and the 1960's era maps do not reflect this tracks presence.

.
South Brooklyn Railway - 37th Street right of way - July 3, 1954
Looking west, train is spotting cars on the Roberts Foods siding. Very sharp curve and tight squeeze 
as the Culver Elevated abutment ramp is in close proximity.

W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.11.68
added 21 September 2026

.

.


South Brooklyn Railway - 37th Street right of way - July 3, 1954
Looking west, train is spotting cars on the very sharp curve to Roberts Foods siding. Culver Elevated abutment ramp is in close proximity.
W. H. Lundin photo
New York Transit Authority archives - Image ID: 2004.20.11.64
added 21 September 2026

..


Berkshire Structural Steel - 1032 38th Street - ca. 1939-1940
To become Roberts Foods.
New York Municipal Archives Tax Photos
added 24 September 2026

..

9B - Propect Coal

.

9C - unknown occupant  &  9D unknown occupant

.

   These images were taken as part of the hauling the ART refrigerated boxcar to the 37th Street Team Track, taken by D. Klepper; of which can be seen farther below. 

   However, the image below left shows an unused siding leading into vacant lot, behind the wood slat fence. The occupant (or former occupant is unknown at this time.


Looking northwest between Twelfth Avenue and Fort Hamilton Parkway - ca. 1945
SBK #5 heading southeast on southbound running track under Culver Line (shuttle) elevated.
D. Klepper photo
added 10 July 2026

Looking northwest. Flagging the crossing at Thirteenth Avenue - ca. 1945
Intersection with Church Avenue trolley line - diamonds visible

SBK #5 heading southeast with ART boxcar crossing Thirteenth Avenue.
D. Klepper photo
added 10 July 2026

Fort Hamilton Parkway toThirteenth Avenue

.
   Resuming at Fort Hamilton Parkway, the 1929 Belcher Hyde Property Map shows the running tracks continue without any note of sidings. But the orientation of east-west building (Block 5291 - no lot number shown  one story (looks like an exclamation point between the numerals 5 and 2) and the large spaces to either side, leads me to believe it may have had rail service. A siding is shown here in the 1960 Raudenbush Map. 

   The next block to the east, S. Klein Building Materials (Block 5295, Lot 60) is next. 


E. Belcher Hyde Property Map - 1929
Volume 3, Plate 58
courtesy of Historic Map Works
annotated version ©2018 by author

.

9F - American Transparent Plastics

.


American Transparent Plastic  and Cirillo Bros. Ice & Coal  - ca. 1950
Looking southeast on 37th Street Right Of Way between Twelfth (behind photgrapher) and Thirteenth Avenues
unknown photographer

added 01 November 2022

.

   I cannot remember the source for these following images; so please contact me if they are yours so they can be attributed. They appear to be out of a book or magazine.

   In this image above, we are witness to SBK #4 moving an outside brace wood boxcar on the southbound running track. The turnout to American Transparent Plastics Inc and their brick building can be seen to the right of the locomotive.

   S. Klein Inc. was confirmed to have a siding and accompanying rail service, despite not being shown in the 1929 E. Belcher Hyde map above, hence the angled buildings and alleyway through to 38th Street. Klein is also listed as being a coal dealer as well.

   It is not known if the Cirillo Brothers coal silos were once Klein's; or Klein's had a separate coal yard or silos. 


9G - Cirillo Brothers Coal

.

   Cirillo Brothers Coal Silos can be seen over the locomotive in the image above

   If one looks carefully enough, a coal hopper and a boxcar can be seen on the left edge of image, above the brakeman's shoulder and head.

   Cirillo Brothers made the transition from coal to fuel oil, when coal fell out of favor in the Metropolitan Area as a heating fuel. Their truck garage remained at the same location long after South Brooklyn Railway service ending in 1978; and it is in front of this truck garage that the Bocce games were played in the right of way.

9H - Thirteenth Avenue Freight Depot

.


E. Belcher Hyde Property Map - 1916
Volume 5, Plate 29 
courtesy of New York Public Library Digital Collections
annotated version ©2018 by author

added 30 June 2018

.

   According to the book "Brooklyn - A National Center of Commerce & Industry", published by the Committee on Industrial Advancement of the Brooklyn League in 1914; in the chapter "Freight Depots, Piers & Stores" on page 42, lists the location of 37th Street & Thirteenth Avenue for deliveries of freight on the South Brooklyn Railway. 

   While not shown on either the ERA map of 1960 or the Raudenbush Map in 1961, there was in fact a freight station located in Block 5301 (bound by 37th and 36th Streets and Thirteen and Old New Utrecht Avenue Avenues. 

   This structure is shown on both 1906 and the 1916 E. Belcher Hyde Property Maps with trackage to the building. Note that there a connection for the Church Avenue trolley line to the South Brooklyn Railway trackage as well, which is not surprising given the knowledge of the early SBK streetcar delivery network.

   From Eric Oszustowicz's books on the BMT; Vol 1, p. 67, is was learned that this facility was originally a freight depot of the Nassau Electric Railroad, which of course makes perfect sense being connected to the trolley network:

 "As soon as the BHRR started handling the Culver Line freight in 1905, General Freight Agent C. R. Van Etten of the BHRR made arrangements to expand the freight operation. The Nassau Electric's old yard at 37th Street and 13th Avenue was utilized and a freight siding was installed as soon as tenants were obtained from the adjacent buildings. 

  

   By the 1929 edition of the E. Belcher Hyde Property Map, Block 5301 (the SBK Freight Station) appears to be one large empty lot.

   Its connection to the Church Avenue trolley line is of interest and it is believed to have been closed when the SBK transitioned to a fixed route, and eliminated freight trolley service.

   Tax photographs in the New York Municipal Archives reveal the Knickerbocker Ice Company built a huge multi-story concrete ice house on this plot.

   In the photo at right, the lot identifier sign board is set up on northbound running track of the South Brooklyn Railway; and the Culver El, can be seen overhead in the top left corner.

   I have a sneaking suspicion, this location may have doubled as a carbarn for the Church Avenue Line, but again, I have nothing to confirm this.  

   What I do know, is Knickerbocker Ice Company built a huge multi-building structure, around 1935-1940 as can be seen in the Brooklyn Tax Photograph seen at right.

   There does not appear to be any rail service to this property any longer.

.


9K - 37th Street Team Track

.
.
   In these images, we witness SBK #5 delivering a boxcar; American Refrigerator Transit #26919 to the public team track for direct freight car to truck unloading. This team track was located on the south side of 37th Street between 14th and 15th Avenues. There is no curb line, so trucks could (and did!) back right up to the boxcar doors for unloading. 

   Not shown in the sequence of images, but at this point in its travel; #5 and its boxcar will travel down the southbound running track (in the images above) until it passes clear of the trailing point (in this direction of travel) of the running track crossover, located between Fourteenth and Fifteen Avenues.

   Then, after the points are set for the crossover, #5 will reverse direction and head northwest onto the northbound running until clear the crossover points.

   Here the points of the crossover will be "normalled" (set straight for the running track). #5 will then proceed southeast again on the northbound running track about a hundred feet past the trailing points (for this direction of travel) of the turnout for the 37th Street stub siding located between Fifteenth and Fourteenth Avenues.

   After coming to a stop, the points of the turnout will be set for the siding, and #5 will reverse direction once again, heading northwest; and push the boxcar into the siding and uncoupling from it..  

   Basically, the locomotive and car are performing a double switchback move to access to the 37th Street stub siding.

   In the diagram at right, blue denotes southeast travel, red denotes northwest (reversing move) travel.

.


Looking east from midblock between Fifteenth Avenue and Fourteenth Avenue - ca. 1945
SBK #5 and ART 26919 on the northbound running track at 37th Street stub siding between Fourteenth . 
Flatbush Industrial Corp Building behind.
D. Klepper photo
added 10 July 2026


Looking southeast towards Fifteenth Avenue - ca. 1945
SBK #5 and ART 26919 on the 37th Street stub siding between
Fourteenth and Fifteen Avenues.
D. Klepper photo
added 10 July 2026

.


Looking northwest along 37th Street at Fourteen Avenue - ca. 1945
SBK #5 and ART 26919 on the 37th Street team track.

Cassillo Brothers truck "Little Adorable" and crew waiting for SBK employee (?)
to open door of boxcar.
13th Avenue Station of Culver Shuttle overhead.

D. Klepper photo
added 10 July 2026

.

.


Looking due north at #5 in front of Flatbush Industrial Corp Building.
Note locomotive is on siding track, uncoupled from boxcar, 
with running tracks along bottom edge of image.

"Fireman" is pulling down trolley pole to switch to other pole
as trolley pole always trails in the direction of t
ravel
D. Klepper photo

added 10 July 2026

.



Looking northwest along 37th Street at Fourteen Avenue - ca. 1945
SBK #5 and ART 26919 on the 37th Street team track.

Cassillo Brothers truck "Little Adorable"
D. Klepper photo
added 10 July 2026

In this image below, a completely different boxcar: ART 17221 is being unloaded
from what appears to be the northbound running track. 

Author believes this location to be the northeast side of the Culver Line Elevated, just north of the Thirteenth Avenue Station, as the platform which is visible over the truck and as 37th Street appears off nose of truck.
D. Klepper photo
added 10 July 2026


.
   I vaguely recall as a child in the mid 1970's, my grandfather having business in the area and a boxcar standing in front of the Flatbush Industrial Corp. Building, in the middle of 37th Street. This memory stands out because I wondered in awe "how a boxcar got there and when the train would come to get it." 

.

Thirteenth Avenue to Fifteenth Avenue

.



E. Belcher Hyde Property Map - 1906
Volume 5, Plate 29
courtesy of New York Public Library Digital Archives
annotated version ©2018 by author.

.

.
   Block 5349 would become home to the Flatbush Industrial Building in 1922 and I have noted this in the 1916 Map below. Also, the factory (Block 5300 - Lot 45) would become Phoenix - Hermetic, which was engaged in the metal crafting trades. I have found references to them making items such as coated lithograph plate, metal covers and caps for glass jars, and other metal canning and closing items. Their siding is not shown in this map, but is shown in the 1929 edition.

      Of particular note is a track in center of 37th Street. It is believed that this track was a remnant from the lead to the Thirteenth Avenue Freight House (shown in the 1916 Property Map above) and was being used as a team track by the 1950's and connected to the northbound running track by a turnout by Fifteenth Avenue. See 1929 and see photos of ART car being spotted on 37th Street Team Track.


E. Belcher Hyde Property Map - 1916
Volume 5, Plate 29 
courtesy of New York Public Library Digital Archives
annotated version ©2018 by author

added 30 June 2018

.

.


State of New York Transit Commission -  First Annual Report
April 25, 1921 - December 31, 1921

added 05 July 2018

..

.


1929 E. Belcher Hyde Property Maps -
Volume 3 - Plates 58, 59, 60, 123
courtesy of New York Public Library Digital Archives
stitched version ©2018 by author

added 06 July 2018

.

.

   One the south side of 37th Street, Block 5300, Lot 48 was occupied by Phoenix Hermetic and their siding is shown along the north property line of the lot. Phoenix Hermetic was in the business of manufacturing caps for glass jars, canning and sealing as well as lacquering steel and tin plates for the lithograph industry among several related things. 

   One block to the east, Block 5348, it is unknown if either Anchor Corrugating Iron Works (Lot 54) received rail service. As they were in the business of manufacturing metal shed and buildings, it seems logical rolls of steel would arrive via rail, but this is unconfirmed.

9L - Knickerbocker Coal - Ice - Oil (formerly Bay Ridge Coal & Lumber)

.

   Conflicting data show the use of two different names for this property. It is not clear which came first.

   Bay Ridge Coal & Lumber (Block 5348 Lots 49 & 53) did receive rail service and is shown in the 1960 ERA as well as 1961 Raudenbush Maps. Research shows Bay Ridge Coal & Lumber was incorporated by January 1922 as reported in a coal trades newsletter.

   In the 1939-1940 Tax photos, this was the facility of Knickerbocker Coal  Ice & Oil.

   It should be noted that while not shown, an extended storage siding and runaround track to service and switch out the customers in the area extended for two blocks between Thirteenth and Fifteenth Avenues on the south side of 37th Street and was located between the Phoenix Siding and the running tracks.



The crew of SBK #4 climbs down to help clear the track turnouts of ice and snow in front of Bay Ridge Coal & Lumber.
on the 37th Street Right Of Way; looking west from Fifteenth Avenue and Fourteen Avenues.
unknown photographer

added 02 November 2022

..

.


Knickerbocker Coal Ice Oil Co.  - 1461 38th Street - ca. 1939-1940
Formerly Bay Ridge Coal.
New York Municipal Archives Tax Photos
added 24 September 2026

.

.


9M - Flatbush Industrial Building

.

   The Flatbush Industrial Corp. Building siding and "Fisher's Siding" occupied by Culver Lumber were both located on the northern side of 37th Street west of Fifteenth Avenue with the turnout for the Flatbush Industrial Building facing points west and the turnout for the Fischer Siding points facing points east. 

   Due to the confines of the property, the Fisher switch was encountered first going eastbound then the Flatbush Industrial Building switch and the tracks crossed each other on a diamond into the properties. This was a popular arrangement for rail service in tight confines. 

   While not shown, the siding for Flatbush Industrial in fact curved back west, crossed Lot 52 and ran through the open central corridor of the structure. By the 1961 Raudenbush Map, the Fisher Siding is shown as a broken line and thereby assumed to be out of service by that date.

   Research has revealed the the original occupant of the Flatbush Industrial Building was H. W. Cotton and his business was the fabrication and assembly of machinery such as lathes, mills and the like. 

   Found online is an agreement between the South Brooklyn Railway and H. W. Cotton dated September 24, 1920 for the SBK to construct and provide rail service to the building (see above).

   By the issue of the 1929 E. Belcher Hyde Property Map,  the Flatbush Industrial Building (Lot 68) is now shown along with Culver Lumber (Lot 42). Culver Lumber is listed as "Fisher's Siding" in the 1960 ERA Map. 

   Research shows a Charles Fisher at this location engaged in the paper & allied trades in a 1963 trade journal. 

   Learned from a Facebook post by a former employee that worked in the Flatbush Industrial Building, there were two sidings in the back alley. At the present, I have no confirmation of this.



Flatbush Industrial Building - 37th Street - ca. 1939-1941
New York Municipal Archives Tax Photos - BBL 3-5349-1
added 24 September 2026
.

.

   In the 1938-1940 Tax Photo above, since we are looking northwest, we can see the westbound running track under the elevated. Towards the bottom left corner, the curved lead for Flatbush Industrial Building (facing points traveling westbound) is clearly seen. If one looks carefully, on can make out the tracks at the feet of the gent waling by the panel truck with the doors open.

   Returning to the track under the elevated, about two inches up from the Flatbush Industrial Siding turnout, one can see the trailing point turnout for Fisher's Paper Products siding that runs behind the building. The turnout off this 37th Street siding is obscured by the mound of earth. The diamond in the street is unfortunately also obscured by the mound of earth in the foreground. One can also see the insulated trolley wire troughs sticking out from the elevated structure.

   Rail service to the Flatbush Industrial Building is believed to ceased with the abandonment of this portion of the line in February 1978. The Flatbush Industrial Building went on to be occupied by Kamco; and housed a food packaging company and other tenants when I visited it in 2008.

   Part of the central alley with rail siding has been paved over, and seen an expansion of the structure since original construction. This building was recently renovated and upon completion in 2017; it has become a mixed use business center called "Brooklyn Square".


.

   The track segment for the South Brooklyn Railway from Fort Hamilton Avenue to Thirteenth Avenue that parallels the south side of 37th Street has been pretty much obliterated, with residential townhouses having been built on what was once the right of way. 


.

.
New incoming R17's on the 37th Street right of way - 1955
37th Street, but unknown location. That is the Knickerbocker Ice building over the second and third cars, and that was located on Old New Utrecht Road;
which makes thisbetween Fourteenth and Fifteenth Avenues
A. J. Lonto / E. Watson collection
New York Transit Museum archives
Image ID: 2010.20.14.20.34
added 21 September 2026

.

.

9N - "Fisher's Siding" - Charles Fisher Paper Products, later Culver Lumber

   In the 1938-1940 Tax Photo below, since we are looking northwest, we can see the westbound running track under the elevated. Towards the bottom left corner, the curved lead for Flatbush Industrial Building (facing points traveling westbound) is clearly seen. If one looks carefully, on can make out the tracks at the feet of the gent waling by the panel truck with the doors open.

   Returning to the track under the elevated, about two inches up from the Flatbush Industrial Siding turnout, one can see the trailing point turnout for Fisher's Paper Products siding that runs behind the building. The turnout off this 37th Street siding is obscured by the mound of earth. The diamond in the street is unfortunately also obscured by the mound of earth in the foreground. One can also see the insulated trolley wire troughs sticking out from the elevated structure.
.

Flatbush Industrial Building and rear alley for Fisher's Siding - 37th Street - ca. 1939-1941
New York Municipal Archives Tax Photos - BBL 3-5349-1
added 24 September 2026
.

.


Charles Fisher Wholesale Paper Products - 37th Street and Fifteenth Avenue - ca. 1939-1941
New York Municipal Archives Tax Photos BBL 3-5349-41

added 24 September 2026

.

    Due to the confines of the property, and going eastbound (reverse move) on the westbound running track the Fisher switch was encountered first as facing point switch, then the Flatbush Industrial Building switch as a trailing point switch, and the tracks crossed each other on a diamond into the central open area seen between the buildings on left edge (see map)

    The revelation in this photo is the track bumper on the sidewalk that parallels 37th Street, and the roll up door at boxcar door height. So it appears this customer had not one, but sidings: one along the back of the building (paralleling Fifteenth Avenue, and the one on the sidewalk shown.

   By the 1961 Raudenbush Map, the Fisher Siding is shown as a broken line and thereby assumed to be out of service by that date.


10)  Kensington Junction

.

   Upon arriving at Dahill Road, the right of way begins to curve to the south, diagonally cutting the northeast corner of Cortelyou and Dahill Roads and the southeast corner of Cortelyou Road and McDonald Avenue, and finally entering the centerline of McDonald Avenue.

   This location was known as "Kensington Junction." 

   It was here that trains could be switched to the 37th Street routing, or streetcars could continue north up Gravesend Avenue (see #10 below to the trolley barn at Ninth Avenue and 20th Street.

   Prior to South Brooklyn Railway freight service, steam trains operated by the Prospect Park & Coney Island RR and the Long Island Railroad would turn south here to go to Coney Island, with special excursions to the Brooklyn Jockey Club,

   Please note that McDonald Avenue was originally known as Gravesend Avenue, and had been renamed in 1933.

   It is here at Kensington Junction, that the South Brooklyn Railway private right of way along 37th Street ended, and the tracks entered upon the public avenue for street running


South Brooklyn Railway / Brooklyn Rapid Transit - Kensington Junction - October 19, 1915
Looking north. South Brooklyn Railway right of way curving left in center of image to 37th Street, BRT (Prospect Park & Coney Island) trackage from center of image to right edge
lead north along Gravesend Avenue to 20th Street.
Taken prior to and presumably for the construction of the Culver Line elevated structure.
This photo is part of a large transit infrastructure survey series taken by the City of New York throughout the 1910's and 1920's.
I have heard rumors that most of the glass plate negatives in this series were found in dumpsters.
courtesy A. Huneke archives
added 05 July 2018


South Brooklyn Railway / Brooklyn Rapid Transit - Kensington Junction - ca. 1920
Looking south along Gravesend Avenue. South Brooklyn Railway right of way curving to right to 37th Street in center of image.
BRT (Prospect Park & Coney Island) trackage in center of image to behind photographer leads north along Gravesend Avenue to 20th Street.
Taken shortly after completion of construction of the Culver Line elevated structure.

added 03 November 2022


Kings Highway Lumber - McDonald Avenue & Cortelyou Road - Kensington Junction - ca. 1939-1941
Looking northwest.

New York Municipal Archives Tax Photos BBL 3-5384-17

added 24 September 2026


Kings Highway Lumber (behind Mobil gas station) - McDonald Avenue & Cortelyou Road - Kensington Junction - ca. 1939-1941
Looking southeast. The SBK running tracks are under the elevated structure on left edge. The turnout for Kings Highway Lumber is in front of the sedan.

New York Municipal Archives Tax Photos BBL 3-5384-17

added 24 September 2026
.

.


South Brooklyn Railway - Kensington Junction Tower - 1938-1941
Linder / Eppler article states this structure removed in 1920.
Perhaps an oroginal structure, as this is clearly in place in 1940.
Looking northwest at the front (east) and south (side) wall
New York Municipal Archives Tax Photos BBL 3-5384-17
added 24 September 2026


South Brooklyn Railway - Kensington Junction Tower - date?
Linder / Eppler article states this structure removed in 1920.
This appears to be an error.
Looking east at the back (west) wall and elevated over Gravesend Avenue.
courtesy of P. Matus

added 13 July 2010


The "new" Kensington Junction freight house! August 9, 1936
According to notes accompanying the image in the Queens Public Library; the body of BRT #222 (US Mail Trolley) was located at Kensington Junction for uses as a freight house.
William J. Rugen photo
image courtesy of Queens Public Library Digital Archives
color corrected by author

added 21 May 2019
.

.

The "new" Kensington Junction freight house! August 9, 1936
According to notes accompanying the image in the Queens Public Library; the body of BRT #222 (US Mail Trolley) was located at Kensington Junction for uses as a freight house.
William J. Rugen photo
image courtesy of Queens Public Library Digital Archives
color corrected by author

added 21 May 2019

.

.

   Also at this location, the BMT "Culver Shuttle" line elevated (now demolished) connected with and had its eastern terminus across the platform from the Independent Subway / IND "Sixth Avenue Line"  Line and also an elevated (which still exists).

   The South Brooklyn Railway (and Prospect Park & Coney Island RR) right of way would continue to run under this IND el in later years, which is now the NYCTA line. 

   In the early years and up to at least the mid-1950's, photographs show the tracks were not embedded in the street as we have come to expect, but in fact the trackage between intersections was typical rails on ties construction (and apparently covered in dirt) and the automobile traffic drove to the outsides of the elevated structure (where automobiles park in the present day). Presumably as railroad freight traffic decreased and automobile traffic increased, girder rail (rail with a built in flangeway made for street use, see Glossary) was laid and the right of way paved so it can be shared by train & automobile alike.


Gravesend Avenue - December 16, 1924
Looking south from Ditmas Avenue. Kensington Junction is half a block behind photographer.
Under the IND "Culver / Sixth Avenue" line.
E. E. Rutter photo
B. Merliss archives

added 29 December 2009

..

.


Gravesend Avenue - unknown date
Looking south - under the IND "Culver / Sixth Avenue" line.

added 29 December 2009

   Viewing the 1929 edition of the E. Belcher Hyde Property Map, there appears to have been two customers located at Kensington Junction, one confirmed, and the highly likely.


E. Belcher Hyde Map Co. Inc., 1929
Volume 3, Plate 134
North is left.
courtesy of Historic Map Works

added 11 July 2018

Electric Railroaders Association - June 1946, reissue 1950
North is up.
added 15 September 2026
.

.

   The first of these customers, is confirmed to have received rail traffic from the South Brooklyn Railway, and this customer is Kings Highway Lumber. Several maps reflect a siding in place. Research shows Kings Highway Lumber filed for bankruptcy in 1932. It may have been reorganized as Kingsway Lumber.

   Personally, I also recollect a building supply / lumber yard was located at this location throughout my years living in Brooklyn 1969-1998.

   The second of these customers appears to be more elusive. South Brooklyn Railway for service Rubel Coal & Ice (which had other locations throughout Brooklyn and Queens as well) has been difficult to ascertain. 

   The only reference I have encountered that Rubel might have had a railroad siding, is 1946 Streetcar Map of Brooklyn that was published by the ERA (Electric Railroaders Association) seen above right. This map distinctly shows a second siding parallel to the one for Kings Highway Lumber; but none of the "official" maps by South Brooklyn Railway, or period property atlases reflect the presence of a siding for Rubel Coal. 

   Ironically, the railroad may be long gone, but a brickyard and a small concrete mixing plant occupies this very same location in 2018. 

.

.


Kensington Junction - 1953
Looking north along McDonald Avenue (Gravesend Avenue) and under the IND "Culver Shuttle" (to left) and "Sixth Avenue" line (straight).
with South Brooklyn Railway tracks branching to left, former Prospect Park & Coney Island RR to right on surface.
Note "L MB letters under staircase. That is Kings Highway Lumber. Compare with 1915 photo above.
unknown photographer
A. Huneke archives

added 29 December 2009

.

.


11)  Ninth Avenue & 20th Street Depot

.

   A set of tracks also ran north from the Kensington Junction, up Gravesend Avenue (McDonald Avenue), turning northwest at 20th Street and ending at the Ninth Avenue & 20th Street Depot, which was the northern terminus of the Prospect Park & Coney Island RR.  

   The PP&CI was the passenger carrying railway that originally used this trackage, until Brooklyn Rapid Transit was organized.

   Within "The Elevated Railways of Brooklyn and the BMT Subway, Volume 1, p. 67" (Eric Oszustowicz, ERA 2022)  is the following:

   "Carload freight deliveries made at 9th Avenue and 20th street, which is the highest street elevation in Brooklyn at 175 feet above sea level, served the Maltine Co. and Ansonia Clock Co.."

  

   This was about 1910. These passenger carrying streetcars shared the trackage with the South Brooklyn Railway until 1958 when trolley service was discontinued. 

   The carbarns at Ninth Avenue and 20th Street would be demolished circa 1960 and the property developed into Bishop Ford High School. It is now a NYC Board of Education facility.  No traces remain.

   The August 27, 1915 issue of Railway Age Gazette (Volume 59, No. 9) lists this location as a freight station for the South Brooklyn Railway, and from the Eppler / Linder article we now know two customers received freight here: Ansonia Clock and Maltine, Co. but little more is known about this location. 

   Continuing south from Kensington Junction, the South Brooklyn Railway right of way heads almost due south towards Coney Island.

.

.


12)  Parkville Interchange:
South Brooklyn Railway with Long Island Railroad (1900 - 1968), Penn Central (1968 - 1976), Conrail (1976)

.
   At Gravesend (McDonald) Avenue and Avenue I,
 there was an interchange with the Bay Ridge Branch of the Long Island Rail Road.

   The Bay Ridge Branch was owned by the Long Island Rail Road, but by 1916; an arrangement was entered into with the New York, New Haven & Hartford RR to provide through train service from the newly constructed transfer bridges at the foot of the 65th Street - Bay Ridge Yard to the Bronx. However, LIRR performed the local switching between Bay Ridge and Fresh Pond; providing service to the many freight stations along the Bay Ridge Branch: 5th Avenue, New Utrecht Yard, Bath Junction, Parkville, Vanderveer, and many private sidings along the route: Rubel Coal, Brooklyn Ash Removal, just to name two.

   As the South Brooklyn Railway tracks running north/south were street trackage, as were the LIRR tracks running east/west, both crossed each other at grade. This photograph is courtesy of Bob Diamond:


South Brooklyn Railway / Prospect Park & Coney Island Railroad crossing with Long Island Rail Road - 1903
Parkville, Brooklyn, NY
Looking south (towards Coney Island) on Gravesend (now McDonald) Avenue at Parkville Interchange.
Long Island Bay Ridge Branch tracks crossing from left to right.
Note string of wood freight cars in right background - they are on LIRR / SBK interchange. Parkville Station on left.
R. Diamond archives

added 24 Dec 2009

.

.

   The Long Island Rail Road embarked on a grade crossing elimination project beginning in 1905. As part of this, the railroad excavated the Bay Ridge Branch and after 1906, the South Brooklyn Railway would now run over the subgrade LIRR & NYNH&H tracks:


South Brooklyn Railway / Prospect Park & Coney Island Railroad - 1906 - Parkville, Brooklyn, NY
Looking south (towards Coney Island) on Gravesend (now McDonald) Avenue at Parkville Junction.
Long Island Bay Ridge Branch now subgrade (out of view) evidenced by bridge wall on left of photo.
R. Diamond archives

added 24 Dec 2009

.

   The turnout for the interchange was south of this overpass at the "triangle" intersection of McDonald Ave (a/k/a Gravesend Avenue), Avenue I and 20th Avenue. This track connected the south and west legs of the interchange. (There was another leg connecting the south and east legs of this interchange but this was removed in 1917.)

   According to the State of New York Transit Commission of New York First Annual Report of 1921, the South Brooklyn Railway razed the Parkville Station (built in 1885, 2 1/2 story, 20' x 40' for the cost of $5,200.00.

   This location, according to Robert Emery maps of the Bay Ridge Branch courteously furnished by Steve Lynch, show the last remnants of a freight yard that existed until 1959. It was in the middle of the lead tracks for this yard that the South Brooklyn Railway would interchange at this location.

   It also appears that South Brooklyn Railway access to this location was limited to the southern most portion of the twin interchange leads, and that the South Brooklyn did not service this yard or adjacent industry spurs.


ca. 1920 - ca. 1959
R. Emery map
courtesy of S. Lynch
(modified by author and reoriented for north)

added 11 Dec 2009

.

.


LIRR / SBK Parkville Interchange - ca. 1948
Looking southeast at end of LIRR "side" of interchange.
Culver Line - Avenue I Station in background.

The taller of the two poles with large terminating insulators carry the LIRR / NYNH&H 11,000 volt AC current.

The lower of the two poles carries the NYCTS / BMT 600 volt DC current.
top sign reads:

END OF LIRR TROLLEY WIRE
LIRR LOCOMOTIVES
STOP HERE
smaller sign reads:
NOTICE
CARS MUST NOT BE
PLACED SO THAT THEY
SPAN ACROSS THE
INSULATED JOINTS
In the image, the subway cars are spanning the insulated joints.
D. Klepper photo

added 22 September 2026

.

.


Close up of the signage.
D. Klepper
added 22 September 2026

.

.


LIRR / SBK Parkville Interchange - ca. 1948
Looking northwest at end of SBK "side" of interchange.
LIRR freight house on right.

D. Klepper photo
added 22 September 2026

.

.


LIRR / SBK Parkville Interchange - ca. 1948
Looking northwest at end of SBK "side" of interchange.

The taller of the two poles with large terminating insulators carry the
LIRR / NYNH&H 11,000 volt AC current.

The lower of the two poles carries the NYCTS / BMT 600 volt DC current.
top sign reads:

END OF B.M.T. TROLLEY WIRE
B.M.T. LOCOMOTIVES
STOP HERE
smaller sign reads:
NOTICE
CARS MUST NOT BE
PLACED SO THAT THEY
SPAN ACROSS THE
INSULATED JOINTS
In the image, the subway cars are spanning the insulated joints.
D. Klepper photo

added 22 September 2026

.

.
R10's southbound along McDonald Avenue between Avenue I / Avenue J - ca. 1948
Note cross over in pavement in front of northbound McDonald Avenue trolley (PCC)
D. Klepper photo
added 22 September 2026

.

.
   The images below, despite their pixelation and grainines, show an different perspective of the SBK trackage entering McDonald Avenue.

SBK #5 entering the street trackage at intersection of Avenue I, Twentieth Avenue at McDonald Avenue - ca. 1948
Looking north-northeast and north. Parkville Interchange to rear of freight cars.
D. Klepper photo
added 22 September 2026
.

.
   Sometime after 1969, Penn Central Transportation Co. (or simply Penn Central) had taken over freight service on the Bay Ridge Branch from the Long Island Railroad. It is unclear at this time exactly who the Penn Central serviced along this route (we do know that Penn Central serviced G & R Packing which was located further west at 8th Avenue (through at least 1973) as well as Leeds Paper and Scheck Brothers at Parkville Interchange. Freight service would gradually diminish along this branch, and when carfloating operations ceased at the Bay Ridge Yard in 1971, resulting in its loss of regular freight traffic.

   In 1976, Penn Central itself would dissolve after filing for bankruptcy back in 1970. This in turn partially led to the formation of Conrail, of which would necessitate Conrail to run what little local freight service on the Bay Ridge Branch existed.

   In 1984, the Long Island Rail Road would purchase the Bay Ridge Branch from Conrail, thereby returning LIRR presence to where it had been once before.

   In 1997, the Long Island Rail Road reached a decision to privatize its freight operations. The "New York & Atlantic Railway" was organized in May 1997, and contracted with the LIRR to provide freight service in Brooklyn, Queens, Nassau & Suffolk counties.

   On May 21, 1999, the City of New York awarded Bay Ridge Yard to the New York & Atlantic Railway and it is the New York & Atlantic Railway that operates the Bay Ridge Branch to this day.

   So, what does all this have to do with the South Brooklyn Railway?

   It appears from several photos (not shown here) dated January & February 1972 seen on Dave Pirmann's website www.nycsubway.org, that even during the Penn Central owned years, LIRR would transport subway cars along the Bay Ridge Branch to Parkville Interchange for interchange with South Brooklyn Railway.


Parkville Interchange - Brooklyn NY - March 21, 1965
Looking north. Photographer is standing on Scheck Brothers Warehouse siding.
The crossing diamond is barely discernible under the snow next to the R32 and gondola.
The siding leading to the Leeds Paper Warehouse can be seen between the chain link fence and Lehigh Valley gondola.
D. Grotjahn photo
J. Testagrose collection

added 19 Dec 2009

.


Parkville Interchange - Brooklyn NY - March 21, 1965
Looking northwest. Subway cars and gondola on interchange track. Boxcars are on Bay Ridge Branch freight lead.
Property to left of concrete foundation is former location of LIRR Parkville Station Freight Yard.
D. Grotjahn photo
D. Pirmann collection

added 19 Dec 2009

.


Parkville Interchange - Brooklyn, NY - March 21, 1965
Looking northwest. Note the air reservoir in the gondola. This Lehigh Valley gondola was modified
for use in hauling subway cars on Lehigh Valley trackage on mainland U.S. Why it is seen here is not known,
(considering SBK has it's own transition cars) but apparently it is capable of transition use between
standard AAR couplers (on Class 1 and SBK diesels) and the H2A type couplers on the R32's.
D. Grotjahn photo
D. Pirmann collection

added 19 Dec 2009

.


Parkville Interchange - Brooklyn, NY - February 18, 1972
Looking north. New R44's being delivered with R1 transition car (Note end of transition car is marked "MCB" for MCB coupler.
Other end of transition car will have Form 70 Walton electric coupler). Box car on left edge of photo is on Leeds Paper warehouse.
Points and turnout under lead truck of subway car lead to Scheck Brothers siding.
S. Zabel photo
J. Testagrose collection

added 19 Dec 2009

.

.


Parkville Interchange - Brooklyn, NY - March 5, 1972
Looking north-northwest and taken from the elevated platform of the Avenue I station of the IND 'F' (Sixth Avenue Local) line.
#12 on interchange track at curbline of Avenue I with Penn Central Bay Ridge Branch (ex-NYNH&H / LIRR) tracks in background.
Note boxcar at top center of photo is on "Leeds Paper" siding and gondola with pipe is on Bay Ridge Branch freight lead.
Also note the single interchange track (as opposed to twin interchange tracks and other parallel trackage) shown in Emery map above.
Telephoto compression makes length of track appear shorter than actual.
G. Povall photo
authors collection

added 18 December 2009 - rescanned 18 April 2021

. 


Parkville Interchange - Brooklyn, NY - March 5, 1972
Looking south-southeast. #12 on interchange track at curbline of Avenue I with
McDonald Avenue (IND "Culver / Sixth Avenue" elevated line) in background.
G. Povall photo
authors collection

added 18 Dec 2009

.


Parkville Interchange - Brooklyn, NY - April 23, 1975
Looking north-northwest and taken from the elevated platform of the Avenue I station of the IND 'F' (Sixth Avenue Local) line.
Unidentified NYCTA diesels at head of train of R46's. The red Plymouth Valiant is the official "SBK escort" car for street running. 
S. Zabel photo
D. Pirmann collection

added 19 Dec 2009

.

   It is also inferred (but not confirmed) that South Brooklyn Railway would also provide occasional freight service to the tenants of that weirdly shaped building (Leeds Paper & Scheck Brothers) at the Parkville Interchange, as photos taken in 1972 exist of freight cars on these sidings with an South Brooklyn Railway locomotive in view and apparently performing switching services..

   This Leeds / Scheck structure is quite unique and the north wall was gull winged, as the walls actually curved to accommodate the unique "criss cross" arrangement of the siding tracks. The curved walls may be seen in a bing.com aerial photo:

.

   As of January 26, 2010; this structure was in the process of being razed (see photo in remnants chapter.)

   Conrail ceased using Parkville Interchange around 1976 and upon takeover of the Bay Ridge Branch from Penn Central. Having taken over the line, Conrail was casting off as much of the unused or under-utilized properties as they can. Anything a railroad owns is taxed, regards of being in service or not. Every inch of trackage, every square foot of property. 

   With South Brooklyn Railway having embargoed their McDonald Avenue right of way, there simply was no interchange partner remaining at Parkville Interchange. So, Conrail abandoned their portion of Parkville Interchange trackage. Any freight traffic on the line was now through routed using Fresh Pond, Queens with 65th Street Yard no longer being an origin point, and simply being a (light used) storage yard and a location to "turn trains" back to Fresh Pond. 

   In 1980, when the South Brooklyn Railway themselves were investigating in ceasing freight service altogether, they of course explored the possibility of of acquiring new customers along the line as part of a feasibility study. Conrail stated they would not reactivate Parkville Interchange even if South Brooklyn Railway did find any customers; which for all intents and purposes, sealed the fate for location. Conrail wouldn't service it, South Brooklyn had no customers that needed interchange through it via the McDonald Avenue right of way; so it was cast off for redevelopment.

   The Conrail interchange and runaround tracks were removed, and the Bay Ridge Branch "straight railed" (switches removed). The Parkville Interchange Yard was cleared and a large Ford automobile dealership with a service department and body shop; was built on the land. The back half of it can be seen in the 1972 photo above. After the dealership left, the building would become home to the Avenue I Flea Market in 1976, and this was an indoor 600-stall bazaar and market with shops and small food vendors - pickles, hot dogs, knishes, hot pretzels, burgers, fries and such. Parking was either on the old interchange tracks or on the roof. The Avenue I Flea Market lasted until 1992, and the building became home to "Rock Bottom" a discount / surplus / bulk lot outfit. They vacated in property in 1996 and the property sat vacant until 1998 when the site was redeveloped, and is now a Shop-Rite supermarket. During that period, the Interchange Track area was paved over and now utilized as a parking lot.

   This next street crossing I have images from, is Avenue P.

Avenue P


Looking north along McDonald Avenue at Avenue P - July 31, 1947
New York Transit Museum archives
Image ID: 2004.20.9.194
added 21 September 2026

.

.


Looking south along McDonald Avenue and Avenue P - July 31, 1947
W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.194
added 21 September 2026

McDonald Avenue & Billings Court (between Kings Highway & Avenue S)

   Returning to the "mainline" of the South Brooklyn Railway, the right of way would continue south towards Coney Island following McDonald Avenue to Kings Highway, where both the McDonald Avenue and the South Brooklyn Railway jogs a little to the west.

.


Looking north along McDonald Avenue at Billings Court. December 31, 1942
Kings Highway in background where elevated curves to left.
Flatbush Coal to left of photographer, and Avenue S behind photographer.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.1235
added 21 September 2026

.

.


13)  Avenue S & McDonald Avenue - Voorhee's Grain Silo / Flatbush Coal & Oil - Gravesend

.

   Heading south on the southbound track (west side of the street), the train would encounter a trailing point turnout and a short stub track located just north of Avenue S. This would be the location of one of the very few actual customer stub tracks on the Gravesend Avenue segment of trackage (currently only two are known - this one and one at Kensington Junction for the lumber yard).

   This turnout's arrangement was so a locomotive and train heading south (on the southbound track) could pull past the turnout with a cut of cars, where a trainman would throw the point and then the locomotive could then reverse direction and push the railcar into the spur and onto the property. Presumably there was a "between the rails" pit, where the feed or grain could then be offloaded and a conveyor would carry the feed/grain to the top of the silos where it could be dispensed.

   After researching 1916 E. Belcher Hyde Property Maps, I was able to learn that this location was originally William K. Voorhee's Grain Elevator. A track connection is not seen on the property map, but thanks to survey images for construction of the BMT Culver Elevated taken in 1915 and again in 1917, the spur is evident. 

   It is also understood that Voorhee's Grain Elevator had been a supplier for feed for the horses for the Brooklyn Jockey Club and the Gravesend Race Track which was pretty much diagonally across Gravesend Avenue and the stables one and a half blocks south. Voorhees would also sell to the public as well..

   On the property map dated ca. 1890, the property plot was listed as being owned by "Van Sicklen, Voorhies and Stryker". By 1899, the property only bears the name W. K. Voorhies. Please note the spelling of Voorhies vs. Voorhees changes between those seen on the property maps and that of which is actually painted on the side of the silos. As I'm more inclined to believe the person actually knew how his own name was spelled, I'll conclude Voorhees was the correct spelling. Also note that the alignment of Lake Street is proposed and not yet actually constructed.

E. Belcher Hyde - Atlas of Brooklyn, NY - 1899 
Volume 3, Plate 2 - Brooklyn NY
(note Kings Highway incorrectly identified as Avenue R -
further west on this map this thoroughfare bears the Kings Highway name)
annotated image by author
added 08 May 2021
August 10, 1915
Note trolley wire extending into spur.
unknown provenance
annotated image by author
added 08 May 2021

  


November 20, 1917
courtesy of the New York City Transit Museum Digital Collection
annotated image by author

added 15 June 2020



E. Belcher Hyde Property Map - 1916
Volume 3, Plate 10
(spur to grain elevator not shown but known to exist)
courtesy of New York Public Library Digital Archives
annotated version ©2018 by author

added 11 July 2018
.

.


E. Belcher Hyde Property Map - 1929
Volume 4, Plate 137
courtesy of Historic Map Works
annotated version ©2018 by author

added 11 July 2018

 

   As some point in time, but specific date unknown; the property changed hands as well as commodities, and concrete coal silos built and a coal dealer would conduct business there.

   I am deeply indebted to Ben Schaeffer for recording the name of the industry, as for many years now it has bothered me that I could not remember for myself! As I lived just a few blocks away, I was always intrigued with the operation, but the short-sightedness of my youth precluded me from taking note of the name. I distinctly recall seeing the "4 pack" coal silos looming above the Avenue S entrance/exit of the Kings Highway Station of the F train. As I lived on Avenue S (and East 8th Street), this was my stop and I used it frequently.

   Presumably there was a "between the rails" pit, where the coal could then be unloaded and a conveyor would carry the coal to the top of the silos where it could be dispensed by gravity.

   With deepest apologies, I cannot recall who sent me the following images some time ago, so if you see them, please give me a shout so I can credit your contribution. In these next series of images, taken ca. 1940 are from the New York City Property Assessment Images Series. These photos show Flatbush Coal between Avenue S and Kings Highway on Gravesend Avenue with the rail spur leading into underneath the silos; and the backside of the building from Lake Street showing the tops of the silos.

    



Flatbush Coal Co. - 1940
front left of facility taken from Gravesend Avenue
courtesy of NYC Department of  Records and Information Services

added 18 April 2021

Flatbush Coal Co. - 1940
front right of facility taken from Gravesend Avenue
courtesy of NYC Department of  Records and Information Services
added 18 April 2021

Flatbush Coal Co. - 1940
rear side of facility taken from Lake Street
courtesy of NYC Department of  Records and Information Services

added 18 April 2021
.

.

Flatbush Coal advertising ink blotter - pre-1931 (Gravesend Avenue)
collection of the author
added 07 November 2022


Looking south along McDonald Avenue south of Avenue S - February 28, 1945
 Avenue S behind photographer.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.568
added 21 September 2026


.

.


14)  Avenue U & Gravesend (McDonald) Avenue Delivery Station - Gravesend


August 2, 1915
courtesy of the New York City Transit Museum Digital Collection
annotated image © 2020 by author

added 15 June 2020

.

.

   According to the book "Brooklyn - A National Center of Commerce & Industry" as published by the Committee on Industrial Advancement of the Brooklyn League in 1914; in the chapter Freight Depots, Piers & Stores on page 42, lists this location for deliveries of freight on the South Brooklyn Railway.

   At the time this was read, it was unclear if this location hosted a team track, a platform or a full freight station. By the issue date of the 1961 Raudenbush Map does not reflect any presence here, so we might conclude it was long gone by that date.

   In referencing the 1916 E. Belcher Hyde Property Maps for this area (seen at right); it was then learned there were rather lengthy sidings between Kings Highway and Avenue U along Gravesend Avenue for the "lay up" of the "Brooklyn Jockey Club Specials" that the Long Island Rail Road ran to bring passengers and spectators to the Gravesend Race Track events.

These trains are well documented on Art Huneke's website: Brooklyn Jockey Club / Gravesend Race Track 
and these LIRR steam trains were in addition to the regular scheduled streetcars & trolleys operating along Gravesend Avenue.

   Interestingly enough, one of the three sidings (the east most) is dramatically shorter than the others. Whether this is of any significance remains to be seen.

   After viewing this map, this author had a epiphany. What if (and this is strictly conjecture here), the Brooklyn Jockey Club itself was the delivery station?

   That book mentioned above lists it as a "delivery station" and not a "freight station" as other stations are listed on the South Brooklyn Railway. Could the difference in description be that this location was in fact a receiving station only for the Brooklyn Jockey Club, for items such as grain, hay and other commodities required for the operation of the Gravesend Race Track?

    It is very doubtful there could have been any type of outgoing freight from a horse racing track per se other than the passengers at the end of the events, except for maybe manure and perhaps the 'has been' mounts enroute to the glue or dog food factories. Just kidding!

   By the next series of E. Belcher Hyde property atlases are issued in 1929 (excerpt shown below), the entire Gravesend Race Track is gone and the street grid being built to plan.

   But yet, two of sidings show in the 1916 Map have been cut back to stub tracks ending at Avenue T. Perhaps this would be the impetus to install a delivery station at this location? According to the Linder / Eppler article, "part of the Gravesend Race Track siding at Gravesend Avenue south of Kings Highway was removed" in 1923.

   Fortunately, we can see in the 1924 Fairchild Aerial Photo, several freight cars shown on the sidings. This was after the Gravesend Race Track was demolished, the street grid completed and residential housing being constructed, as we can still see the turf oval of the racetrack in quite a few of the unimproved and empty lots. 

   Further reference to the Linder / Eppler article states the Gravesend Race Track siding was completely removed in 1925.

   Lapse forward two years, and the discovery of an image in the digital collection of the New York City Transit Museum. The image is part of a survey series taken for the construction of the Culver Elevated over Gravesend Avenue. One of these images, dated August 1915, is marked "Avenue U & Gravesend" and in it we can clearly see the turnout for the southend of the Gravesend Race Track sidings. 


1924 Fairchild Aerial Survey Photo
original photo courtesy of New York City Department of Information, Technology & Telecommunications
annotated version ©2018 by author
annotated by author

added 11 July 2018
...
E. Belcher Hyde Property Map - 1916
Volume 2, Plate 12
courtesy of New York Public Library Digital Archives
annotated version ©2018 by author
added 30 June 2018


.

E. Belcher Hyde Property Map - 1929
Volume 4, Plate 138
courtesy of Historic Map Works
annotated version ©2018 by author

added 30 June 2018


15)  Prospect Park & Coney Island RR / SBK Culver Yard & Depot Coney Island freight house

.

   Over the course of its history, the South Brooklyn Railway would come to have at least three different locations in Coney Island that it would call home to its freight house, and we will address them in chronological order.

   The first of these would be located at the Prospect Park & Coney Island Railroad's Culver Station. 
This streetcar depot also had a yard and turning loops for the trolleys. We know by viewing both the 1907 Hyde Property Map below and the 1924 Fairchild Aerial photo that this location also had various sidings for local industries throughout its existence. I think it can be safely surmised that the South Brooklyn Railway (as freight agent for the Brooklyn Rapid Transit and owner of the PP&CI) serviced this industries.

 

1907 E. Belcher Hyde Property Atlas
courtesy of New York Public Library Digital Collection
annotated version ©2018 by author

added 11 July 2018

.

.


E. Belcher Hyde Property Atlas - 1929
New York Municipal Archives
added 09 July 2026

.

.


The "old" Coney Island Freight Station - May 30, 1938
William J. Rugen photo
image courtesy of Queens Public Library Digital Archives
color corrected by author

added 21 May 2019

.


.

   In 1909, the South Brooklyn Railway filed an application with the Public Service Commission to discontinue using the freight building at the Culver Yard, Coney Island. This freight station, which was owned by the Long Island Rail Road and operated the PP&CI RR; and was stated to be in dilapidated condition. As a result, the South Brooklyn Railway wished to relocate about 1000 feet to a new freight house on the property of the Sea Beach Railway between West 8 and West 12th Streets:

.

.

   The right image below, reflects the trackage on the Culver Terminal from the June 11, 1904 trade journal "Street Railway Journal". While not specifically mentioned, it gives us an a detailed visual reference of the 'new' Culver Yard & Depot. It is believed that the "dilapidated freight house" in question is on the spur marked "To Long Island RR Freight Yard" on the left edge just south of the Sheepshead Bay Road grade crossing, but this is not confirmed. 

   The left image is the 1924 Fairchild Aerial Survey Photo below (annotated by the author). This image, while showing more than the basic area pertaining to the South Brooklyn Railway, was deemed beneficial as it shows the various locations used throughout the history of operations of the South Brooklyn Railway in relationship to one another and in one image.


1924 Fairchild Aerial Survey Photo
courtesy of New York City Department of Information, Technology & Telecommunications
annotated by author
added 11 July 2018



map to right:
June 11, 1904 Street Railway Journal
Google Books
added 11 July 2018


.

   As originally built, the Prospect Park & Coney Island Railroad right of way (and with it the route that South Brooklyn Railway followed) veered a bit to the east at Avenue X and Gravesend Avenue and came out from under the Culver elevated structure.

   The Culver El remained on Shell Road, but the trolley route took it through the area on its own private right of way, through undeveloped land and tidal marsh back in those days.

   Upon reaching the Coney Island Creek, and it was built upon fill with a small trestle crossing the Coney Island Creek.

   This scene in the image at right falls geographically in the vicinity of Colby Court just north of Shore Parkway.

   This little bit of geography and history has been obliterated, as Coney Island Creek now ends at Shell Road. 

   The Coney Island Creek and its tidelands, from Shell Road all the way to Shore Boulevard by the west end of Sheepshead Bay; had been land filled partially due to urban expansion, and part in due to the construction of Shore Parkway (also known as the "Belt Parkway") which began in 1934.

   Following this, the trolley tracks were installed in Shell Avenue either under or along side the Culver El. 

   When completed in 1920, the BMT "Culver" elevated line and (now the present  ) would come to dissect the Prospect Park & Coney Island Railroad Culver Yard.

   Upon the construction of Shore Parkway / Belt Parkway, the tidal marshes were filled in to the east of Shell Road, so the private trolley right of way was realigned a few hundred feet to the west to follow the Shell Road right of way (and which would continue under the Culver el for another few blocks south). This was shortly followed by the construction of residential housing in the adjacent areas.the streetcar trackage was. 

.

.


16)  Relocation: The SBK Culver Yard at Avenue Z replaces the SBK Coney Island Freight House at West 5th Street.

.

   Also, at the intersection of Gravesend Avenue (to become McDonald Avenue in 1931) and south of Avenue X, the name of the changes to Shell Road. And, upon being built in 1926, the southwest corner of this intersection begins the Coney Island Shops of the New York City Transit Authority. 

   The McDonald Avenue / Shell Road running tracks veer a little to accommodate the wider thoroughfare which allowed for the inclusion of a traffic island.


R10's (and a transition car) on Shell Road at Avenue X heading southbound to Coney Island Yard - ca. 1948
D. Klepper photo
added 22 September 2026

.

.


Looking south along McDonald Avenue at Avenue X - April 20, 1948
This side of intersection is McDonald Avenue - the other is Shell Road.
The brick building is the NYCTA e.lectrical equipment shop

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.623
added 21 September 2026

.

.


Looking north along Shell Road at Avenue X - April 28, 1950
This side of intersection is Shell Road - the other is McDonald Avenue.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.621
added 21 September 2026

.

   At some point between the construction and opening of the Coney Island Yards & Shops in 1926 and 1929, the South Brooklyn Railway relocated to this location. 

   By the publication of the 1929 edition of the E. Belcher Hyde Property Maps; the BMT Coney Island Yards are shown. But more importantly, a subyard is shown connected to the Shell Road street trackage. And this would become the South Brooklyn Railway Culver Yard, if it is not already. I have also seen it referenced as the "City Yard".

   While a great deal of traction and Brooklyn industrial railroad enthusiasts are more than familiar with the SBK's freight operation at the west end (38th Street, First Avene) and Greenwood Industrial sidings), there is little recollection for this location.

   Sure, the images of SBK locomotives hauling subway cars into Coney Island Yard leads are famous, the freight station adjacent to it was hardy noticed. Even in Facebook groups, the "new generation" of fans "there was no South Brooklyn Railway freight depot in Coney Island Yard. It was all by 37th Street.." After I post a "WADR, I beg to differ"... and drop this images; shortly following is a mea culpa "I never knew."


1929 E. Belcher Hyde Property Map
courtesy of Historic Map Works
annotated version ©2018 by author

added 11 July 2018

.

.


Looking north along Shell Road at Avenue Y - November 1, 1939
Here the southbound running track splits and the crossover to the northbound running track veers to the east a little, until reaching Avenue X.,
at which point it resumes running side by side with the other running track.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.528
added 21 September 2026

.

.


Looking south along northbound trolley track at Shell Road and Avenue Y - November 1, 1939
Here the track merges and the southbound to nothbound crossove joins the northbound running track.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.527
added 21 September 2026

.

.


Looking south along Shell Road and southbound trolley track at Coney Island Yard entrance gate for South Brooklyn Railway - November 1, 1949
Tower C is on right side of image, with cluver ramp decending from the Culver Elevated down to the Coney Island Yard at ground level.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.526
added 21 September 2026

.

.


Looking north along Shell Road and southbound trolley track with #9980 trailing train (unpowered)
at Coney Island Yard entrance gate for South Brooklyn Railway - ca. 1948
Side note: this is the first image where the author has seen #9980 this far south. All other images have it Fourth Avenue or west.
D. Klepper photo
added 22 September 2026

.


South Brooklyn Railway - Culver Yard / Avenue Z freight station & team tracks.
excerpt of New York City Transit System - March 26, 1946
Coney Island Yard - BMT Division Brooklyn
Site for disposal of r.r. cars - Contract Drawing Map A3
courtesy of J. Erlitz
added 26 September 2026


   In this next image, the 1951 Aero Service Corp Aerial Photo; we can see the Coney Island Shops and Yards and where the SBK would have its southern terminal. We can also compare the topography of the area, namely the filling in of the tidal marshes and the truncation of the Coney Island Creek allowing the Coney Island Shops to be built.


1951 Aero Service Corp Aerial Photo
annotated by author

added 11 July 2018

.

.

SBK #5 working inside SBK "Culver Yard" along Shell Road between Avenue Y and Avenue Z  - ca. 1948
Looking north.
D. Klepper photo
added 21 September 2026

..

.


team track use inside SBK "Culver Yard" along Shell Road between Avenue Y and Avenue Z  - ca. 1948
Looking north.
D. Klepper photo
added 21 September 2026

.

.


Looking north inside SBK Team Yard along Shell Road between Avenue Y and Avenue Z  - November 30, 1953
Coney Island behind photographer
Avenue Z conduit & breaker room on left, Tower C directly in front on photographer in background.
Coney Island Yard over fence to left.

W. H. Lundin photo
New York Transit Museum archives
Image ID: XX.2009.125.121
added 21 September 2026

.

.


Looking north inside SBK Team Yard along Shell Road at Avenue Z entrance gate  - October 15, 1947
 Avenue Z to right, Coney Island behind
Avenue Z conduit & breaker room on left, Tower C directly in front of photographer in background.
Coney Island Yard over fence to left.

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.206
added 21 September 2026



Looking south inside SBK Team Yard at freight house and forwading firm (Wm. Pinsker) - October 15, 1947
Shell Road and Avenue Z entrance gate out of view to left.
Coney Island Yard over fence to right

W. H. Lundin photo
New York Transit Museum archives
Image ID: 2004.20.9.207
added 21 September 2026

.

.

      Quick side note: the official name of this vast facility is "Coney Island Rapid Transit Car Overhaul Shop". It is the largest rapid transit yard in New York State as well as one of the largest in all of the United States. All told, it covers in excess of it covers 75 acres. There is very little that cannot be done at the Coney Island Complex, and not only is the vast roster of revenue subway cars repaired & overhauled here, but also the diesel work locomotives and maintenance of way equipment, and the rolling stock that makes up the NYCTA Museum Collection, including the South Brooklyn Railway steeplecab electric locomotives #5, #6 and #7.

   
The Shell Road routing of the South Brooklyn Railway actually bypasses the Coney Island Shop structures, and arrives at a facing point turnout on Shell Road between the intersections of Avenue Y and Cobek Court (#1 and #2 in the left diagram below). Taking the diverging track (heading south) from this turnout would lead into the South Brooklyn Railway Yard. Freight service did not extend past this turnout by this time. Continuing straight would lead to a trolley loop located on West 6th Street (and to the former PP&CI Culver Yard). Again, keep in mind that by this date the South Brooklyn Railway was no longer engaged in street car delivery or less than car load delivery and the only "customer" here was the NYCTA.

   Once the South Brooklyn Railway train has entered their yard and passed over turnout #3, this turnout would be thrown and the train would reverse direction and proceed north into the Coney Island Shop trackage. This "switchback" maneuver is shown in the left image below. 

   Please take note: the track work of the South Brooklyn Railway Yard seen in the left image was partially "reconstructed" from examining a 1954 aerial photo seen on historicaerials.com. It appears a significant amount of trackage was "in the dirt" and barely viewable, so the possibility of more trackage at this location exists. 

   In the right image below, the original South Brooklyn Railway yard lead track into the Coney Island Shop track can be seen, and it is represented by the number 4 in the diagram at left. The resurfacing of Shell Road and subsequent reconstruction and expansion of the Coney Island Facility, made this location in the photo the ad hoc end of track.


April 2008 - South Brooklyn Railway yard lead at Coney Island Yard
(looking northeast at intersection of Shell Road and Avenue Y)
P. F. Strubeck photo

added 16 Dec 2009

"switchback" track arrangement for
South Brooklyn Railway trains to enter
Coney Island Yard
(dashed line denotes surface track under elevated)

added 15 Dec 2009

.

.

   One of the more significant movements of the South Brooklyn Railway to the Coney Island Shops, was the U. S. Department of Transportations "State Of The Art Car" heavy rail mass transit demonstrator set. Built by St. Louis Car Company, and after testing at the DOT's High Speed Ground Test Center in Pueblo, Colorado, the SOAC set was demonstrated on six rapid transit systems throughout five cities in the United States, to include additional testing and public ridership and response. The first of these cities was to be New York City. 

   Each of the cars had different seating configurations for study; low density and high density. The high density car had transverse and longitudinal seating with a total seated capactiy of 72, allowing more standing passengers and this allowed a total of 300 poassengers total. The low density car has 62 seats in three sections: one with transverse seating (like MetroNorth or Long Island Rail Road), the second with a mix of seat types and the third section a mix of seat arrangements and two tables. Both cars were 'A' cars with operators cabs at the ends, so the set could be operate in either direction.

   The SOAC Cars and two transition cars (converted gondolas) at each end with a coupler for the SOAC set on one end and MCB coupler on the other end to allow conventional locomotives to tow the set to the next demonstration location. 

   The SOAC cars and transition cars were carfloated from Greenville, NJ into Bush Terminal by New York Dock Railway, then interchanged with the South Brooklyn Railway at 38th Street and Second Avenue Yard, and the SBK which brought them to the Coney Island Shops for inspection and preparation for service on the NYCTA Rapid Transit (Subway) system. 

   Revenue service began on May 17, 1974 and would operate on the A, D, E and N lines with the two car set restricted to Independent Division (IND) routes. Demonstration was completed on July 19 of the same year, and the two car set and transition car (a converted gondola) were shipped out the way they came in to the next city. These cars survive and are located at the Seashore Trolley Museum in Kennebunkport, ME.


U.S. Department of Transportation State of the Art Car demonstrator set - 1974
South Brooklyn Railway / New York City Transit Authority - Coney Island Yard Interchange at Avenue Y and Shell Road; Brooklyn, NY
Note the transition car: "freight car" end towards the SOAC set - barely visible is a compromise coupler!

Joseph Biem photo
William Mangahas collection

added 18 April 2021

.

.


17)  Bedford Car Load Freight Station

.

   On 10 July 2010, I was doing research for the Union Inland Freight Station in Manhattan. I took out my 1943 Map of Railroad & Terminal Facilities in the Port of New York, and after referencing the Union Inland Freight Station, I began to "explore".

   I took note of a solitary facility way out in the middle of Bushwick, Brooklyn. It shows simply "Bedford, S. Bklyn" and the location is noted as being Car Load Delivery. The problem here is, there is no trackage to this location!


1943 Map of Railroad & Terminal Facilities in the Port of New York
authors collection

added 10 July 2010

.

   When this page was first composed; there was no reference to this location anywhere else and as far as I had researched. At that time, I could only come to the following hypothesis as to the purpose of this location:

1)  it was served by electric streetcar, or
2)  it was part of the South Brooklyn Railway's door to door motor freight.

   Research conducted in 2018, revealed some interesting information on this location. As it would happen, this location was the premises of Arabol Manufacturing at 56 Nostrand Avenue, Brooklyn, NY. 

   Upon reading a very lengthy testimony transcript contained within the Notice of Appeals for the Appellate Division of the New York Supreme Court; Brooklyn Heights Railroad  v. Alfred Steers dated March 1912, it was revealed that the Arabol Manufacturing Company acted as freight agent (as well as being a customer themselves) for several local businesses in conjunction with the South Brooklyn Railway. 

   According to photographs contained in the exhibits, this location had a sign "Bedford Freight Station - South Brooklyn Railway" and businesses that utilized this "freight station" include Amid Duron (located in the same building with Amadol), Charles Froeb (wholesale distributor of wines & liquors) and J. W. Oelerich (food packaging).

   Upon reading this transcript, it appears this Mr. Steers had brought suit against the South Brooklyn Railway / Brooklyn Heights Railroad for blocking the sidewalk with freight cars on a spur that ran into the Amadol property. It is both sad and refreshing to see that "NIMBYism" dates way back and is not particular to this modern era of litigiousness!

   So at least we now know something about this Bedford Freight Station and are slightly relieved that we were correct with out first option above. 

   And, I think it can be safely concluded that service to this location would have concluded with the cessation of streetcar traffic.

.

.


 18)  Motor truck delivery service

.

   As it turns out, I might just have been closer to figuring out the actual purpose for the Bedford location above, than I realized. 

   By referencing a particular paragraph in the article below, an unusual facet of South Brooklyn Railway's operation comes to light:


excerpt from March 1955 issue of "Transit Magazine"
collection of Joseph D. Korman

added 10 July 2010


.

   Coincidentally, in the chapter discussing the South Brooklyn Railway, it is mentioned on page 75 of "Railroads of New York" by G. W. O'Connor (Simmons Boardman Publishing, 1949):

   "It also operates a fleet of trucks."

   We know now that the South Brooklyn Railway contracted with Horstmann trucking, and operated their Paramount Station which offered truck delivery from the main freight house to the customers door, via motor truck. This is discussed a little more at length in the Customers chapter above. 

   With this "Bedford" location still shown on the 1949 edition of the New York Harbor Terminals Map, but no longer shown on the 1951 edition or subsequent issues of the New York Harbor Terminals Map; the exact year this facility was closed now appears even clearer, however the exact year that South Brooklyn Railway motor truck delivery ceased remained unknown. It is my foregone conclusion that the reason service stopped is that this service become superfluous with the widespread use of the private motor truck.

.

.

RETURN TO INDEX

.

1978: The Beginning of the End of the Old Era of Operations

   Most Brooklyn railroading enthusiasts are already aware that a vast majority of the South Brooklyn Railway trackage - 4.5 miles worth: south of Fort Hamilton Parkway to Coney Island Yard; was taken out of service February 1, 1978.

   Out of a railroad that operates only 6 miles of trackage, this was a huge bite. Granted, the only customer remaining on this segment was the NYCTA Coney Island Yard, at the extreme south end. The coal dealers along the route either switched to home heating oil, or natural gas (the Texas Eastern pipeline which opened in 1955 was instrumental in this) or closed period.

   Other industries at the very least, were turning to interstate trucking. All the railroads were losing to this growing method of freight transportation. By 1978, there were only two "non-NYCTA customers": those being Davidson Pipe at Third Avenue and Roberts Foods at 37th Street and Fort Hamilton Parkway. 

   While the February 1978 embargo and subsequent 1980 abandonment of the rest of the line has not have received its fair share of coverage, and there are details that have gone unknown until now. Most rail enthusiast accounts simply end at the 1978 date. 

   But there was life after this date for the South Brooklyn Railway, and we shall get to that shortly.

   After several Freedom of Information Act requests over the past decade or so, the author was fortunate to finally receive copies of several documents forwarded to him.

   The first of these documents, including the resultant memos to and from various officers of the NYCTA; 

Report to the President
South Brooklyn Railway Company
on the
Current and Future Operations of the Railroad

.

   This report, spelled out the potential shutdown of the South Brooklyn Railway's freight operations - particularly those east of Ninth Avenue.

   In a proposal drafted May 12, 1980, there were but six employees (one freight manager, one administrative assistant and four crew members) of the South Brooklyn Railway. There were three customers remaining and being served by the South Brooklyn Railway:


   Freight traffic was interchanged with
  The South Brooklyn Railway trackage along McDonald Avenue was in poor condition, and if service was to continue along the route, a capital expense of at least a $3,000,000 was required.
.

.

Conrail refused to reactivate the Parkville Interchange

  Furthermore, even if this reconstruction were to take place; it would be of limited returns as the connection with Conrail at Parkville Junction had been abandoned by Conrail, and Conrail was not interested in the least in rehabilitating the interchange.

   Parkville Interchange had been near the beginning of the 12 mile long railroad line known as the Bay Ridge Branch; when the Long Island Rail Road / New York, New Haven & Hartford RR's 65th Street transfer bridges were in operation.

   With the transfer bridges torn down several years prior, this Brooklyn "end" of the Bay Ridge Branch was now a dead end, and no longer the beginning; even despite some minuscule freight traffic was coming into Bush Terminal to be interchanged at 65th Street by the New York Dock Railway. It simply was not enough.

   Therefore, Conrail generated freight would have to be brought in from the Bronx via the Hell Gate Bridge into Queens, 8 miles via the New York Connecting RR. Here a train would be broken down, sorted and reblocked; at LIRR Fresh Pond Junction in Glendale, Queens. Then, what little freight traffic there was, was brought down the Bay Ridge Branch. A multi-hour, and sometimes multi-day trip and I'll explain why.

   The Bay Ridge Branch at that time ran through very sketchy neighborhoods and urban blight was rampant. A lot of people were using the seldom used line as a garbage dump: abandoned autos, stripped of parts then burnt. Stolen supermarket shopping carts, discarded refrigerators, freezers, couches, recliners and other assorted furniture littered the tracks.
 Demolition debris dumped instead of being properly disposed of. Those few train movements along the line usually encountered delays, while the abandoned vehicles had to be removed by tow truck.So bad was the situation, Conrail would send a clean up train every six months to remove the largest of the debris.

  What wasn't being dumped, was being stolen. Scrap thieves making off with copper wire from signals and telephony; as well as steel rail, switch frogs, spikes, tie plates from sidings. There were also repeated incidents of rocks were thrown at the locomotives and crews, (much less being shot at) as it passed through, or concrete blocks dropped as the locomotive passed under the many overpasses.

   The very bottom line, Conrail was not interested in any intermittent interchange on a dead end track, even though it connected with a New York Dock Railway interchange at the 65th Street end, and the South Brooklyn Railway at Parkville.

   A study conducted by Wilbur & Smith Associates in 1978 saw no potential for new rail service customers along this segment of the line.


   Returning to the state of South Brooklyn Railway, rebuilding of the McDonald Avenue trackage would also require raising the overgrade bridge (over the Bay Ridge Branch) to increase the height below to Conrail train movements. Ironically, this eventually done anyway by the New York City Department of Transportation, albeit without the tracks in McDonald Avenue for the South Brooklyn Railway.

   The South Brooklyn Railway was down to five pieces of rolling stock: two diesel locomotives (N1 and N2) and three old wooden "Singer" 36 foot boxcars used for storage and no longer certified for service. And the South Brooklyn Railway owned the following three parcels of property:

   The parcel of land that Davidson Pipe occupied had been sold directly to them some years prior.

   The South Brooklyn Railway saw income from two sources: freight operations and rental properties. While the South Brooklyn Railway ledgers show a net profit was earned of $23,000 for the fiscal half year prior December 1979 to July 1980; however the amounts were shrinking; a decrease of $12,000 in revenue since the previous year.

   In light of these statistics and conditions, the freight manager of the South Brooklyn Railway was proposing the South Brooklyn Railway be shut down,
foregoing all freight operations; with a potential option of selling the South Brooklyn Railway operation to New York Dock Railway.

   The section of trackage from Fort Hamilton Parkway to Coney Island Yard, including the 37th Street Right of Way, and the McDonald Avenue trackage; had been out of service and embargoed for almost two years (February 1978), but still owned by the South Brooklyn Railway. It should be noted, that at this juncture; the South Brooklyn Railway was an independently held for profit subsidiary corporation of the NYCTA.
.

.

Selling the operation - the private operator option; Is New York Dock Railway interested?

   If sold to New York Dock, freight service to Davidson Pipe would not be impacted, with their location being west of the subway trackage.

   Roberts Foods however, which was the east end of the Tenth Avenue Yard - 37th Street just west of Fort Hamilton Parkway would be adversely and severely impacted.


   This customer employed approximately 80 persons, 20% of which were minorities. Roberts Foods received an average of 16 tank cars of food product per month. These tank cars are listed as being special 150,000 pound cars.

   In discussion with Mr. Malamud, Project Manager for New York Dock Railway; he stated his firm would be willing to take over the operation of the South Brooklyn Railway; but,
"would not be willing to purchase and property or equipment."


   A couple of issues arose:

   a)    Because the necessary freight moves to Roberts Foods required "wrong-railing" (train movement against the regular flow of subway traffic) the necessary safety measures had to be installed on
           New York 
Dock's locomotives, (trip cocks for the signal stop arms) unless New York Dock purchased South Brooklyn Railway locomotives N1 and N2 (which were only 6 years old as of this
           date);


   b)    Even if New York Dock Railway were to change their mind and purchase the South Brooklyn Railway locomotives, the charter of the New York City Transit Authority prevented an outside,
           privately held
operation from operating on subway trackage; hence why the South Brooklyn Railway was kept in operation: it was a subsidiary of the NYCTA.

   The following was put forward by T. D. Stewart, Jr. (Assistant General Superintendent):
"The question arises, do we want trains, without protective tripping devices, manned by crews under the jurisdiction of an outside agency, operate and make complex moves on tracks used for passenger service? The Rapid Transit Transportation Department feels this is a totally unacceptable risk.
.

.
Could / would Roberts Foods relocate? Yes, but no.

   Another option discussed but quickly ruled out, was Roberts Foods relocating west of the subway portion of trackage - somewhere else in the Sunset Park area allowing them to still be serviced by New York Dock Railway without having to enter the NYCTA subway trackage.

   Of course, Roberts Food could relocate - the were plenty of available lofts and buildings looking for tenancy in Bush Terminal, but the owner of Roberts Foods, Robert Barbieri; had stated at a meeting December 16, 1980; if rail service ceased to their location where they were now, they were simply going to relocate to New Jersey - which was offering low interest loans, and tax breaks to attract businesses, thus depriving the City and the State of New York of jobs and tax revenues.
It was not worth their time, otherwise.

   Three more points were raised on subsequent review: it was also discussed that it would not financially practical or beneficial for a private entity to purchase the South Brooklyn Railway operation and retaining for service to Roberts Foods at their existing location, as:
a)    which required the purchase of two diesel locomotives (even the 6 year old locomotives of the South Brooklyn Railway) on account of clearances (SBK / NYCTA diesel locomotives are narrower than
       "stock models" diesel locomotive in use by general railroads - i.e. New York Dock) of which in 1980, New York Dock had GE 44 tonners, GE 80 tonners, ALCo S1's and RS3's - all of which were "stock
       models" and wider than what would fit on subway clearances.
.
b)   as New York Dock would also have to pay for both a NYCTA towerman for switching on NYCTA controlled tracks, as well as a NYCTA motorman pilot for the trains journey over NYCTA subway trackage,
       all at the prevailing union rates;
.
c)    and would have to comply with the restrictive hours of deliveries on that portion of trackage of 10 am to 3 pm.
.

.
FCC Registration of Radio Frequencies

   While more of a technical nature than being applicable to the history of the South Brooklyn Railway, was the potential of losing two FCC licensed and assigned channels for radio transmissions (B-1 and B-2), but of which were also used by the two divisions on NYCTA subway (BMT & IND). Replacing necessary radios and transmitting devices would cost an estimated 10 million dollars.
   
.

.


Electrolysis / Voltage Leakage  - McDonald Avenue at Avenue T and Avenue I

   There was one more technical consideration to be considered by the abandonment of the McDonald Avenue portion of trackage. 

   In has been learned in a document, Minutes of Meeting of Board of Directors held October 14, 1980, from J. Mombach, Assistant General Superintendent (Power) to C. Kalkhof, Gen'l Superintendent (Rapid Transit):
   "Reference is made to your request for comments on the above proposal, the Power Department has in the recent past made a comprehensive investigation of electrolysis in the McDonald Avenue - Avenue T and Ave I areas.

   This investigation determined that substantial current was flowing on the rails along McDonald Avenue.

   This current was flowing in both directions; additionally, it was found that the resistance between the elevated structure and the surface rails was low.

 
   The exact contact point(s) could not be identified. This "large" situation coincides with the number of faults on two Power High Tension Cables running parallel with the rails and out to Brighton  - West 8th Street Substation.

   There is evidence that these rails are a conduit for return current going from Coney Island Yard to Avenue T substation.

   It is believed that this problem cannot be solved by cutting the rails at certain points to isolate and eliminate the flow of current from the structure. There appears to be too many areas of contact between the rails and the structure."

   Therefore the Power Department recommends that the rails be removed from the roadbed and be replaced with a foundation of concrete and a topping of asphalt. Is it further recommended  that consideration be given to resorting to a scrap contract to have the work done at little or no expense to the South Brooklyn Railway.


   It was ultimately decided:

  1.  That the South Brooklyn Railway Company maintain its present operations and retain its properties from Gowanus Bay west of 2nd Avenue to Fort Hamilton Parkway (Page 1, Exhibit A.)
  2.  That the South Brooklyn Railway tracks from Fort Hamilton Parkway to Coney Island Yard be abandoned.
  3.  That provisions be made to have existing tracks along the abandoned section removed in order to eliminate the electric current leakage problem along McDonald Avenue.
.

.

Track Conditions at Second Avenue  / Bush Junction

   At the expense of my saying "I told you so," we now have documentation of why freight and subway cars were derailing at Bush Junction. All cars, not just subway cars. 

   And again; no, it wasn't because the radius of the curve was too tight as "railfan lore" has stated.

   This document, from A. DeLuca, Freight Traffic Manager, South Brooklyn Railway; to C. Kalkhof, Vice President and General Manager, Rapid Transit and dated January 15, 1982:

     Subject: Second Avenue Track Area

   Subject matter has deteriorated to an extent where derailments by the New York Dock Railway occur on each interchange of cars. In some track areas, guard rails is non-existent and wide gauges prevail creating dangerous conditions.

   Unless the City or State grant funding for rehabilitation, the South Brooklyn Railway will shorty [sic] cease to be viable railroad.

   I am continually subjected to complaints and threats of embargoes from the New York Dock Railway Company due to track condition. Spoke to Mr. Tony Riccio and advised him of the seriousness of the situation. He informed me that a meeting was scheduled between his office and representatives of the New York State Department of Transportation. I once again stressed the urgency for some positive action by either the City or the State.

   Should any program be formalized by private contractor and the Transit Authority which would include the utilization of 2nd Avenue tracks, under present conditions I would strongly urge that program find another location.

   I will be on top of this situation and any changes for the better will be reported to your offices. 

   

Field Report

Reason for Inspection / Field Survey

      A visual inspection of the track. While being conducted on a tour thereof by A. DeLuca, Freight Traffic Manager, South Brooklyn Railroad.

Observations:

      (i)  The guard portion of many lengths of girder (trolley) rails is missing, having corroding away and been broken across the entire top of the rail from field side to gauge side, 

      (ii) Some rails have corroded across the entire top of the rail from field to gauge side.

      (iii) Some of the rails are twisted outwards, thus widening the gauge to intolerable dimensions

      (iv) The gauge side of the rails varies sharply in horizontal alignment at various rail joints where (iii) above exists

      (v) The switch-point of the turn-out to the Yard is loose and well nigh inoperable.

      (vi) As a consequence of all the above there have been repeated derailments of trains much to the embarrassment of South Brooklyn Railroad and the unbearable inconvenience of its customers

   

"This refers to the memorandum dated January 5, 1952, from A. DeLuca, Freight Traffic Manager, South Brooklyn Railway, and our memorandum dated April 23, 1981, to you on the subject trackage .

The trackage on Second  Avenue,  between  28th  and  41st  Street is presently owned by the City of New York .


The tracks were inspected on January 7, 1982, by engineers from this department in the company of Andrew DeLuca, to determine the degree of deterioration and to come up with a cost estimate for corrective action.

Corrective action, within the limits of 38th and 41st Streets, is required on the north bound track, which is the only track in use, to keep it operative for the next three to four years, after which time, according to Mr. DeLuca, traffic will be rerouted through First Avenue.

The cost of this rehabilitation work by T. A. forces, based on work being performed on overtime, so as not to disrupt the normal maintenance schedules, is estimated at $275,000.
One of the switch points of the turnout, leadinq from Second Avenue into the South Brooklyn lower  yard was changed on Saturday, January 9, 1982, by T.A. personnel, using a modified point."

.

Condition Survey - March 22, 1989

   Another highly detailed document is this written survey of the track conditions from the eastside sidewalk of Third Avenue through to the Yard at Second Avenue.

   We all know the SBK infrequently used the line - and we all know how dated it was. But this survey reflects how poor the trackage was west of Third Avenue.




Current Operations



Update 2026:

Please note: For this chapter, more recent events are listed first.

.

   This update is long overdue, and I apologize to my loyal readers for my lack of timely attention.

   Since 1994, and with the closing of the Davidson Pipe Yard between Second and Third Avenues, the South Brooklyn Railway has had no other general freight customers other than the New York City Transit Authority; if you could even call the NYCTA "a customer". It is, for all intents and purposes; the parent organization for the South Brooklyn Railway. 

   As the freight subsidiary to the New York City Transit Authority, the SBK (as an operation) has not hauled new inbound subway cars or outbound obsolete subway cars for scrapping or rebuilding to or from either Bush Terminal Yard (or the NYCTA East New York Shops via the LIRR Bay Ridge Branch) for long period of time, leaving the South Brooklyn Railway theoretically a "paper only" operation.

   For a great deal of time, all new subway cars arrived via highway upon lowboy trailer / tractor trailer and over the George Washington Bridge. 

   Unless other new subway equipment is scheduled to arrive via New York New Jersey Rails' carfloats, or via New York & Atlantic Railway at 65th Street; the South Brooklyn Railway has no work other than internally with the NYCTA System, and its two locomotives N1 and N2 now are assigned to work alongside the myriad of other work equipment of the NYCTA.

   Sadly, their unique maroon and silver paint was fading and peeled, and it was uncertain if due to their age if they were even worth the NYCTA in repainting them in distinctive SBK colors. The GE 47 tonners quite simply, are tired. They were built in 1975, and have been rebuilt at least once since then. 

   It was believed, more likely than not, what with the arrival of the new R156's, they would be retired. But, if there is any justice in the world - and someone of authority in the NYCTA reads this; please save one (or both!) and keep it with SBK steeplecabs #6 & 7 in Coney Island Yard!

   That aside, what does the future hold for the South Brooklyn Railway? This is a good question and without a definitive answer. Until now.

   Please note - from here events will be listed most recent first.

.

N1 & N2 rebuilt, repainted - 2024

   Someone listened, for N1 and N2 received new Tier 4 emissions compliant prime movers - I believe they are Cummins QSK models, but this needs confirmation. So, at the very least, N1 and N2 will be with us for a while longer. 

   They were however repainted into the now standard C Division yellow livery, with green safety stripes (to denote they are low emissions hybrid work trains and / or battery-electric locomotives introduced in recent minimize underground emissions during track maintenance. The only "classic touch" is they wear the old two tone   logo, and not the current  ..

.

   Petition to have Ben Schaeffer's name applied to one of the locomotives in honor

   There was a petition circulating that one of the locomotives should carry Ben Schaeffer's name in memoriam and to honor his untimely passing the day after his birthday; on April 28, 2020. Ben is one of the first New York City Transit employee fatalities from CoVid-19. I don't think this petition garned enough signatures, but regardless; it should be done to honor Ben - a stalwart long time Transit employee, with several commendations for heroism on the job. Also consider that Ben was solicited by John Johnson, NYCTA management; to create a logo for South Brooklyn Railway, to which he did so.

   After all, the NYCTA has its own sign shop - what would it cost to create and affix vinyl lettering?

.

Inbound Traffic:

   Various new non-revenue MOW equipment, as well as new revenue R211T's passenger cars are arriving for the NYCTA, and it cannot be said the South Brooklyn Railway doesn't see service! 

   There is one caveat: disappointingly locomotives N1 and N2 are no longer assigned to their home trackage, so other NYCTA work locomotives of the equipment pool are hauling the equipment from and to the Second Avenue interchange. Well, at least the SBK trackage is still seeing use!

   New inbound equipment is now arriving via two methods; either by:

.

   Regards of arrival via either method, the new rolling stock was then offloaded onto tits own wheels at Second Avenue and 39th Street in the South Brooklyn Marine Terminal. 

   Once offloaded, NYCTA work locomotives then brought the new equipment into the Transit System for inspection and testing at the appropriate facility 

   Work equipment, and revenue passenger cars go to different facilities for final acceptance, prior to entering service.

   However, on November 25, 2025; the NYCTA opened their new Railcar Acceptance and Testing Facility located between Third and Fourth Avenues at 38th Street (the former SBK 38th Street Yard.) 

   It is at this location that all new rolling stock undergoes preliminary inspection (for any damage incurred in transit) and testing; before being brought to the appropriate NYCTA shop, and prior to entering service.

   Note there is no third rail at this facility, and battery powered SWXe-50 Shuttlewagons are used for moving equipment and cars.

MTA Publicity Release

image at right:

MTA Railcar Acceptance & Testing Facility - May 4, 2026
38thstreet between Third and Fourth Avenues (former SBK 38th street Yard)
John McCluskey photo
added 09 July 2026

images above and to left:
courtesy of the MTA
added 09 July 2026

.

Outbound Traffic: 2022

   After having served dutifully and reached the end of their service life; R32, R44 and R46 subway cars are being retired and sent out for scrap. 

   There are two methods were outgoing cars are being shipped; and this is dependent on who received the contract for scrapping.

   For the R32's that required shipping to Frontier Metals, a scrapping and recycling outfit in Ohio; the NYCTA via the South Brooklyn Railway dropped the cars at the Second Avenue Interchange between First and Second Avenues.

   Here, they would be picked up by a NYNJ Rail locomotive and crew, and brought to the NYNJ Rail 65th Street Yard, via the First Avenue running track. Once at 65th Yard, the R32s were placed on the northern most trackage in the yard (former LIRR lumber tracks) out of the way from yard activity.

   The R32's would then be lifted off their trucks, and the car-bodies set on specially equipped flatcars (pedestal flats) for transit.

   A private contractor (not NYNJ Rail) completed the securing of the subway cars to the pedestals via chains and welding for the trip.

    Once this was completed, the cars were carfloated to Greenville, NJ; and sent on their way west.

   For subway cars going to SIMs Metal Management (scrapping and recycling), the scrapper located in Jersey City, they remained on their wheels sets and hauled dead in tow. Since SIMs is located directly adjacent to the railyard at Greenville NJ, (the western terminus of NYNJ Rail carfloats) these subway cars could remain on their wheels for the very short journey.


  .

(Most recent movements first).

.
.


R252 Flatcars - June 2019


   In June of 2019, the first of the new R252 Contract MOW flatcars - OF801; began arriving. It appears to have arrived via highway on a low boy road trailer but was offloaded at the Second Avenue Interchange. (Why not directly at 38th Street Yard remains to be learned.) 

   The following link is to a video taken by "DJ Hammers", and is available on YouTube. Here NYCTA 897 [GE SL50] (with unique green and yellow safety stripes) arrived to haul it east to 36th Street Yard. How many more flatcars will arrive this way, remains to be seen.

Delivery of the first R252 Flatcar on the South Brooklyn Railway


.

.

RETURN TO INDEX

.


0L912 - MotivePower Incorporated R156 move (and other R156 arrivals) w/ SBK N2 & N1 & NYCTA RD411 - May 1, 2012

.

   On May 1, 2012, the first locomotive in the 28 unit order for a new low emission diesel-electric work locomotive that had been placed by New York City Transit  / Metropolitan Transportation Authority was delivered to the NYCTA Linden Yard is Brooklyn., NY

  The locomotive was transported on her own trucks, but loaded upon an TTX Corp 64' specialty flat car HTTX #91796, and transported from MotivePower Inc.; in Boise, Idaho. It should be noted that HTTX 91796 is a 64' flatcar (which was specified by the NYCTA for delivery of these locomotives). This length flat car (or lack there) of would come into play in a future delivery.

   Two interesting tidbits, for this locomotive not SBK related:

1) The next number available for NYCTA work locomotives was to be 911. However, this became a sensitive number due to the 9/11 Terror attacks in 2001. So, the 911 number was skipped over, leaving 912 to be the next available number in sequence.
2) Technically, the locomotive number assigned to this first locomotive is 0L912  ("Zero El Nine One Two" not "Oh El Nine One Two". "Zero El Nine One Three" would be next, et al) Inside sources confirm this, despite the wrong character used in lettering!

  John Dooley posted the following image confirming this locomotives arrival in Bush Terminal via New York New Jersey Rail carfloat and subsequent haulage down First Avenue to the NY&A / LIRR interchange at 65th Street / Bay Ridge: http://www.nycsubway.org/perl/show?133502.


First Avenue & 53rd Street, Brooklyn, NY - May 1, 2012
NYNJ Rail #1133 w/ NYCTA OL912 enroute to 65th Street / Bay Ridge Yard interchange with New York & Atlantic Rwy.
John Dooley photo
used with permission

added 03 May 2012

.

.

   NYNJ Rail brought the locomotive into Brooklyn via carfloat at their 50th Street float bridge and hauled it along First Avenue, through the Brooklyn Army Terminal to the 65th Street / Bay Ridge Yard. Here it was interchanged with the New York & Atlantic Railway who picked it up in 65th Street / Bay Ridge Yard and made final delivery at NYCTA Linden Shops via the Bay Ridge Branch.

   From there, South Brooklyn Railway locomotives N2, N1 and NYCTA rider car RD411 brought 0L912 through the BMT system to the NYCTA Coney Island Shops for final calibration and testing. Click on screenshot below to watch video:


SBK #N2, NYCTA #0L912, NYCTA Rider Car #RD411 and SBK #N1
coming through DeKalb Avenue Station in Brooklyn, being push (N1) / pull (N2) South Brooklyn Railway locomotives
video by Trevor Logan, all rights reserved. Used with permission.

added 03 May 2012

.

.

   A new unloading ramp was constructed and installed at Linden Shops to unload 0L912 from its flatcar. After 0L912 was unloaded, the unloading ramp was relocated from Linden Shops to the Third Avenue & 38th Street "Unloading" Yard by May 20, 2012. The new unloading ramp was placed where the old subway car unloading ramp once stood.

   Before delivery of the next locomotive however (and as previously mentioned above), a notable event took place: the new interchange turnout between SBK and NYNJ Rail (now located at First Avenue and 39th Street) was tested January 2013 and activated. This "reconnection" allowed rail traffic to be directly interchanged between NYNJ Rail and the SBK once again and without involvement on the New York & Atlantic Railway. 

0L913 arrives - February 7, 2013

  The next locomotive to arrive: 0L913 arrived in Brooklyn on February 7, 2013. It too came in via carfloat by NYNJ Rail and was brought to Bush Terminal Yard. Here South Brooklyn Railway locomotives N1, N2, a transition car and a flatcar were dispatched to haul the 0L913 on its flatcar to the unloading ramp at Third Avenue and 38th Street, where 0L913 was then unloaded. 

   After unloading, the empty flat car was returned to NYNJ Rail. Incidentally and according to Ben Schaeffer, that flat car has the honor of being the last interchanged freight car to cross Third Avenue on the South Brooklyn Railway as of the June 2018 update to this website.

.

0L914 arrives (twice!) - March 21, 2013

   On March 21, 2013, the third locomotive of the order: 0L914 arrived. And here was where a problem arose. Remember in previous chapters above it being mentioned that the locomotives were specified to be shipped on 64' flatcars? 

   Well, 0L914 came in on a 89 footer XTTX 14278 due to the unavailability of a 64 footer. NYNJ Rail unloaded the flatcar from the carfloat with the locomotive on it and brought it to Bush Terminal Yard, where a NYCTA crew was waiting to take delivery using two standard R52 TA work locomotives [GE 45ton]: #77 and 76  (and not SBK N1 or N2) as well as two idler flatcars: OF616 and OF609. 

   The load was spotted by NYNJ Rail, the NYCTA crew coupled onto the load and away they went, enroute to the unloading ramp at Third Avenue and 38th Yard. Lo and behold, the flatcar would not navigate the curve approaching Third Avenue! And this being on the fairly recently installed (ca. 1995) trackage around Costco property perimeter... This new trackage was designed and tested to handle 75' subway cars, and it was not anticipated that very long modern freight cars would need to traverse the line.

   Upon this discovery, the NYCTA crew calls the NYCTA MOW Department, who rushed over to the Third Avenue and 38th St "Unloading" Yard, disassembled the new unloading ramp, transported it (disassembled) to NYNJ Rail's Bush Terminal Yard and reassembled it. Once that was accomplished, the NYCTA train crew returned to Bush Terminal Yard with the flatcar and locomotive load and they proceed to unload it. And thanks to this, 0L914 would become the first new R156 to be "delivered" on its own wheels via the South Brooklyn Railway!

   It was at this time that the powers that be wisely decided it would be best to keep unloading the subsequent locomotive deliveries at Bush Terminal Yard, and thereby eliminating the possibility of a repeat of this situation as well as the necessity of having the following locomotives shipped only on 64' flatcars. 

   We are fortunate to now share a video of this particular move. The video was filmed by Zack Summer and posted on YouTube: 

MTA NYC Subway R156 Diesel Train Delivery via South Brooklyn

.

   The next three locomotives and their arrival dates are as follows:   

   with others coming in fairly regularly (and no longer worthy railfan news!) with delivery completed about end of June.

   After the final locomotive was delivered, the unloading ramp was removed from the track and set aside in Bush Terminal Yard where it remains. 



LIRR caboose C60 move by South Brooklyn Railway - April 4/5, 2009

.

   On April 4, 2009; the Twin Forks Chapter of the National Railway Historic Society lent their recently restored Long Island Rail Road N22a "C60" caboose to the New York City Transit Museum located in downtown Brooklyn.

   The New York City Transit Authority's Transit Museum held an exhibit: "The Route of the Dashing Commuter: The Long Island Rail Road at 175" (celebrating the 175th anniversary of the LIRR - and this exhibit ends at the end of March 2010).

   The Long Island Rail Road handled transportation of C60 from Twin Fork's Riverhead, Long Island location to New York & Atlantic Railway's Fresh Pond Yard. From there New York & Atlantic Railway took the caboose to the NYCTA's Linden Avenue Shops in East New York.

   However, the South Brooklyn Railway handled the rest of the move from that location to the Transit Authority's 207th Street Yard in the Inwood neighborhood of Manhattan, as C60 needed final preparation for display in the Transit Museum.

   The following is an itinerary of the move:

Long Island Rail Road / New York & Atlantic Railway:
April 4, 2009 - 6:00 am - 8:00 pm
14 hours time in transit

Due to LIRR speed restriction of 15 mph along entire route. This special move also was required to take a siding to allow revenue trains to pass.
.

South Brooklyn Railway:
April 4, 2009 - 10:30 pm / April 5, 2009 - 7:00 am,
9.5 hours time in transit

This move of LIRR C60 on NYCTA trackage was quite convoluted due to trackwork,
forcing the South Brooklyn Railway to take the following route from Linden Shops:

.

   The total time C60 spent in transit encompassed 25 hours, roughly 100 miles (of railroad travel), three railroads, and five counties: Suffolk, Nassau, Queens, Kings [Brooklyn] and New York [Manhattan].

   The restoration of C60 and the subsequent move, and here are several outstanding photographs pertaining to the South Brooklyn Railway portion of the move:


LIRR C60 w/ SBK N2, NYCTA "rider car" RD411 and SBK N1 in background.
April 4, 2009 - NYCTA Linden Shops, Brooklyn, NY
P. F. Strubeck photo

added 24 Dec 2009

.


NYCTA "rider car" RD411 and SBK N1 - April 4, 2009 - NYCTA Linden Shops, Brooklyn, NY
P. F. Strubeck photo

added 24 Dec 2009

.


SBK N2 (foreground) with NYCTA "rider car" RD411 and SBK N1 - April 4, 2009 - NYCTA Linden Shops, Brooklyn, NY
P. F. Strubeck photo

added 24 Dec 2009

.


SBK N2 & LIRR C60 - April 4, 2009 - NYCTA Linden Shops, Brooklyn, NY
Note airline extension and coupler extension (which according to Paul Strubeck it weighs approximately 200 pounds,
is over 75 years old and was originally from the Boston & Maine RR).
P. F. Strubeck photo

added 24 Dec 2009

.


SBK N2 & LIRR C60 - April 4, 2009 - westbound on the "BMT Jamaica / Broadway Line"; now NYCTA lines
crossing the Williamsburg Bridge; East River, NY
P. F. Strubeck photo

added 24 Dec 2009

.


SBK N2 & LIRR C60 - April 4, 2009 - Subway Tunnel; Manhattan, NY
P. F. Strubeck photo

added 24 Dec 2009

.


SBK N2 & LIRR C60 - April 4, 2009 - BMT "West End Line" / now NYCTA line - Ninth Avenue Station
 Sunset Park, Brooklyn, NY
P. F. Strubeck photo

added 24 Dec 2009

.

.


1983 - new NYCTA #L899 and L900 [General Electric SL50] locomotives being delivered to 39th Street Yard (between First and Second Avenues) waiting to be brought to the 38th Street "Unloading" Yard.
Brooklyn, NY
M. DeLuca photo
collection of P. M. Goldstein / P. F. Strubeck

added 02 July 2018


Bombardier R62A Subway Cars ('A' Division - IRT ) at 39th Street Yard (between First and Second Avenues waiting to be brought to the 38th Street "Unloading" Yard.
Brooklyn, NY
M. DeLuca photo
collection of P. M. Goldstein / P. F. Strubeck

added 02 July 2018

.

.

RETURN TO INDEX

.


Original Right Of Way Remnants

.

   On 26 January 2010, a long time friend and fellow New York rail enthusiast and myself traced the original route of the South Brooklyn Railway to commit as many of the remnants we could find to record before being completely obliterated.

   We began our journey at the Coney Island Yards of the New York City Transit Authority. Unfortunately, shadows and a chain link fence make a good image difficult of the track that led out onto McDonald Avenue:


South Brooklyn Railway track (foreground) at Coney Island Yard - January 26, 2010
authors photo

.

.

   The next location north that we could locate and knew of, was that of the coal supplier located between Avenue S and Kings Highway. While the concrete coal silos were torn down many years ago, the ground floor entrance still remains as does tracks embedded in the sidewalk.


South Brooklyn Railway spur into former Flatbush Coal at Avenue S and McDonald Avenue - January 26, 2010
authors photo

.

.


South Brooklyn Railway Spur into former Flatbush Coal at Avenue S and McDonald Avenue - January 26, 2010
authors photo

.

.

   Our next stop traveling north was Parkville Interchange. Nothing remains of the trackage, but the ironically the unique curved wall warehouse of Leeds Paper / Scheck Brothers was in the process of being demolished that very day! We were a little too late for the Scheck portion of the wall, but the Leeds wall was still standing. So, we took pictures. You can barely make out the curved wall at the middle of the left edge of the photo.

   Oh, and that driveway is the former right of way connecting the South Brooklyn Railway with the New York New Haven & Hartford & Long Island Railroads:


Leeds Paper / Scheck Brothers Warehouse - SBK & NYNH&H / LIRR Parkville Interchange - January 26, 2010
authors photo

.

.

  The next stop was Kensington Junction, but truly nothing remained and while we able to identify the right of way; new structures, a gas station canopy and a red moving truck occupied the scene. Just under the station canopy, the sea-green Culver Elevated can be seen:


looking southeast at McDonald Avenue - January 26, 2010
authors photo

.

.

   Now, while we continuing north, 37th Street ran against us, so we circumvented this portion and proceeded to Second Avenue and 39th Street, to back track. But I am posting the images of 37th Street here to keep the continuity of our "journey" north / westward.

   At Fifteenth Avenue, a rail can be seen peeking out of the concrete of a parking lot for cement mixers:


Looking west from 15th Avenue - January 26, 2010
authors photo

.

.

   In the photo above, the large multistory warehouse can be seen. Upon first examination, we could find no remnants of trackage leading to the warehouse. Hopping back in my truck we circled around the block and I had to wait for the traffic light. I looked down at the pavement and saw a crease in the asphalt. A few feet further, I could barely make out another crack. Lo and behold, the creases were as wide as railroad track!

   I immediately put my truck in reverse and backed into a parking spot to examine a little closer. The beige Nissan SUV in the image below is actually parked upon the tracks and the creases in the asphalt can be seen leading out towards the middle of the street from the two front tires:


Looking northwest on 37th Street between Fourteenth and Fifteenth Avenues - January 26, 2010
authors photo

.

.

The next photo was taken from the other side of the Nissan, and the rails can be clearly seen in the pavement:


Looking west - January 26, 2010
authors photo

.

.

   Now the tracks in the photo above run under that beige corrugated structure and would have led into the parking lot of that multistory warehouse. No trackage can be seen in the parking lot but upon walking through the parking lot to the center alley, revealed tracks still embedded in the pavement:

   Judging from the location of the track, (about 8 feet away from the wall and where the left row of cars are parked), leaves us to wonder if there was a loading dock running the length of the wall.


Looking west - January 26, 2010
authors photo

.

.

   Here is a closer look at the loading door and wall:


Looking west - January 26, 2010
authors photo

.

.

   Turning around and facing east is this view:


Looking east at parking lot of multistory warehouse with trackage curving towards 37th Street.
Visible trackage ends under the dumpster - January 26, 2010
authors photo

.

.

   Another block west, we were at the intersection of Fourteenth Avenue, Old New Utrecht Road and 37th Street. Again, rails could be seen peeking out of the pavement:


Looking east - January 26, 2010
authors photo

.

.


Looking west from centerline of Fourteenth Avenue - January 26, 2010
authors photo

.

.


Looking north at west curb line of Old New Utrecht Road - January 26, 2010
authors photo

.

.

   We could find no remnants from Old New Utrecht Road to Tenth Avenue, which begins the 36th Street Yard of the New York City Transit Authority. At this point a fine chain link fence (2" squares instead of the standard 4") is in place and really prevents photography. So, we made our way to Fourth Avenue. This begins the infrequently used but serviceable portion of the South Brooklyn Railway.

   I had to walk up the 38th Street exit ramp of the Gowanus Expressway to get past the chain link fence seen on the left edge of the photo. Doing so put me at a higher perspective and yielded unobstructed views of the 38th Street Yard between Fourth and Third Avenues.


Looking east toward Fourth Avenue and subway interchange with subway car unloading ramp - January 26, 2010
authors photo

.

.


Looking west at Third Avenue - January 26, 2010
authors photo

.

.


Looking west from Third Avenue entrance gate - January 26, 2010
authors photo

.

.

   From this point down, the trackage was reconstructed. So, while not original trackage, it is the continuation of the original route as close as we can get in the present day.

   These first images are of the crossing at Third Avenue:


Looking east from the center island (parking lot) of Third Avenue (northbound lanes) - January 26, 2010
authors photo

.

.


Looking west from the center island (parking lot) of Third Avenue (southbound lanes) - January 26, 2010
Costco parking lot on right behind fence.
authors photo

.

.

   We then proceeding to Second Avenue and parked between 39th and 37th Streets. This portion of the trackage was rebuilt to a new alignment in 1994.


Looking east from Second Avenue - January 26, 2010
Costco parking lot on left behind fence.
authors photo

.

.


Looking southeast from west curb of Second Avenue (and from the entrance of the SBK 39th Street Yard) - January 26, 2010
Note the gouges in the cement parallel to the rails from a minor derailment.
authors photo

.

.

   This is the original location of the Yard, but the track configuration has changed dramatically over the last two decades. This is the view after turning 180 degrees and after taking the image above:


Looking west at 39th Street Yard - January 26, 2010
authors photo

.

.

   At this point we made a U-turn and drove to 39th Street and Second Avenue and made a right and headed past First Avenue. To our good fortune, the gate to the South Brooklyn Marine Terminal was open.

   This is the view of the 39th Street Yard from the Terminal looking east:


Looking east at South Brooklyn Railway 39th Street Yard from Marine Terminal - January 26, 2010
authors photo

.

.

   Now, this location was serviced by New York Cross Harbor Railroad when American Stevedoring occupied the premises. Currently, there is is a lot of reconstruction under way. Notice the tracks in the image above are cut short. These two tracks come together and the track ran parallel to the Pier Shed servicing loading docks seen in the image below. Also note the pavement has been torn up and temporary fill is in place. Obviously, this portion of the right of way is currently being reconstructed and appears it will be placed back in service for a new tenant.


Looking west at loading docks of South Brooklyn Marine Terminal - January 26, 2010
authors photo

.

.

   Of particular interest is the fact that the track is being rebuilt using lengths of welded rail (not standard 39 footers) and concrete ties:


looking west - January 26, 2010
authors photo

.

.

RETURN TO INDEX

.


Escort Vehicles

.

   Another interesting facet of South Brooklyn Railway operations was that prior to the abandonment of those street running parts of the route, train movements would employ the use of a escort vehicle while operating on public thoroughfares. According to Brooklyn Transit historian Ben Schaeffer, the escort vehicles were mostly used when moving subways cars and not during general freight operations.

   There are two known escort vehicles that served the South Brooklyn Railway. The first vehicle is what appears to be a 1971 Ford "Country Squire"; license plate: NY 7897BV. It is definitely in police livery, but it is unknown at this time whether it is New York City Police Department or New York City Transit Police.

.

.

   The second vehicle known to have escorted trains, was a bright red 1973 Plymouth Valiant, license plate: NY 14522-K

.

.

RETURN TO INDEX

.



Dual Couplers, Compromise Couplers (Coupler Adapters) & Transition Cars

.

   Unique to South Brooklyn Railway operations over and above all the other industrial and offline terminal railroad operations covered by this website, is the fact that the South Brooklyn Railway must transport subway cars in addition to standard freight cars. Not just those new subway cars arriving and obsolete models being shipped out, but also hauling the varied equipment comprising the museum collection throughout all eras of NYC Transit history.

   As technology progressed, these couplers changed in function and style; from early and simple Van Dorn couplers (which were similar to link and pin), to the current automatic type couplers self-containing of air and electrical connector lines and being able to be uncoupled by the push of a button in the cab of the subway car. A list of couplers used by subway car models as follows:

subway car model coupler model (for #1 end)
Van Dorn a
R1 - R9 WABCo H2A
R10 - R22 WABCo H2C
R26 - R28 (pre-GOH) WABCo H2C on #1 end, H2CAR (semi-permanent for married pair operation) on #2 end
R26 (GOH) and R28 (GOH) WABCo H2C on #1 end only b
R29 and R29 (GOH) WABCo H2C on #1 end only b
R30 - R30A WABCo H2C on #1 end, H2CAR (semi-permanent for married pair operation) on #2 end
R32 WABCo H2C b
R33, R36 (all versions) WABCo H2C b
R38 WABCo H2C b
R40S, R40M, R42, and all GOH versions... WABCo H2C b
R44 (pre-GOH) Ohio Brass Form 70 c  (will mate with H2 types)
R46 (pre-GOH) Dresser w/ centering device (Ohio Brass Form 70?) b? c?
R46 (GOH) Hadady Coupler #RTD-107 w/ centering device b
R62 - R68A WABCo H2C b
R110A WABCo N2C b
R110B NYABCo H2C(m) #RTC-201P? b
R142, R142A WABCo model # unknown b (Tomlinson style-flat faced, hook type with electrical portions)
R143 WABCo model # unknown b
R160A, R160B WABCo model # unknown b
R179 model # unknown b
R188 model # unknown b
R211 model # unknown b

WABCo = Westinghouse Air Brake Company
NYABCo = New York Air Brake Company
GOH = after General Overhaul

a
= Most, but possibly not all, early subway & el cars equipped with Van Dorn couplers were converted to H2A's
b
= Couplers are listed for #1 (operating cab) end. Post-GOH & modern subway car #2 ends are permanently coupled with linkbars
c = will mate with H2A and H2C according to compatibility charts.

NOTE: Despite certain models of subway cars have the same model coupler, does not mean that those different subway car models are compatible
of being coupled & operated together. Compatibility is based upon brake equipment, and other systems.

   Before progressing any further, it must be kept in mind that when freight locomotives such as those operated by the South Brooklyn Railway, it is not necessary to have any electrical connections to the subway car(s) being towed, and it is only necessary to have a physical coupler match to that particular subway car, not an electrically operative one.

   As such, those compromise couplers sharing physical profiles with one another could be used with various models of subway cars. However, which of those model subway car couplers on the above list that share physical profiles with another is not known at this time. It is presumed but unconfirmed that a compromise coupler suitable for mating to and H2A would be compatible with an H2C. I am trying to ascertain this information for inclusion here.

   In any event, even this assortment of coupler models would pose a physical match incompatibility when trying to mate with the standard MCB (Master Car Builders) or AAR (American Association of Railroad) couplers found on typical freight cars and locomotives, hence the need for compromise couplers.

   Locomotives #1, #2 and #3 show (by viewing the images in the locomotive photo chapter below) that they were equipped with Van Dorn type couplers. It is not known if these locomotives were ever converted to MCB couplers, and it is not believed so, as images of #1 in storage show it to still be equipped with Van Dorn couplers.

   But it is known that there is a Van Dorn / MCB compromise coupler, and was used on 17 November 1998 when Car "G" (which was built in 1878 as New York Elevated RR #41 and  subsequently converted to a money collection car by Manhattan Railway in 1898. In 1998, Car "G" was loaned from the Shore Line Trolley Museum  located in East Haven, Connecticut; to the New York City Transit Museum collection displayed in former Court Street Station. It had to be trucked from Connecticut to the NYCTA's 207th Street Facility where it was unloaded. It was at this location that Car "G" was coupled to South Brooklyn Railway locomotive N2, utilizing a Van Dorn to MCB compromise coupler, and brought to Court Street Museum.

Car "G" on left with Van Dorn to MCB Compromise Coupler with SBK N2 on right.
November 17, 1998
N. Gerstein photo

.

   This image allows us to conclude that despite the advanced age of museum rolling stock and likewise its coupler profile of the series, the South Brooklyn Railway has an assortment of compromise couplers for movement of the museum pieces as well as re-purposed equipment pressed into maintenance of way service. 

   Locomotives #1, 2 & 3 are seen throughout their history in images equipped with Van Dorn couplers. It does not appear that either of these locomotives were converted to MCB/AAR coupler. 

   Locomotive #4 shows only an MCB/AAR style coupler, as does locomotive #5.

   However, locomotives #6 and #7 were equipped with dual couplers, meaning they had both an MCB and a H2 subway car coupler mounted side by side on a common coupler shank, on both the front and rear of the locomotive. All a brakeman had to do, was move the desired coupler into position:


dual couplers on SBK 7 - April 2008
coupler on left: MCB (freight cars)- coupler on right: H2 (subway cars)
Coney Island Yard, Brooklyn, NY - TA Roadeo
P. F. Strubeck photo
added 24 Dec 2009

.

   After the electric locomotives with dual couplers were retired, the South Brooklyn Railway diesel locomotives (which were equipped with standard MCB/AAR couplers) would need a compromise coupler or a transition car to pull subway cars.

   Some of these unique, essential and all-to-often overlooked pieces of equipment necessary to South Brooklyn Railway operations. Here are just two examples of the many types used:


H2 (left) to MCB (right) Compromise Coupler (with knuckle lock pins) - April 2008
Observation / Inspection Car 0F116 on left, SBK N1 on right
Coney Island Yard, Brooklyn, NY - TA Roadeo
P. F. Strubeck photo

added 24 Dec 2009

.


MCB to H2 Compromise Coupler - (MCB face showing) - October 2008
Trolley Museum of New York; Kingston, NY
P. F. Strubeck photo

added 24 Dec 2009

.

   With the utmost thanks to my "source" at the NYCTA; here is a composite photo of the issued poster that circulates with the Authority. The left panel is comprised of photos showing the types of car couplers encountered on subway equipment - both work (non-revenue) cars and revenue (passenger) cars. The right panel are photos of the adapters to be used for those couplers. Please note that the couplers shown for revenue equipment are for equipment in active service (when the poster was issued), and not for retired cars or cars in the Transit Museum.


thanks MW!

.

.

   Most of the Transit Authority work locomotives equipped with MCB couplers operating in the transit system have coupler adapters located on the locomotive deck just in front of the cab. Seen here is an H2C to MCB adapter on the left and Flat Face to MCB adapter on the right:


.

.

Transition Cars

   Also encountered and similar in usage is the "transition car". This piece of rolling stock is equipped with MCB or AAR type of coupler on one end, and subway style coupler on the other. 

   Relatively speaking, almost any common freight car can be converted into a transition car; with one of the couplers changed to the type needed and it is not a hard process to accomplish. In "olden days" three or four men could change a coupler. Today, a small truck mounted jib crane is used. 

   As these freight cars are already AAR / FRA inspected and certified for use on main line tracks throughout the United States; they were suitable for use in bringing new equipment from anywhere in the US to the NYCTA interchange; or in those cases for old equipment to be brought to a rebuilder over main line trackage.

   Within this page, you can find photos showing many different types of transition cars. Usually, gondolas or flatcars were used for pulling new and rebuilt subway cars off flatcars at the loading ramp at the 38th Street "unloading" yard, as these would be of the lightest types of freight cars in use. NYCTA cut down some older subway cars to the floor, installed an MCB coupler on one end and used that to offload new subway cars off the flat car transporters. This became one of their "internal" (not to venture outside the subway system) transition cars.

   As the different subway car manufacturers were located in various parts of the United States, these subway car builders would have had to contract with the trunk line railroad near their construction shops to move the NYCTA subway cars east.

    Subway car rebuilders were located in:

   While not for certain, it would be logical that each trunk line railroad that might have hauled these subway cars to the New York area, would have had their own transition car. Since most of the Midwestern railroads did not have terminals on the New Jersey shore of the Hudson River would have had to consign the shipment to a eastern railroad that did, and then that railroad would need to use a transition car as well. Lehigh Valley, Delaware Lackawanna & Western, New York Central and Pennsylvania Railroads (among others) all had terminal facilities in New Jersey equipped for carfloating the subway cars to Brooklyn.  

   And we know by the photos below, that New York Central did indeed have a transition car, as did the Lehigh Valley and the Delaware, Lackawanna & Western Railroads. How many others remains a mystery. For the record, changing a coupler on a freight car is not a terrible task, and can usually be completed by two men in under an hour. 

   While duplicitous, I show these photos again here for clarity:


#13 - Shell Road and Avenue Y - May 31, 1961
Bringing brand new R30's into Coney Island Yard with New York Central gondola transition car.
Under the "Culver / Sixth Avenue" line.
A. J. Lonto collection
ERA Headlights May - June 1993 Issue

added 22 Dec 2009

.


Parkville Interchange - Brooklyn, NY - March 21, 1965
Note the air reservoir in the gondola. This Lehigh Valley gondola was modified
for use in hauling subway cars on Lehigh Valley trackage on mainland U.S. trackage and is apparently capable of transition use between
standard AAR couplers (on Class 1 and SBK diesels) and the subway car H2A type couplers.
D. Grotjahn photo
D. Pirmann collection

added 19 Dec 2009

   .


#13 - unknown date - Ninth Avenue
R32's enroute to Coney Island. Note the DL&W gondola being used as transition car.
The train is climbing the ramp from subgrade to street level.
J. Shanus photo

J. Testagrose collection
added 06 September 2009

.


Parkville Interchange - Brooklyn, NY - February 18, 1972
R44's going out to LIRR for speed testing and delivered to Parkville Interchange with R1 M502 transition car.
Note transition car is marked "MCB" for MCB coupler on that end.
Other end of transition car has H2A coupler to mate with R44's. (Form 70's and H2A mate on the compatibility chart)
S. Zabel photo
J. Testagrose collection

added 19 Dec 2009

   In February of 2020, I was involved in a dialog in a Facebook group where another group member insisted that the opposite end of the transition car (M502) shown in the image has MCB couplers on both ends, and a coupler adapter was used to mate with the R44's. 

   After having spoke with Benjamin Schaeffer and Michael DeLuca; it turns out Mr. DeLuca was present for this move. There was NO coupler adapter between the R1 and the R44. The R1 car was exactly as I have described:

MCB coupler on one end (closest to the camera) and H2A coupler on the other end (coupled to R44's).

   According to the NYCTA compatibility chart; H2A and Ohio Brass Form 70's will mate. Therefore no compromise coupler / adapter is needed between the H2 and Form 70. 

   An image of the H2A end can be seen here: M502 H2A end image - nycsubway.org

   I was also told that compromise couplers (a/k/a coupler adapters) did not begin use on the TA until 1975; but transition cars are still used as necessary (such as on the unloading ramp in the photo below, when needed and when weight loading prevents direct coupling with a compromise coupler.

   Furthermore, this same Facebook group member insisted that M502 is not called a transition car, but a "spacer" car. Again, I inquired of Mr. Schaeffer. As I have been told, a spacer car has MCB coupler on both ends and is used to spread out the weight of the work locomotives which also have MCB couplers front and rear. Furthermore, these "spacer" cars are listed as a Rider Cars (RDxxx) in NYCTA rosters. This is NOT the case in this photo.

   For the record, Mr. Schaeffer is employed with the NYCTA for over 23 years, and Mr. DeLuca has been employed by several railroads since the 1970's. I believe their tenure qualifies their industry knowledge, over and above the fact that both have been avid transit / Brooklyn railroad buffs even longer than their professional railroad careers.


.


N1 - August 1988 -
38th Street between Fourth and Third Avenues
Looking south west. Unloading rebuilt R42's tranported atop flat cars with transition car, which appears to have made from the chassis of a subway car.
D. Pirmann collection

added 22 Dec 2009

.

.

RETURN TO INDEX

.


Locomotive & Equipment

.


   Due to the large and growing amount of images accrued of locomotives and equipment operated by the South Brooklyn Railway; it has been deemed necessary to place the collection of images on their own page, like what I have done previously with Brooklyn Eastern District Terminal, Bush Terminal and New York Dock:

South Brooklyn Railway - Locomotives & Equipment - Images & Roster

.

.

RETURN TO INDEX

.


   While we are discussing the routing of the South Brooklyn Railway, it should be also be noted that it shared a portion of its route with four different subway lines over its history. Adding confusion for a lot of non-Brooklyn railfans as well as modern era NYC Transit buffs, was that these four different subway lines used various or the same parts of the Culver Elevated over its the history. While this technically has nothing to do with the actual operation of the South Brooklyn Railway, it does reflect why subway cars on the elevated lines in those photos taken throughout the decades have different route letters displayed. Further confusing matters on Transit Maps was that the line "bullets" (the colored circles) changed colors throughout the years.

Culver Line Culver Line Culver Line Culver Line Culver Shuttle Culver Shuttle Culver Shuttle
1925 - 1954 1954-1967 1967-1979 1979-present 1954-1960 1960?-1967 1968-1975

   Beginning in 1925, with the delivery of the BMT D Type or "Triplex" cars and the IND R1 cars in 1931, head end destination signs were incorporated into the design. The line that followed the South Brooklyn Railway routing was known as the BMT 5 or Culver Line.  

   Commencing from the lower level of the Ninth Avenue Station at 37th Street, the BMT took to an elevated structure directly over the South Brooklyn Railway right of way. This elevated line turned south at Kensington Junction and continued over Gravesend Avenue. This elevated was completed in several stages throughout 1919 until gradually reaching Coney Island in 1920.  


   In 1932, Gravesend Avenue would be renamed McDonald Avenue, in honor of John. R. McDonald, chief clerk of the Brooklyn Surrogate’s Court, who died suddenly.

   In 1954, with the construction of the IND Culver Ramp between Church Avenue and Ditmas Avenue completed, the BMT Culver Elevated was transfered to the IND Division, becoming the IND Culver Elevated, but the BMT  train began running upon the Culver Elevated over McDonald Avenue from Ditmas Avenue to Coney Island. Also on this date, the BMT route was truncated. This now shortened route operated between Ninth Avenue (lower level) and Ditmas Avenue and was designated the Culver Shuttle .

   In 1960, the Culver Shuttle was given the new graphics route bullet: which in turn became the  in 1968. These new bullets appeared only on the maps because in fact the older equipment relegated to the actual shuttle service was not equipped with the new graphics. 

   On November 26, 1967 with the opening of the Chrystie Street Connection in Manhattan, the  operating over the Culver Elevated was replaced with  the  Culver Line / Sixth Avenue Local.

   On May 11, 1975, the Culver Shuttle service was abolished. 

   In 1979, the color of the subway line bullets were changed to reflect and color coordinate their primary Manhattan routing. Therefore the    became the (with the orange color denoting Sixth Avenue routing regardless of being express or local)

   The Culver Shuttle elevated structure would not be demolished until the mid 1980's, well after the South Brooklyn Railway right of way under the el had been abandoned in 1978. The   still operates on the elevated over McDonald (formerly Gravesend) Avenue.

   And if this didn't help you figure it out, nothing will.. My head still spins trying to figure it out too. So let us get back to the SBK, shall we? â˜»



Memorabilia


Arrival Notice - May 5, 1908
3 1/4" x 5 1/2"

authors collection
added 25 July 2021
.

.


#6 Envelope - postmarked October 1908
authors collection
added 02 July 2018
.

.


#11 Envelope - postmarked February 1934
authors collection
added 02 July 2018
.

.


Maximum Car Measurements - July 1955

a gift to the author from Benjamin W. Schaeffer 
authors collection

added 10 March 2011

.

.



Car Clearance Tags
formerly Benjamin W. Schaeffer collection
authors collection

added 25 July 2021
.

.


#6 En
velope - ca. 1960
a gift to the author from Benjamin W. Schaeffer 
authors collection

added 10 March 2011

.

.


#6 3/4 En
velope - December 1959
authors collection

added 10 March 2011

.

.


#11 Envelope - December 1963 (postmarked May 1965)
authors collection

added 10 March 2011

.

.


Car Demurrage Record - July 1974
(note it still lists "steam car" even though printed in 1974!)
a gift to the author from Benjamin W. Schaeffer 
authors collection

added 10 March 2011

.

.

.....

Cover letter, system map & station list, (8 1/2" x 11")
1942 tariff sheet (8" x 11")

1945
authors collection
added 18 August 2021
.

.


System Advertisment? - undated

a gift to the author from Benjamin W. Schaeffer 
authors collection

added 10 March 2011

.

.


MTA News - July 1975
a gift to the author from Benjamin W. Schaeffer 
authors collection

added 10 March 2011

.

.


(may or may not be South Brooklyn Railway)

authors collection
added 02 July 2018
.

.


South Brooklyn Railway  #13 Automatic Brake Handle
South Brooklyn Railway #12 Independent Brake Handle
brass Yale lock -  NYCTS / IND
brass Wilson Bohannon lock - NYCTA
Both brake handles were gifted to the author by M. DeLuca, of who's images grace this page.

authors collection

added 02 July 2018
.

.

Norton's Point Line Tickets & Transfers

   The South Brooklyn Railway, while mostly recognized by New York area rail enthusiasts as a freight railroad, also owned and operated the Norton's Point Line, which was a passenger only line.

   According to Edward S. Watson in his history of various lines in Coney Island (source: New York Division Bulletin, Vol. 21, No. 2, February, 1978, p.3.), the Norton's Point Line began operations as a steam powered passenger line on June 9, 1879, and was routed from the Culver Terminal at West 6th Street and Surf Avenue and via a Private-Right-of-Way west to the Norton's Point Dock. This line later became part of the "Culver" steam line.


   In 1899, the line was electrified and was called Coney Island - Norton's Point Line. Commencing on the date of electrification,
elevated cars equipped with trolley pole were used. After July 3, 1910; conventional surface trolley cars were used. In 1912, the line was doubled tracked from West 8th Street to West 37th Street.

   On May 25, 1918, the east end of the line was cut back from the Culver Terminal (surface) at West 6th Street to the new elevated Stillwell Avenue Terminal. An incline was constructed between West 16th Street and spanned over Stillwell Avenue, connecting directly to the now elevated Stillwell Terminal offering rapid transit services via West End, Sea Beach, Culver and Brighton Lines. Furthermore, a physical connection of Norton Point Line trackage and the rapid transit system allowed cars to be interchanged. Also, f
rom May 25, 1918 to October 19, 1919, elevated cars operating singly on the line were used once again, returning to conventional trolleys after that date.

   In 1929, the west end of the Norton Point Line was physically connected to the Sea Gate Line at West 37th Street. Operation of the Norton Point Line ceased on November 7, 1948; and its history past this date is now connected with the Norton's Point Shuttle Line and the Sea Gate Line. 


   The small format tickets shown below are continuous ride tickets; allowing a fare paying passenger of the Norton's Point Line to ride on the New York City Rapid Transit lines at Stillwell Avenue Station, without having to purchase a second 5 cent fare. From the wording, it is to be understood these tickets were used between June 1940 (First Unification) and November 1948 (end of service on the line). This time frame is based on the wording on the ticket; as it refers to the "Rapid Transit Lines of the New York City Transit System". The "New York City Transit System" is the name of the system after the "First" Unification which took place in June 1940; unifying the individual operating companies: IRT, BRT / BMT, IND, et al) under one entity, the Board of Transportation - City of New York - New York City Transit System. (After the second unification in July 1953, it would become the New York City Transit Authority.) Furthermore, the tickets could not have been issued earlier than 1918, which is when the line was cut back to Stillwell Avenue, making that location the easternmost terminal of Norton's Point Line service.


  • no prefix serial number
  • serif "Not Transferable"
  • wide spacing above and below horizontal rule
  • serif type face back text
  • N. Y. Globe Ticket Co. Inc outside text box
  • prefix serial number (M & P observed)
  • sans-serif "Not Transferable"
  • minimal spacing between horizontal rule
  • sans-serif text
  • N. Y. Globe Ticket Co. Inc and "union bug"
    inside text box
both: authors collection


collection of Len Markowitz authors collection





.


   This next item, while not directly South Brooklyn Railway, is from one of the very few freight customers from the line. It is an ink blotter from Flatbush Avenue Coal, which was located at 2036 Gravesend Avenue between Kings Highway and Avenue S (to become McDonald Avenue after 1931.)

.
Flatbush Avenue Coal Ink Blotter

6 1/4" x 3 3/8"

authors collection

.

RETURN TO INDEX

.


South Brooklyn Railway Memoirs

   

The Bocce Courts


   Some of the fondest memories some South Brooklyn Railway fans have, is of the bocce courts on the right of the way along 37th Street.

   Never to forget their heritage and the old country, some of the neighborhood Italian elders used the South Brooklyn Railway tracks north of Kensington Junction as a bocce court. The dirt and mud between the two running tracks was leveled and packed, and it was found to be ideal for playing bocce, with the rails serving as boundary bumpers.

   These bocce courts were even appointed with removable backstops, so that when that occasional train would venture down the line, the elders would simply remove the backstop to allow the train to pass. As train speeds were only a few miles an hour and as the elders had long since established a relationship with the locomotive crews, there were never any issues. Note the bocce court is between the north and southbound tracks and not between the track gauge itself.

   In the photo below left, we can see and home heating oil tank truck marked for Cirillo Brothers. Cirillo was a customer of the South Brooklyn Railway, which had delivered coal to their silos located at 13th Avenue and 38th Street (just out of view top left of image. When coal fell out of favor as a home heating source, Cirillo (as many other fuel suppliers) transitioned to heating oil.

   The date of these photos are 1976, which also means these tracks would only see railroad activity for approximately two more years - 37th Street right of way was embargoed February 1978, after which no more trains would use the trackage.

   

The Avenue I Flea Market / Parkville Interchange

   As mentioned in the Parkville Interchange Chapter, the location became the home to the Avenue I Flea Market in 1976, a 600 stall indoor flea market and food venue. Parking in the "back lot" was on top of the old South Brooklyn Railway / Penn Central railroad tracks of the interchange, still in place but now hard packed dirt or Belgian block.. I always wondered as a kid what would happen if the train needed to through, and all those cars needed to move - but I was too young to know that the Parkville Interchange had been abandoned by Conrail in 1976.

   More than than, I vividly remember the red letter on white Railroad Crossing crossbuck on the utility pole at the corner of 20th Avenue and Avenue I.

   I always wondered the significance of it being red on white as opposed to the DOT / FHWA standard black lettering on white background.

   After going through the FHWA (Federal Highway Administration) website and searching the internet for over an hour, I find no reference to this version of railroad crossing sign.

   Since the railroad crossing was hardly used, I think it may me an early "exempt" railroad crossing sign; which meant school buses, commercial buses and vehicles hauling hazardous materials do not need to stop; as opposed to the  black lettered version which denoted a
standard active crossing.

   I always wanted to procure that particular and unusual crossing sign; but alas one day it was gone; but it lives on in my memory.

January 1976
M. DeLuca photo
collection of author
added 20 Oct 2026


A Trip Along the Bay Ridge Branch and a Chance Encounter with SBK

   Being a Brooklyn resident of the Gravesend neighborhood, and living within walking distance to South Brooklyn Railway's McDonald Avenue trackage, I remember when the first portion of the McDonald Avenue trackage was removed from service, and then the second.

   At least on one occasion many years before, I remember vividly as a child, sitting in the family car waiting for a traffic light to change when a big bellowing diesel locomotive sauntered by, running the street trackage on McDonald Avenue Instead of trying to outrun it to avoid being inconvenienced by it, my father would pull over to watch it with me. This didn't happen often, so it was a treat to see.

   Many year later, with me out of high school, and sometime in 1991 or 1992, my friends Dave, John, my sister Randi and I decided to go "exploring" the Bay Ridge Division tracks, now operated by Conrail. We took the subway (F Train) from Kings Highway to Avenue I, where we knew we could get onto the Bay Ridge Division right of way through the South Brooklyn Railway / LIRR Parkville Interchange at Avenue I and McDonald Avenue.

   Not long after we started walking, about 1/4 of a mile west of Parkville Interchange / McDonald Avenue and Avenue I; we found a Nolan TS-1 tool cart from the Transit Authority laying off to the side of the tracks. Well, since riding is always better than walking, and we set the cart on the rails, loaded our gear on the cart and set off towards Owls Head. After a few hundred feet, we discovered our stuff kept wanting to slide off the deck, so we looked through the debris and rubbish thrown into the right of way, and we found some wire that we used to tie our stuff down with. We then took turns sitting on the back of the tool cart pushing with our feet. When we would come to an incline, two of us would push. On our first down grade, the cart picked up speed to the point of making us nervous; and when the cart finally stopped, we found a 2" x 3" piece of wood, and we would jam it between a wheel flange and the frame to slow the cart down when going down the next hill. Don't kid yourself; Brooklyn isn't as flat as you think and that cart would pick up some pretty decent speed heading downhill and that "jam" brake was necessary.

   About 30 minutes later, (about 1.5 miles) the right of way really opened up, into the former "NU" Yard (New Utrecht) and we arrived at Fort Hamilton Parkway. Here, we took a well needed rest break and took the time to inspect an old position signal left over from the New York, New Haven & Hartford Railroad's days of ownership of the Bay Ridge Division. After watching some subway trains on the adjacent Sea Beach Line, we started off again. Once we started on our way again, we found the line started going downhill again to go under the subway tracks at Eighth Avenue and we picked up speed again.

   We arrived at the Fourth Avenue underpass about another 15 minutes later. The underpass actually stretches for a couple of city blocks, so it is more of a wide multi-track tunnel than a simple overpass, and it gets dark under there. We were about half way through, when I caught movement in front of us and to our right, and behind the concrete support pillars. For a change, I wasn't pushing (it did seem like I was the one always pushing...) I said something to my friends John and Dave about it, (and of whom couldn't care less).  Lo and behold 2 seconds later, here comes a headlight out from behind the pillars and onto our track!

   Well, we all panicked with visions of a Casey Jones type wreck, or the scene out of Stand By Me; so in an adrenaline fueled fright, we picked the tool cart up and literally threw the cart a good 15 feet off the tracks. Mind you with all our stuff still tied down on it: backpacks with clothes, my camera, and a large ice chest full of sandwiches and soda, and including the weight of the cart, we're talking several hundred pounds! My sister and friends ran behind the pillars and like the railfan I am, I stood off the tracks and watched the loco approach us. It wasn't going very fast (we didn't know that when we first saw it) and about a minute later the locomotive stops with the cab right next to me. It was South Brooklyn Railway N1 hauling some subway cars eastbound out of the Brooklyn Army Terminal trackage and Bush Terminal.

   By this time my friends and sister came out from hiding and the engineer had stuck head out the cab window and asked what we were doing. I told him we were heading to the Owl's Head Yard for a picnic, and to take pictures. He smiled, said "no problem" but to be careful. He told us he would be returning westbound around 2 p.m., so if we were to be on the track outside the yard, we were to keep an eye out for him heading towards us. He also told us vandals had broken into the firehose lockers in the Bay Ridge Yard and hose was stretched across the tracks, so that if we really wanted to get all the way to the water with the cart, we'd have to clean up some hoses.

   He told us his name, but my memory fails to recall it (somehow Angelo seems familiar) and he headed east. We rerailed our tool cart and headed west. We then came to a turnout where the tracks diverge for the Brooklyn Army Terminal to the right and the Bay Ridge Yard straight ahead, and the switch was thrown for the BAT, so we threw the switch, ran the cart through, and returned the switch to its original position. Then we came across a derail that was locked and we had to "hump" the cart over the derail (it's funny how the cart felt heavier now than in the moment of panic when we threw it off the tracks!)

   Once in the yard, we picked up and rolled quite a few rolls of firehose that morning to clear "our track" and finally made it to the water. I remember seeing a tug with the BEDT herald on its stack tied up along the wharf, and I went to get my camera. But, like a schmoe, I forgot to bring film! All that way, all that railroad history and memories, and I forget the film!

   After a few hours, and after some lunch and some exploring, we decided to head back to McDonald Avenue. We decided to take a roll of fire hose with us and one of the hose nozzles and we set off. We had to hump the tool cart over the derail (now it felt even heavier) and play with the switch again. We didn't encounter N1 all the way to McDonald Avenue, and when we went to unload, we realized we lost the hose nozzle somewhere along the way. We split the cart into two parts (as it was designed to) and buried the tool cart under some old tires and debris under an overpass for a future trip. A few months later when we returned (with film this time) to get the tool cart, the tool cart was gone.

   For what its worth, looking back upon it, that was one of my best days of "railfanning"!

The Avenue S Coal Dealer

   I also recall a moderately sized coal retailer (long since out of business during my years) with four 3 story concrete coal silos next to the Kings Highway Station, that I couldn't remember the name of. I saw it every morning I went to work, and every night I came home from work. Did I ever think to commit it to film? Of course not.

   One day, after creating this website, and while on the phone with Ben Schaeffer, I happened to mention it, and damn if Ben didn't know it off the top of head - "Flatbush Coal"!  Flatbush Coal was located between Avenue S and Kings Highway, adjacent to Colin Place & Billings Place. In the street was a turnout, off the southbound running track (trailing points heading south). The siding track entered under the silos. 

    This sight frequently greeted me as I disembarked from the "F" Train on my way home from work, and I was saddened to see that these coal silos were torn down several years ago during a visit to my old neighborhood.

.

.

RETURN TO INDEX

.




South Brooklyn Railway Feature Article Series

by Bernard Linder & Paul Eppler

 as published in bimonthly installments in February 1975 - October 1976 issues of the ERA Bulletin
New York Division of Electric Railroaders Association


permission for reprinting received from Jeff Erlitz, director of ERA



Special Thanks to:



Like what you see? Suggestions? Comments?


Click here to sign the:


Main Page
.

American Dock & Trust

Glossary of Definitions for Rail / Marine Terminal Operations in New York Harbor Seatrain Shipbuilding
Astoria Light, Heat & Power Harlem Station - Erie / EL South Brooklyn - NYCTA
Atlantic, Gulf & Pacific Harlem Transfer - DL&W South Brooklyn Terminal / Brooklyn Marginal
Atlas Terminal Jay Street Terminal / Connecting St. George Terminal - B&O
Bronx Terminal - CRRNJ Long Island City - LIRR Wallabout Station - Erie
Bronx Terminal - LV Military Railroads of the New York Metropolitan Area Wallabout Terminal - DLW
Bronx Terminal Market - NYC New York Container Terminal Wallabout Union Freight Station - PRR, NYC, LV, B&O
Bronx Terminals - Harlem River, Hell Gate & Oak Point Yards - NYNH&H New York Cross Harbor Waste Management
Brooklyn Ash Removal New York Dock West 15th St Freight Yard - CRRNJ

Brooklyn Dock & Terminal

New York New Jersey Rail / Port Jersey West 23rd St Freight Station - NYLE&W / Erie

Brooklyn Eastern District Terminal

North 1st Street Freight Station - NYNH&H West 26th St Freight Station - B&O

Brooklyn Wharf & Warehouse

North 4th St Freight Station - PRR West 27th St Freight Yard - LV
Bush Terminal Phelps - Dodge West 28th St Freight Station - Erie / EL
Comprehensive List of Transfer & Float Bridges Located in New York Harbor Pouch Terminal West 36th Street Freight Station - NYO&W / WSRR
Degnon Contracting / Degnon Terminal Procter & Gamble West 37th St Freight Station - PRR
Development of Car Float Transfer Bridges in New York Harbor Queens Subway Apartment & Loft Building West Side Freight Line & Operations - HR / NYC&HR / NYC / PC / CR
Double Ended Wreckers of the New York Area Railroad Operated Pier Stations of Manhattan 25th St / South Brooklyn Terminal - DLW
Freight Terminal Maps for Railroads in New York City Rikers Island 65th Street / Bay Ridge Yard - LIRR / NYNH&H / PRR
G & R Packing 207th St Yard - IND / NYCTA
.
Guestbook


As this particular webpage deals with an active railroad, viewers should be aware that:

this webpage or the author is not affiliated with:
.

South Brooklyn Railway,
New York City Transit Authority,
Metropolitan Transit Authority,
City of New York,
South Brooklyn Marine Terminal,
New York City Economic Development Corporation,
New York New Jersey Rail,
Davidson Pipe Supply Company, or
Costco Wholesale Corporation;

.

or any of their subsidieries, holding companies or parent organizations, employees or otherwise;
and no affliation or connection with those companies or municipalities is suggested or implied.

This website and the information contained within has been compiled for the use of reference only, and any inaccuracies are purely accidental.
This webpage sees revision for the purpose of the addition of information, or correction of inaccurate data.

Suggestions or corrections should be sent directly to:
bedt14@aol.com

.



.