Tender build 7 | 223 project


January 30, 2010 - The tank is resting on the frame and L brackets are waiting
to be attached to the tank then bolted to the frame when the tank has settled
into the wooden frame beams.



The left and right side panels were raised into position and bolts installed to pull them
into the sides ready for riveting.






Below are photos from March 27, 2010



Maynard uses the band saw to cut curved ends of the rear top deck piece


Below, the rlivet crew finishes the vertical row of the engineer’s side panel.



Below, Maynard and Kerry check the fit of the deck pieces, April 3, 2010



Lee Secrist grinding off a bad rivet for replacement, April 3